Marketplace Portal Redesign Member Test Kick-Off Meeting 2 Agenda - - PowerPoint PPT Presentation
Marketplace Portal Redesign Member Test Kick-Off Meeting 2 Agenda - - PowerPoint PPT Presentation
Marketplace Portal Redesign Member Test Kick-Off Meeting 2 Agenda Testing Timeline Marketplace Portal Redesign Overview Two-Factor Phase 1 Overview Test Checklist ALL Member Tests LSA Administration Tests Test
Marketplace Portal Redesign
Member Test Kick-Off Meeting
2
Agenda
- Testing Timeline
- Marketplace Portal Redesign Overview
- Two-Factor Phase 1 Overview
- Test Checklist
- ALL Member Tests
- LSA Administration Tests
- Test Environment
- Expectations
- RMS
- Reference Material
- Project Timeline
- Questions
3
Test Timelines
- May 1 – Member Test Approach and
Checklist published to CWG Project folder
- May 5 – Member Test Kick-Off Meeting
- May 12 – Makeup Member Test Kick-Off
- May 29 – Start of Member Testing in MTE
- June 2 – 1st Testing Checkpoint Meeting
- June 16 – 2nd Testing Checkpoint Meeting
- June 26 – End of Test Period
- June 26 – All Test Checklists Due to SPP
4
Portal Redesign Overview
- Move the Integrated Marketplace Portal to a
platform supported by SPP
- Rebuild all screens and functionality that exists
in the current Marketplace Portal using this new platform
- Rebuild all user and role administration
functionality that exists in the current Marketplace Portal
- Update all documentation to reflect changes
- Ensure all functionality and data of the current
Marketplace Portal is still available in the “new” Marketplace Portal
5
Two-Factor Phase 1 Overview
- Phase 1 implementation will coincide with
the Integrated Marketplace Portal Redesign project and will impact all users
- f the Integrated Marketplace Portal as all
users will need to comply with new password requirements in order to retain access.
- Local Security Administrators (LSAs) will
have new functionality available in the Marketplace Portal on the “Manage Users” screen for administering passwords and API Keys.
6
Test Checklist
- There will be one Test Checklist that will need
to be executed and returned to SPP.
- The checklist will have two tabs.
- The “All Members” tab is for any Portal user to
test logging into the Portal using the Two- Factor Authentication as well as testing the Portal screens.
- The “LSA Administration” tab is for the LSAs to
test the administrative functions associated with Two-Factor Authentication as well as regression testing existing Local Security Administrative functions.
- Members only need to test using the UI.
7
Test Checklist Cont.
- Both tabs consist of 2 sections
- The Two Factor Authorization section of
each tab is required to be tested
- The other section of each tab is optional
- The chart below specifies which sections
are required or optional as well as listing reference material that will assist in completing the specific tests
8
All Member Tests
- All Members companies are to test using
Two-Factor Authentication to access the Marketplace Portal with a valid certificate in conjunction with a Login ID and Password typed into a login screen. Members will also test changing a password and initiating a password reset for a forgotten password.
- Testing will also serve the purpose of
familiarizing the members with the new look, feel and features of the Marketplace Portal prior to using it in Production.
9
All Member Tests Cont.
10
LSA Administration Tests
- All changes to the Local Security
Administration Manage User page that were added through the Two-Factor Authentication project.
- Familiarizing the LSAs with the new look,
feel and features of the Marketplace Portal Local Security Administration screens prior to using them in Production.
11
LSA Administration Tests Cont.
12
LSA Administration Tests Cont.
During parallel operations, a few options in Manage Users are disabled in the new portal (but can still be performed in the Liferay Portal):
- Delete User – If this is chosen, the user gets
a pop up notification explaining that the function is disabled, and it gives them the
- ption to be taken to Liferay to complete the
deletion.
- Edit Email Address – The email text box is
disabled on Edit. Both of these are because having the options enabled during parallel operations was causing data synchronization issues between the two
- portals. Once the Liferay portal is retired, both
- f these functions will be re-enabled in the new
portal.
13
Test Environment
- All member testing will occur in the Member
Testing Environment (MTE).
- SPP supports the latest version of the following
web browsers:
Internet Explorer (10, 11 and MS Edge) Chrome Firefox Safari
- Members using older versions of browsers
may not be able to view all Marketplace Portal content.
- During member testing, MTE will be
supported by SPP during business hours only - Monday thru Friday 8:00 am to 5:00 pm CDT; MPs are welcome to test outside of these times and any issues identified should be logged via RMS.
14
Expectations
- Testing should be performed by individuals
who are familiar with usage of the Marketplace Portal as it currently exists and have a valid client certificate.
- Project Liaisons will be responsible for
coordinating testing at their company, and reporting back to SPP on testing progress or issues.
- Complete both the “ALL Members” and “LSA
Administration” tabs on the Member Test Checklist
- Turning in your completed test checklist as
early as possible is appreciated but no later than June 26 via RMS
- Ask questions or report issues via RMS
15
RMS
- Members can ask questions or submit
completed checklists by completing an RMS ticket using RMS link: https://spprms.issuetrak.com/login.asp
- Inquiries can be submitted through RMS using
the “Project Inquiries” quick pick and the ‘Marketplace Portal Redesign’ Subtype.
16
- If a new user ID is needed for RMS, click on
that link and follow the directions for “Register Now”.
Reference Materials
- Portal User Job Aid - to assist members
with logging into the Portal for the first time (Available in LMS)
- LSA User Guide – To assist LSAs in
executing all Local Security Administration Tasks (Available on the LSA Documentation screen in the MTE Marketplace Portal)
- Portal LSA Job Aid – To assist LSAs in
executing all Local Security Administration Tasks (Available on the LSA Documentation screen in the MTE Marketplace Portal)
17
Reference Materials Cont.
- Marketplace Portal Member Test Approach
- Marketplace Portal Member Test Checklist
- Marketplace Portal Redesign MIPO
- Two-Factor Authentication MIPO
- Two-Factor Authentication Technical
Specification
18
Project Timeline
- May 29: Start of Member Testing in MTE
- June 2: 1st Testing Checkpoint Meeting
- June 16: 2nd Testing Checkpoint Meeting
- June 26: Test Period Ends; All Test Checklists Due
to SPP
- July 25: Go Live in Production
- July 25 - August 22: New and old versions of
Marketplace Portal available in Production to mitigate Two-Factor Authentication setup issues
- August 22: Old Version is retired and no longer
accessible
19
Parting Comment
- All members, even those not assigned to
test, are welcome and encouraged to log in to MTE and get familiar with the new Portal at any time after the start of member testing on Monday, May 29. Members needing access to SPP’s MTE environment will need to go through their LSA.
20
Questions
21