New Elementary School #42 Construction Documents Report Scott Washington Director, School Construction March 24, 2016 Project Update Provided paved access path from buss loop to the community walking path at the rear of the building


slide-1
SLIDE 1

New Elementary School #42

Construction Documents Report Scott Washington Director, School Construction March 24, 2016

slide-2
SLIDE 2

Project Update

  • Provided paved access path from buss loop to the

community walking path at the rear of the building

  • Reconfiguration kitchen area to accommodate

new equipment and to centralize the kitchen manager office

  • Update the building elevations in coordination

with the county Design Advisory Panel

slide-3
SLIDE 3

Site Plan

New Elementary School #42

slide-4
SLIDE 4

New Elementary School #42

E nlar ge d Site Plan

G

Sc ho o l b us pa rking fo r 18 b usse s. T he b us drive wa y is se pa ra te fro m the pa re nt dro p-o ff drive wa y to re duc e ve hic ula r c o ng e stio n o n site . T

  • pro vide a s muc h c a r pa rking o n site

a s po ssib le , 110 pa rking spa c e s ha ve b e e n pro vide d a mo ng the thre e a re a s

  • n site .

Pa re nt dro p-o ff a nd pic kup a re a a dja c e nt to the ma in e ntra nc e with a n a mple q ue uing a re a to e limina te inte rfe re nc e with the ma in pa rking lo t. Se rvic e drive with e me rg e nc y ve hic le a c c e ss to the pa ve d pla y a re a . Pa ve d pla y a re a a dja c e nt to g ymna sium a nd c a fe to rium. Sto rm wa te r ma na g e me nt b io -re te ntio n fa c ilitie s in a dditio n to the unde rg ro und sto rm wa te r ma na g e me nt fa c ility. Pla yfie lds ha ve b e e n lo c a te d a dja c e nt to the g ymna sium, c a fe to rium, a nd lo c ke r ro o ms, suc h tha t stude nts will no t ha ve to c ro ss ve hic ula r ro a ds o r drive wa ys to a c c e ss. L

  • c a tio ns o f o utdo o r c la ssro o m a re a s.

H F E D C B A

slide-5
SLIDE 5

i iv iv iii iii ii

Constr uc tion Doc ume nt F ir st F loor Plan First Floor Plan Schematic Design

New Elementary School #42

L E GE ND

K inde rg a rte n / E a rly Childho o d Grade s 1-5 Spe c ia l E duc a tio n Ce ntral Suppo rt Spa c e s Administrative Spac e s Building Se rvic e s Re c . a nd Pa rks 8 16 32

slide-6
SLIDE 6

iv iii iii iii

Constr uc tion Doc ume nt Se c ond F loor Plan First Floor Plan Schematic Design

New Elementary School #42

L E GE ND

K inde rg a rte n / E a rly Childho o d Grade s 1-5 Spe c ia l E duc a tio n Ce ntral Suppo rt Spa c e s Administrative Spac e s Building Se rvic e s Re c . a nd Pa rks 8 16 32

slide-7
SLIDE 7

New Elementary School #42

F r

  • nt E

le vation

slide-8
SLIDE 8

Total Project Budget

Base Construction Estimate Architect/Engineering Fee Construction Management Fee Related Costs Project Contingency Equipment and Technology Alternate #1: Outdoor Classroom at Main Entrance Alternate #2: Instructional Gazebo at Bus Loop Alternate #3: Sod in lieu of Seed Alternate #4: Neighborhood Storm water tie‐in Project Total Budget Funding Projections FY16 FY17 FY18 FY19 Total Funding Projections $32,994,732 $2,474,585 $2,350,000 $1,666,000 $1,666,000 $2,333,520 $232,978 $114,350 $46,975 $28,373 $43,907,513 $2,807,000 $16,526,000 $20,658,000 $4,132,000 $44,123,000

slide-9
SLIDE 9

Summary

  • Schedule

– Receive bids June 2016 – Construction starts September 2016 – Completion August 2018

  • Request approval of construction documents

and allow staff to proceed to project bid

New Elementary School #42