Roberts Bank Terminal 2 Project Public Consultation Overview - - PowerPoint PPT Presentation

roberts bank terminal 2 project
SMART_READER_LITE
LIVE PREVIEW

Roberts Bank Terminal 2 Project Public Consultation Overview - - PowerPoint PPT Presentation

Roberts Bank Terminal 2 Project Public Consultation Overview Preliminary Environmental Mitigation Concepts portmetrovancouver.com Consultation: September 15 October 10, 2014 Fourth round of PMV-led public consultation on RBT2


slide-1
SLIDE 1

portmetrovancouver.com

Roberts Bank Terminal 2 Project

Public Consultation Overview

Preliminary Environmental Mitigation Concepts

slide-2
SLIDE 2

portmetrovancouver.com 2

Consultation: September 15 – October 10, 2014

  • Fourth round of PMV-led public consultation on RBT2
  • Multiple opportunities to participate:
  • Consultation discussion guide and feedback form
  • In-person meetings
  • Two small group meetings
  • Two open houses
  • Local Government Elected Roundtable (September 16 in Surrey)
  • Port Community Liaison Committee small group meeting (October)
  • Online feedback form (portmetrovancouver.com/ RBT2)
  • Online discussion forum (porttalk.ca/ RBT2)
  • Information line

2

slide-3
SLIDE 3

p o r t m e t r o v a n co u v e r.co m

MEETI NG SCHEDULE

3

Meeting Date Tim e Location

Small Group Meeting Thursday, September 25 2: 00 p.m. – 4: 00 p.m. Coast Tsawwassen Inn, Delta Open House Thursday, September 25 5: 00 p.m. – 8: 00 p.m. Coast Tsawwassen Inn, Delta Open House Saturday, September 27 10: 00 a.m. – 1: 00 p.m. Kin House, Delta Small Group Meeting Monday, September 29 6: 00 p.m. – 8: 00 p.m. Delta Town & Country Inn, Delta

slide-4
SLIDE 4

p o r t m e t r o v a n co u v e r.co m

CONSULTATI ON NOTI FI CATI ON

  • Notification began week of September 2, 2014
  • Notification methods include:
  • Email notification
  • Newspaper advertisements
  • Postcards
  • Twitter
  • Phone calls
  • Letters to Mayors and Councils

4

slide-5
SLIDE 5

p o r t m e t r o v a n co u v e r.co m

CONSULTATI ON OVERVI EW

  • Providing information regarding the Project, including:
  • Project rationale
  • Environmental assessment process
  • PMV is seeking feedback on proposed mitigation measures

in a number of areas, including:

  • Light
  • Noise and Vibration
  • Air Quality
  • Onsite Habitat Concepts for Marine Vegetation, Invertebrates,

Marine Fish and Coastal Seabirds

5

slide-6
SLIDE 6

p o r t m e t r o v a n co u v e r.co m

NEXT STEPS

  • Discussion guide available September 15th
  • Input will be considered, along with technical and

economic information, and information obtained from Aboriginal groups and regulators, as PMV prepares and finalises the Environmental Impact Statement

6

slide-7
SLIDE 7

p o r t m e t r o v a n co u v e r.co m

RBT2 PROJECT UPDATES

  • Working Group
  • Next Meeting: Early 2015 – to provide a

walkthrough of the EIS after it is filed

  • CEA Agency Public Comment Period on RBT2 Draft Panel

Terms of Reference

  • submit written comments on the draft Terms of

Reference to RobertsBank@ceaa-acee.gc.ca by Septem ber 2 2 , 2 0 1 4

  • Information Sheets regarding the following:

Are available on-line at: www.robertsbankterminal2.com/ information-centre/

7

  • Air Quality
  • EA Process
  • Field Studies Program
  • Noise and Vibration
  • Container Movement
slide-8
SLIDE 8

p o r t m e t r o v a n co u v e r.co m

  • In addition to the consultation dates and times noted

earlier, there is an opportunity to have a small group meeting with this committee.

  • Dates/ Times:
  • Monday, October 6
  • 8am-10am
  • Tuesday, October 7
  • 8am-10am
  • 6pm-8pm
  • Location: TBD

SMALL GROUP MEETI NG - PCLC

8