roberts bank terminal 2 project
play

Roberts Bank Terminal 2 Project Public Consultation Overview - PowerPoint PPT Presentation

Roberts Bank Terminal 2 Project Public Consultation Overview Preliminary Environmental Mitigation Concepts portmetrovancouver.com Consultation: September 15 October 10, 2014 Fourth round of PMV-led public consultation on RBT2


  1. Roberts Bank Terminal 2 Project Public Consultation Overview Preliminary Environmental Mitigation Concepts portmetrovancouver.com

  2. Consultation: September 15 – October 10, 2014 • Fourth round of PMV-led public consultation on RBT2 • Multiple opportunities to participate: • Consultation discussion guide and feedback form • In-person meetings • Two small group meetings • Two open houses • Local Government Elected Roundtable (September 16 in Surrey) • Port Community Liaison Committee small group meeting (October) • Online feedback form (portmetrovancouver.com/ RBT2) • Online discussion forum (porttalk.ca/ RBT2) • Information line 2 portmetrovancouver.com 2

  3. MEETI NG SCHEDULE Meeting Date Tim e Location Small Group Thursday, 2: 00 p.m. – Coast Meeting September 25 4: 00 p.m. Tsawwassen Inn, Delta Open House Thursday, 5: 00 p.m. – Coast September 25 8: 00 p.m. Tsawwassen Inn, Delta Open House Saturday, 10: 00 a.m. – Kin House, September 27 1: 00 p.m. Delta Small Group Monday, 6: 00 p.m. – Delta Town & Meeting September 29 8: 00 p.m. Country Inn, Delta p o r t m e t r o v a n co u v e r.co m 3

  4. CONSULTATI ON NOTI FI CATI ON • Notification began week of September 2, 2014 • Notification methods include: • Email notification • Newspaper advertisements • Postcards • Twitter • Phone calls • Letters to Mayors and Councils p o r t m e t r o v a n co u v e r.co m 4

  5. CONSULTATI ON OVERVI EW • Providing information regarding the Project, including: • Project rationale • Environmental assessment process • PMV is seeking feedback on proposed mitigation measures in a number of areas, including: • Light • Noise and Vibration • Air Quality • Onsite Habitat Concepts for Marine Vegetation, Invertebrates, Marine Fish and Coastal Seabirds p o r t m e t r o v a n co u v e r.co m 5

  6. NEXT STEPS Discussion guide available September 15 th • • Input will be considered, along with technical and economic information, and information obtained from Aboriginal groups and regulators, as PMV prepares and finalises the Environmental Impact Statement p o r t m e t r o v a n co u v e r.co m 6

  7. RBT2 PROJECT UPDATES • Working Group • Next Meeting: Early 2015 – to provide a walkthrough of the EIS after it is filed • CEA Agency Public Comment Period on RBT2 Draft Panel Terms of Reference • submit written comments on the draft Terms of Reference to RobertsBank@ceaa-acee.gc.ca by Septem ber 2 2 , 2 0 1 4 • Information Sheets regarding the following: • Air Quality • Field Studies Program • Container Movement • EA Process • Noise and Vibration Are available on-line at: www.robertsbankterminal2.com/ information-centre/ p o r t m e t r o v a n co u v e r.co m 7

  8. SMALL GROUP MEETI NG - PCLC • In addition to the consultation dates and times noted earlier, there is an opportunity to have a small group meeting with this committee. • Dates/ Times: • Monday, October 6 • 8am-10am • Tuesday, October 7 • 8am-10am • 6pm-8pm • Location: TBD p o r t m e t r o v a n co u v e r.co m 8

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.