1
play

1 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES - PowerPoint PPT Presentation

Project Team Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Facade Redesign Faade Redesign Faade Redesign Floor System Redesign Floor System Redesign Floor System


  1. Thermal Loads Intro Intro Intro Existing HVAC Envelope Loads: Building Background Building Background Building Background o Peak cooling: 58% Existing Façade Double-Skin Façade o Peak heating: 75% Proposal Proposal Proposal U-Value 0.625 0.50 Double-Skin Façade Thermal Efficiency: Shading Coefficient 0.750 0.38 Facade Redesign Façade Redesign Facade Redesign o Decreased U-value o Decreased Shading Coefficient Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 12 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  2. Thermal Loads Intro Intro Intro Existing HVAC Envelope Loads: Building Background Building Background Building Background o Peak cooling: 58% o Peak heating: 75% Proposal Proposal Proposal Double-Skin Façade Thermal Efficiency: Façade Redesign Facade Redesign Facade Redesign o Decreased U-value o Decreased Shading Coefficient Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign Savings: CoGen Redesign CoGen Redesign CoGen Redesign o Energy (21%) BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 13 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  3. Thermal Loads Intro Intro Intro Existing HVAC Envelope Loads: Building Background Building Background Building Background o Peak cooling: 58% o Peak heating: 75% Proposal Proposal Proposal Double-Skin Façade Thermal Efficiency: Facade Redesign Facade Redesign Façade Redesign o Decreased U-value o Decreased Shading Coefficient Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign Savings: CoGen Redesign CoGen Redesign CoGen Redesign o Energy (21%) o Cost ($800,000 / year) BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 14 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  4. Thermal Loads Intro Intro Intro Existing HVAC Envelope Loads: Building Background Building Background Building Background o Peak cooling: 58% o Peak heating: 75% Proposal Proposal Proposal Double-Skin Façade Thermal Efficiency: Façade Redesign Facade Redesign Facade Redesign o Decreased U-value o Decreased Shading Coefficient Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign Savings: CoGen Redesign CoGen Redesign CoGen Redesign o Energy (21%) o Cost ($800,000 / year) o Emissions (23%) BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 15 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  5. Serviceability and Maintenance Intro Intro Intro 2’ 6” accessible cavity Building Background Building Background Building Background Proposal Proposal Proposal Louvers support walking loads Facade Redesign Facade Redesign Façade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 16 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  6. Cost Comparison: Intro Intro Intro Original Façade System $ 83,527,260 Building Background Building Background Building Background Double-skin façade up front cost: $18.7 million increase Proposal Proposal Proposal Proposed Double Façade $ 102,273,745 Annual energy savings: $800,000 Upfront Cost Increase $ 18,746,485 Facade Redesign Facade Redesign Façade Redesign Annual Energy Savings $ (800,000) Floor System Redesign Floor System Redesign Floor System Redesign Simple payback period : 23.43 years Core Redesign Core Redesign Core Redesign Simple Payback Period 23.43 Years CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 17 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  7. Façade Lighting Redesign Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Facade Redesign Facade Redesign Façade Redesign Floor System Redesign Floor System Redesign Floor System Redesign E Core Redesign Core Redesign Core Redesign S N CoGen Redesign CoGen Redesign CoGen Redesign 400W Floodlight W BIM/IPD BIM/IPD BIM/IPD 250W Floodlight Metrics of Success Metrics of Success Metrics of Success 18 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  8. Façade Lighting Redesign Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Facade Redesign Facade Redesign Façade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 19 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  9. Façade Lighting Redesign Intro Intro Intro Building Background Building Background Building Background 400W Floodlight Proposal Proposal Proposal Façade Redesign Facade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign E Core Redesign Core Redesign Core Redesign S N CoGen Redesign CoGen Redesign CoGen Redesign W BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 20 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  10. Façade Lighting Redesign Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Facade Redesign Facade Redesign Façade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 21 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  11. Façade Lighting Redesign Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Facade Redesign Facade Redesign Façade Redesign Floor System Redesign Floor System Redesign Floor System Redesign E Core Redesign Core Redesign Core Redesign S N CoGen Redesign CoGen Redesign CoGen Redesign 400W Floodlight W BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 22 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  12. Façade Lighting Redesign Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Facade Redesign Facade Redesign Façade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 23 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  13. Floor System Redesign Intro Intro Intro Goals: Building Background Building Background Building Background o Increase rentable floor space o Decrease floor-to-floor height Proposal Proposal Proposal Redesign Opportunities: o HVAC (UFAD/VAV to Chilled Beams) Façade Redesign Facade Redesign Facade Redesign o Structural Floor System (Castellated Beams) Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 24 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  14. Structural Analysis Intro Intro Intro Initial Study Building Background Building Background Building Background o Investigate the required depth for interstitial space Proposal Proposal Proposal Assumptions: o Loading conditions were the same as in the Facade Redesign Facade Redesign Façade Redesign existing building Floor System Redesign Floor System Redesign Floor System Redesign o UFAD System would be removed Core Redesign Core Redesign Core Redesign Result: CoGen Redesign CoGen Redesign CoGen Redesign o 28” Deep Castellated Beam Required BIM/IPD BIM/IPD BIM/IPD Existing 30’ - 0” x 40’ - 0” Perimeter Bay Metrics of Success Metrics of Success Metrics of Success 25 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  15. Structural Analysis Ceiling Plenum: 3’ 10” Raised Floor: 6” Intro Intro Intro Concrete Floor: 5 1/4” Building Background Building Background Building Background Initial Study Castellated Beam: 28” Max Investigate the required depth for interstitial space Proposal Proposal Proposal Clearance: 5” Ceiling to Chilled Beam: 1’ 8” Facade Redesign Façade Redesign Facade Redesign Assumptions: Loading conditions were the same as in the existing building Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign UFAD System would be removed CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 26 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  16. Structural Floor System Redesign Intro Intro Intro Composite Castellated Beams Building Background Building Background Building Background Proposal Proposal Proposal Allow for Coordination within Interstitial space Façade Redesign Facade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 27 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  17. Structural Floor System Redesign Intro Intro Intro Composite Castellated Beams Building Background Building Background Building Background Proposal Proposal Proposal Allow for Coordination within Interstitial space Metal Deck Long Span Metal Deck (LS) Façade Redesign Facade Redesign Facade Redesign Long Span Metal Deck Floor System Redesign Floor System Redesign Floor System Redesign Dovetail Ribbed Composite Metal Deck Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Dovetail Ribbed Composite Metal Deck (DT) Metrics of Success Metrics of Success Metrics of Success 28 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  18. Structural Floor System Redesign Intro Intro Intro Configuration 1: Building Background Building Background Building Background o Maximize Span o Minimize Number of Members Proposal Proposal Proposal Facade Redesign Façade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign Configuration 1: CoGen Redesign CoGen Redesign CoGen Redesign 15’ - 0” Span Typ. BIM/IPD BIM/IPD BIM/IPD (Shoring Required) Metrics of Success Metrics of Success Metrics of Success 29 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  19. Structural Floor System Redesign Intro Intro Intro Configuration 2: Building Background Building Background Building Background o Minimize Shoring Proposal Proposal Proposal Facade Redesign Facade Redesign Façade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign Configuration 2: CoGen Redesign CoGen Redesign CoGen Redesign 10’ - 0” span Typ. BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 30 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  20. Structural Floor System Redesign Intro Intro Intro Total of 6 Main Option Investigated Building Background Building Background Building Background Proposal Proposal Proposal Typical Gravity Loading o Superimposed Dead Load - 20 psf o Live Load – 50 psf (+ 20 psf partitions) Facade Redesign Façade Redesign Facade Redesign Member Depth Floor System Redesign Floor System Redesign Floor System Redesign o All Met 28” Depth Parameter Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 31 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  21. Structural Floor System Redesign Intro Intro Intro Building Background Building Background Building Background Floor Vibrations Due to Human Activity: Proposal Proposal Proposal o 0.5% g Peak Acceleration (AISC Design Guide 11) Facade Redesign Facade Redesign Façade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 32 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  22. Cost Comparison of Floor Configurations Floor Configurations Conclusions Intro Intro Intro Existing Floor Configuration Building Background Building Background Building Background o Configuration #2 – 10 ft. typical spans Proposal Proposal Proposal System Steel Framing Concrete Floor Reshoring Total o Wide-flange Beams Lightweight Concrete - Config. 1 $ 7,920,000 $ 82,160,000 $ 2,490,000 $ 92,580,000 o Typical Composite Metal Deck Normalweight Concrete - Config. 1 $ 7,920,000 $ 61,950,000 $ 2,490,000 $ 72,370,000 Facade Redesign Façade Redesign Facade Redesign New Floor Configuration Lightweight Concrete - Config. 2 $ 8,540,000 $ 82,160,000 $ - $ 90,700,000 o Castellated Beams Floor System Redesign Floor System Redesign Floor System Redesign Normalweight Concrete - Config. 2 $ 8,540,000 $ 61,950,000 $ - $ 70,490,000 o Configuration #2 – 10 ft. typical spans Core Redesign Core Redesign Core Redesign o Dovetail deck CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 33 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  23. Structural Floor System Redesign Intro Intro Intro Member Check Cantilever & Overhang Building Background Building Background Building Background o Used New Loading Conditions o Verified Existing was Adequate or Resized Appropriately Proposal Proposal Proposal Façade Redesign Facade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 34 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  24. HVAC Redesign Intro Intro Intro Multiservice Chilled Beams: Building Background Building Background Building Background o Integrated design Proposal Proposal Proposal www.Halton.com Façade Redesign Facade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD www.halton.com www.halton.com Metrics of Success Metrics of Success Metrics of Success 35 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  25. HVAC Redesign Intro Intro Intro Multiservice Chilled Beams: Building Background Building Background Building Background o Integrated design Proposal Proposal Proposal Typical Layout: o 155 beams per floor Façade Redesign Facade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 36 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  26. HVAC Redesign Intro Intro Intro Multiservice Chilled Beams: Building Background Building Background Building Background o Integrated design Proposal Proposal Proposal Typical Layout: o 155 beams per floor Façade Redesign Facade Redesign Facade Redesign Savings: Floor System Redesign Floor System Redesign Floor System Redesign o Energy (10-16%) Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 37 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  27. HVAC Redesign Intro Intro Intro Multiservice Chilled Beams: Building Background Building Background Building Background o Integrated design Proposal Proposal Proposal Typical Layout: o 155 beams per floor Facade Redesign Facade Redesign Façade Redesign Savings: Floor System Redesign Floor System Redesign Floor System Redesign o Energy (10-16%) Core Redesign Core Redesign Core Redesign o Cost ($47,000 / month) CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 38 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  28. HVAC Redesign Intro Intro Intro Multiservice Chilled Beams: Building Background Building Background Building Background o Integrated design Proposal Proposal Proposal Typical Layout: o 155 beams per floor Facade Redesign Facade Redesign Façade Redesign Savings: Floor System Redesign Floor System Redesign Floor System Redesign o Energy (10-16%) Core Redesign Core Redesign Core Redesign o Cost ($47,000 / month) CoGen Redesign CoGen Redesign CoGen Redesign o Emissions (8-16%) BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 39 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  29. Office Lighting Redesign Intro Intro Intro Building Background Building Background Building Background Integrated 35W T5 Direct Pendant Proposal Proposal Proposal N Façade Redesign Facade Redesign Facade Redesign 4’ T5HO Direct/Indirect Pendant W E Floor System Redesign Floor System Redesign Floor System Redesign S Core Redesign Core Redesign Core Redesign 4’ Recessed Cove CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 40 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  30. Office Lighting Redesign Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Facade Redesign Facade Redesign Façade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 41 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  31. Office Lighting Redesign Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Facade Redesign Facade Redesign Façade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 42 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  32. Office Lighting Redesign Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Facade Redesign Facade Redesign Façade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 43 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  33. Office Lighting Redesign Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Facade Redesign Facade Redesign Façade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 44 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  34. Cost of Proposed Floor System Intro Intro Intro New Floor System Building Background Building Background Building Background o Cost addition of extra floor Structure $ 2,988,000.00 Proposal Proposal Proposal Raised Floor $ 885,000.00 HVAC Cost $ 3,328,000.00 Facade Redesign Facade Redesign Façade Redesign Plumbing Cost $ 303,000.00 Floor System Redesign Floor System Redesign Floor System Redesign Electrical Cost $ 2,915,000.00 Core Redesign Core Redesign Core Redesign Communications $ 1,027,000.00 CoGen Redesign CoGen Redesign CoGen Redesign Interiors $ 607,000.00 Furnishing $ 215,000.00 BIM/IPD BIM/IPD BIM/IPD $ 12,268,000.00 Metrics of Success Metrics of Success Metrics of Success 45 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  35. Cost of Proposed Floor System Intro Intro Intro Building Background Building Background Building Background o Cost addition of extra floor o Additional SF of leasable area Proposal Proposal Proposal Facade Redesign Facade Redesign Façade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Additional Rent Annually 21,000 SF $ 60 / SF $ 1.26 million Core Redesign Core Redesign Core Redesign Year Year CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 46 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  36. Cost of Proposed Floor System Intro Intro Intro Building Background Building Background Building Background o Cost addition of extra floor o Additional SF of leasable area Proposal Proposal Proposal o Chilled beam cost savings Façade Redesign Facade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 47 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  37. Cost of Proposed Floor System Intro Intro Intro Building Background Building Background Building Background o Cost addition of extra floor o Additional SF of leasable area Proposal Proposal Proposal o Chilled beam cost savings Additional System Cost $ 12,268,000 o Overall cost comparison Facade Redesign Façade Redesign Facade Redesign Additional Rent $ 1,260,000 Floor System Redesign Floor System Redesign Floor System Redesign Energy Savings $ 565,800 Core Redesign Core Redesign Core Redesign Payback Period 6.72 years CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 48 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  38. Integrated Design Intro Intro Intro Building Background Building Background Building Background o Constructability o BIM Use Analysis Proposal Proposal Proposal o 3D Coordination o Parties Involved o Structural Facade Redesign Facade Redesign Façade Redesign o Mechanical Floor System Redesign Floor System Redesign Floor System Redesign o Lighting / Electrical Core Redesign Core Redesign Core Redesign o Construction Management o Outcome CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 49 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  39. Core Redesign Intro Intro Intro Goals: Building Background Building Background Building Background o Increase rentable floor space o Explore trade issues (Concrete vs. Steel Core) Proposal Proposal Proposal o Explore cost for core redesign Redesign Opportunities: Facade Redesign Facade Redesign Façade Redesign o Reconfigure core layout structurally and architecturally o Decrease footprint of the structural core Floor System Redesign Floor System Redesign Floor System Redesign o Service Spaces Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 50 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  40. Core Configuration Intro Intro Intro Building Background Building Background Building Background Maintain structural symmetry o Reduces torsional effects due to lateral loads Proposal Proposal Proposal o Center of geometry converges with center of Facade Redesign Façade Redesign Facade Redesign pressure, center of mass, and center of rigidity Floor System Redesign Floor System Redesign Floor System Redesign CG Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 51 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  41. Core Configuration Example: Floors 46 - 50 New Configuration Maintain flexibility of space Intro Intro Intro Building Background Building Background Building Background Existing Configuration Proposal Proposal Proposal Façade Redesign Facade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 52 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  42. Elevator Configuration Feasibility Study: Elevator Reduction Existing Configuration Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Facade Redesign Facade Redesign Façade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign 26 Passenger Elev. 22 Passenger Elev. BIM/IPD BIM/IPD BIM/IPD 2 Service Elev. 2 Service Elev. Metrics of Success Metrics of Success Metrics of Success 53 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  43. Core Configuration Final Configuration Existing Configuration Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Façade Redesign Facade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign 26 Passenger Elev. BIM/IPD BIM/IPD BIM/IPD 26 Passenger Elev. 2 Service Elev. Metrics of Success Metrics of Success Metrics of Success 2 Service Elev. 54 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  44. Architectural Configuration Existing Core Configuration New Core Configuration Intro Intro Intro Floor Occupant Existing Leasable Area New Leasable Area (SF) Difference (SF) (SF) 50 FCRC 21,943 22,126 183 49 FCRC 21,943 22,126 183 Building Background Building Background Building Background 48 FCRC 21,943 22,126 183 47 FCRC 21,943 22,126 183 46 FCRC 21,943 22,126 183 45 FCRC 21,943 22,126 183 Proposal Proposal Proposal 44 FCRC 21,650 22,126 476 43 FCRC 21,650 22,126 476 42 FCRC 21,650 22,126 476 41 FCRC 21,650 22,126 476 40 FCRC 21,244 21,456 212 39 FCRC 21,244 21,456 212 38 FCRC 21,244 21,456 212 37 FCRC 21,244 21,456 212 Facade Redesign Façade Redesign Facade Redesign 36 FCRC 21,244 21,456 212 40 ft 35 FCRC 21,244 21,456 212 34 FCRC 21,244 21,456 212 48 ft Floor System Redesign Floor System Redesign Floor System Redesign 33 FCRC 21,244 21,456 212 32 FCRC 21,244 21,456 212 44 ft 31 FCRC 21,244 21,456 212 44 ft 48 ft 30 FCRC 21,244 21,456 212 Core Redesign Core Redesign Core Redesign 29 FCRC 20,429 20,959 530 472,371SF 478,235 SF 5,864 SF CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 55 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  45. Core Configuration Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal 32 ft New Lobby Rendering 47 ft 36 ft 43 ft Facade Redesign Façade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Existing Lobby Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 56 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  46. Service Space Configuration Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Service Elevators Facade Redesign Façade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign 70 SF Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign 11 ft BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 57 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  47. Service Space Configuration Bus Duct Vs Conduit Analysis Intro Intro Intro Bus Duct Vs Conduit Analysis Total Cost System Building Background Building Background Building Background Existing Conditions in NYT Portion Bus Duct: $1.75 million 18 3 1/2” Conduit Feeders Proposal Proposal Proposal Powers Lighting and Appliance Panels Conduit: $1.2 million 6 3 1/2” Conduit Feeders Facade Redesign Façade Redesign Facade Redesign Powers Mechanical Equipment Panels Space Comparison Floor System Redesign Floor System Redesign Floor System Redesign Minimal difference between required space Proposed Redesign Core Redesign Core Redesign Core Redesign 2 2500 Amp Aluminum Bus Duct Feeders CoGen Redesign CoGen Redesign CoGen Redesign Benefit of Bus Duct Feeders Powers Lighting and Appliance Panels Possibility of Expansion Without Adding Additional Feeders Steel-technology.com Steel-technology.com 1 1600 Amp Aluminum Bus Duct Feeder BIM/IPD BIM/IPD BIM/IPD Powers Mechanical Equipment Panels Metrics of Success Metrics of Success Metrics of Success 58 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  48. Lateral Force Resisting System Intro Intro Intro Concrete Shear Wall Core w/ Outriggers on the 28 th Mechanical Floor Building Background Building Background Building Background Proposal Proposal Proposal Facade Redesign Façade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 59 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  49. Lateral Force Resisting System Intro Intro Intro Initial Design Parameters Building Background Building Background Building Background Assumed Serviceability Governed Design Proposal Proposal Proposal SRSS – Period of Vibration o 10% of 10.8s (Existing Design) Serviceability Limit States Under Wind Load - Façade Redesign Facade Redesign Facade Redesign Lawrence G. Griffis (AISC 1993) Floor System Redesign Floor System Redesign Floor System Redesign Lateral Drift & Deflection Core Redesign Core Redesign Core Redesign o Wind - H/450 = 19.88” (Existing Design) CoGen Redesign CoGen Redesign CoGen Redesign D+0.5L+0.7W (ASCE 7-05, CC.1.2) o Seismic – 0.015h sx 1.0 E BIM/IPD BIM/IPD BIM/IPD Design checked for Strength Metrics of Success Metrics of Success Metrics of Success 60 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  50. Lateral Force Resisting System Roof Intro Intro Intro Building Background Building Background Building Background – Level 53 Concrete Compressive Strength Level 40 – 8 ksi Proposal Proposal Proposal – 10 ksi Level 30 Shear Wall Thickness Facade Redesign Façade Redesign Facade Redesign – 20” Floor System Redesign Floor System Redesign Floor System Redesign – Level 30 – 24” Core Redesign Core Redesign Core Redesign – 30” CoGen Redesign CoGen Redesign CoGen Redesign Coupling Beams o 36” Depth o Width Dependent upon Support BIM/IPD BIM/IPD BIM/IPD Base Metrics of Success Metrics of Success Metrics of Success East/West North/South 61 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  51. N Lateral Force Resisting System W E Intro Intro Intro Shear Wall Design: Lobby Level S Building Background Building Background Building Background Proposal Proposal Proposal Façade Redesign Facade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 62 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  52. N Lateral Force Resisting System W E Intro Intro Intro Shear Wall Design: Level 2 – Level 28 S Building Background Building Background Building Background Proposal Proposal Proposal Façade Redesign Facade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 63 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  53. N Lateral Force Resisting System W E Intro Intro Intro Shear Wall Design: Level 29 – Roof S Building Background Building Background Building Background Proposal Proposal Proposal Façade Redesign Facade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 64 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  54. Lateral Force Resisting System Intro Intro Intro Outrigger Design: 28 th Mechanical Floor Building Background Building Background Building Background Proposal Proposal Proposal Facade Redesign Façade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 65 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  55. Lateral Force Resisting System Intro Intro Intro Outrigger Design: 28 th Mechanical Floor Building Background Building Background Building Background Proposal Proposal Proposal Facade Redesign Façade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 66 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  56. Lateral Force Resisting System Intro Intro Intro Outrigger Design: 28 th Mechanical Floor Building Background Building Background Building Background Proposal Proposal Proposal Facade Redesign Façade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 67 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  57. Lateral Force Resisting System Lateral Drift & Deflection Intro Intro Intro Serviceability Governed Design Serviceability Governed Design – Assumption Confirmed o Wind - H/450 = 19.88” (Existing Design) Building Background Building Background Building Background o Seismic – 0.015h sx SRSS – Period of Vibration Proposal Proposal Proposal o 10% of 10.8s (Existing Design) Facade Redesign Façade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Strength Check – Members Adequate Strength Check Metrics of Success Metrics of Success Metrics of Success 68 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  58. Cost and Schedule Changes Intro Intro Intro Item Quantity Cost Building Background Building Background Building Background Cost of concrete core vs. existing steel core Steel Core $ (37,171,395) Proposal Proposal Proposal Concrete Core 21,500 CY $ 18,676,730 General conditions changes Crane Addition 2.5 Month $ 81,700 o Superstructure schedule o GC cost changes Temporary Heating 2 Winters $ 4,000,000 Facade Redesign Façade Redesign Facade Redesign o Constructability Upfront Savings $ (14,412,965) Floor System Redesign Floor System Redesign Floor System Redesign *Additional Rent 5,864 SF $ 351,840 per year Core Redesign Core Redesign Core Redesign Overall Cost Analysis Annually CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 69 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  59. Cost and Schedule Changes 07/29/05 05/16/05 07/25/05 02/07/05 01/13/06 10/21/05 09/09/05 04/24/06 03/10/05 06/13/05 04/13/05 05/02/05 11/17/04 12/27/04 02/21/06 05/20/05 12/02/05 08/09/05 09/26/05 02/03/06 02/09/06 03/21/05 12/08/05 10/05/05 07/04/05 11/02/05 12/07/05 03/18/05 Intro Intro Intro Building Background Building Background Building Background Cost of concrete core vs. existing steel core Proposal Proposal Proposal General conditions changes o Superstructure schedule o GC cost changes Facade Redesign Facade Redesign Façade Redesign Steel Erection o Constructability Floor System Redesign Floor System Redesign Floor System Redesign Concrete Erection Core Redesign Core Redesign Core Redesign Overall Cost Analysis CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success Existing Steel Core Proposed Concrete Core 70 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  60. Cost and Schedule Changes Intro Intro Intro Item Quantity Cost Building Background Building Background Building Background Cost of concrete core vs. existing steel core Steel Core $ (37,171,395) Proposal Proposal Proposal Concrete Core 21,500 CY $ 18,676,730 General conditions changes Crane Addition 2.5 Month $ 81,700 o Superstructure schedule o GC cost changes Temporary Heating 2 Winters $ 4,000,000 Facade Redesign Façade Redesign Facade Redesign o Constructability Upfront Savings $ (14,412,965) Floor System Redesign Floor System Redesign Floor System Redesign *Additional Rent 5,8464 SF $ 351,840 per year Core Redesign Core Redesign Core Redesign Overall Cost Analysis Annually CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 71 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  61. Cost and Schedule Changes Intro Intro Intro Item Quantity Cost Building Background Building Background Building Background Cost of concrete core vs. existing steel core Steel Core $ (37,171,395) Proposal Proposal Proposal Concrete Core 21,500 CY $ 18,676,730 General conditions changes Crane Addition 2.5 Month $ 81,700 o Superstructure schedule o GC cost changes Temporary Heating 2 Winters $ 4,000,000 Facade Redesign Façade Redesign Facade Redesign o Constructability Upfront Savings $ (14,412,965) Floor System Redesign Floor System Redesign Floor System Redesign *Additional Rent 5,8464 SF $ 351,840 per year Core Redesign Core Redesign Core Redesign Overall Cost Analysis Annually CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 72 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  62. Lobby Lighting Redesign N Intro Intro Intro Building Background Building Background Building Background 9” Recessed Downlight Proposal Proposal Proposal Facade Redesign Facade Redesign Façade Redesign 8” Recessed Directional Downlight W E Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign 4’ Recessed Cove BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success S 73 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  63. Lobby Lighting Redesign N Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Façade Redesign Facade Redesign Facade Redesign W E Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success S 74 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  64. Lobby Lighting Redesign N Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Façade Redesign Facade Redesign Facade Redesign W E Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success S 75 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  65. Lobby Lighting Redesign N Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Façade Redesign Facade Redesign Facade Redesign W E Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success S 76 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  66. Lobby Lighting Redesign N Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Façade Redesign Facade Redesign Facade Redesign W E Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success S 77 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  67. Lobby Lighting Redesign Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Facade Redesign Facade Redesign Façade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 78 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  68. Existing System / Goals Intro Intro Intro Existing System: Building Background Building Background Building Background o 1.4 MW Internal Combustion Proposal Proposal Proposal o 40% power capacity for NYT o 250 ton absorption chiller Facade Redesign Façade Redesign Facade Redesign Redesign Goals: Floor System Redesign Floor System Redesign Floor System Redesign o 100% power capacity for NYT Core Redesign Core Redesign Core Redesign o Increased energy cost savings o Decreased energy associated emissions CoGen Redesign CoGen Redesign CoGen Redesign o All met! BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 79 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  69. Redesign Considerations Space Constraints (3000 ft 2 total) Intro Intro Intro Utility Data / Spark Gap Building Background Building Background Building Background Utility Yearly $/Unit Reference Proposal Proposal Proposal Natural Gas $1.392/Ccf New York State Public Service Commission Electric $0.249/kWh New York State Public Service Commission Steam $18.36/Mlb Consolodated Edison Water $2.31/per(748gals) New York City Water Board Facade Redesign Facade Redesign Façade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Spark Gap Fuel Cost / (MMbtu) Core Redesign Core Redesign Core Redesign Natural Gas $ 11.27 Electricity $ 72.97 CoGen Redesign CoGen Redesign CoGen Redesign Steam $ 15.40 Gap $ 61.70 BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 80 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  70. Redesign Consideration Intro Intro Intro Redesign Considerations: Building Background Building Background Building Background o Building thermal and electrical loads Proposal Proposal Proposal Façade Redesign Facade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 81 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  71. Redesign Alternatives Intro Intro Intro Prime Movers Building Background Building Background Building Background Gas Turbines Proposal Proposal Proposal Façade Redesign Facade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign IC Engines CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 82 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  72. Redesign Alternatives Intro Intro Intro Prime Movers Existing System: 1,400 kW Building Background Building Background Building Background Proposal Proposal Proposal Existing ) 2 - 700 kW Facade Redesign Façade Redesign Facade Redesign - Floor System Redesign Floor System Redesign Floor System Redesign Caterpillar, G3516 LE Ca Core Redesign Core Redesign Core Redesign Natural Gas CoGen Redesign CoGen Redesign CoGen Redesign 1,600 35,340 IC Engines BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 83 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  73. Redesign Alternatives Intro Intro Intro Prime Movers Alternative 1: 4,200 kW Building Background Building Background Building Background Proposal Proposal Proposal Alternative 1 6 - 700 kW Façade Redesign Facade Redesign Facade Redesign - Floor System Redesign Floor System Redesign Floor System Redesign LE Caterpillar, G3516 LE Core Redesign Core Redesign Core Redesign Natural Gas CoGen Redesign CoGen Redesign CoGen Redesign 4,800 106,020 IC Engines BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 84 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  74. Redesign Alternatives Intro Intro Intro Prime Movers Alternative 2: 2,700 kW Building Background Building Background Building Background Proposal Proposal Proposal Alternative 2 2 - 700 kW Facade Redesign Façade Redesign Facade Redesign 1 - 1300kW + - Floor System Redesign Floor System Redesign Floor System Redesign LE Caterpillar, G3516 LE Caterpillar, DM5496 Core Redesign Core Redesign Core Redesign Natural Gas CoGen Redesign CoGen Redesign CoGen Redesign 2,970 63,720 IC Engines 1,300 kW IC Engine BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 85 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  75. Redesign Alternatives Intro Intro Intro Prime Movers Alternative 3: 2,700 kW Building Background Building Background Building Background Proposal Proposal Proposal Alternative 3 2 - 700 kW Facade Redesign Façade Redesign Facade Redesign + 1 - 1300kW Floor System Redesign Floor System Redesign Floor System Redesign E Caterpillar, G3516 LE 6 Solar, Saturn 20 Core Redesign Core Redesign Core Redesign Natural Gas CoGen Redesign CoGen Redesign CoGen Redesign 2,735 50,340 IC Engines 1,300 kW Gas Turbine BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 86 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  76. Redesign Alternatives Intro Intro Intro Building Background Building Background Building Background IC Engine: Cooling Load Potential Gas Turbine: Excess Thermal Proposal Proposal Proposal Façade Redesign Facade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 87 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  77. Redesign Alternatives Intro Intro Intro Energy / Emissions Building Background Building Background Building Background Proposal Proposal Proposal CHP System Existing Alternative 1 Alternative 2 Alternative 3 Energy / Emissions Max Power Output 1,400 4,200 2,700 2,700 (kW) Façade Redesign Facade Redesign Facade Redesign Yearly Power Output 7,030,255 12,101,254 22,731,012 18,388,809 (kWh) 11,358,554 Floor System Redesign Floor System Redesign Floor System Redesign Max Thermal Rejection 9,340 28,020 15,240 18,940 (Mbh) Usable Heat Rejection Core Redesign Core Redesign Core Redesign 66,509,219 80,267,534 73,141,027 81,940,305 (Mbh/year) Fuel Consumption 12.49 12.49 12.11 13.35 CoGen Redesign CoGen Redesign CoGen Redesign (scf/kWh) Max Fuel Consumption 17,485 52,455 32,692 36,045 (scf/hr) Emissions Reduction 16,215,680 30,459,556 24,641,004 10,442,812 (lbs CO 2 e/year) BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 88 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  78. Redesign Alternatives Intro Intro Intro Energy Costs Total Energy Costs: $13.5 million for SHP Building Background Building Background Building Background Proposal Proposal Proposal CHP System Existing Alternative 1 Alternative 2 Alternative 3 Costs Installed Costs $5,600,000 $16,800,000 $10,800,000 $12,100,000 Façade Redesign Facade Redesign Facade Redesign ($) Maintenance Costs $0.005 $0.005 $0.005 $0.005 ($/kWh) $0.015 Floor System Redesign Floor System Redesign Floor System Redesign Maintenance Costs $60,506 $113,655 $91,944 $205,530 ($/year) Core Redesign Core Redesign Core Redesign Building Energy Costs $11,310,248 $9,766,130 $10,443,122 $10,649,749 ($/year) CoGen Redesign CoGen Redesign CoGen Redesign Total Energy Cost Savings $2,272,786 $3,816,905 $3,139,912 $2,933,285 ($/year) Payback Period 0.00 7.83 6.71 14.29 (years) BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 89 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  79. Redesign Alternatives Intro Intro Intro Simple Payback Period Building Background Building Background Building Background Proposal Proposal Proposal CHP System Existing Alternative 1 Alternative 2 Alternative 3 Costs Installed Costs $5,600,000 $16,800,000 $10,800,000 $12,100,000 Facade Redesign Façade Redesign Facade Redesign ($) Maintenance Costs $0.005 $0.005 $0.005 $0.005 ($/kWh) $0.015 Floor System Redesign Floor System Redesign Floor System Redesign Maintenance Costs $60,506 $113,655 $91,944 $205,530 ($/year) Core Redesign Core Redesign Core Redesign Building Energy Costs $11,310,248 $9,766,130 $10,443,122 $10,649,749 ($/year) CoGen Redesign CoGen Redesign CoGen Redesign Total Energy Cost Savings $2,272,786 $3,816,905 $3,139,912 $2,933,285 ($/year) Payback Period 0.00 7.83 6.71 14.29 (years) BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 90 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  80. Redesign Alternatives Intro Intro Intro Alternative 2: 2,700 kW Building Background Building Background Building Background Summary Proposal Proposal Proposal Overall Comparison Existing Alternative 1 Alternative 2 Alternative 3 Energy Cost Facade Redesign Façade Redesign Facade Redesign + Floor System Redesign Floor System Redesign Floor System Redesign Source Energy Emissions Core Redesign Core Redesign Core Redesign Payback Period CoGen Redesign CoGen Redesign CoGen Redesign System Footprint IC Engines 1,300 kW IC Engine BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 91 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  81. Redesign Alternatives Intro Intro Intro Alternative 2: $10 million in savings over 20 years Building Background Building Background Building Background Summary Proposal Proposal Proposal Overall Comparison Existing Alternative 1 Alternative 2 Alternative 3 Energy Cost Façade Redesign Facade Redesign Facade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Source Energy Emissions Core Redesign Core Redesign Core Redesign Payback Period CoGen Redesign CoGen Redesign CoGen Redesign System Footprint BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 92 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  82. Integrated Project Delivery Process Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Facade Redesign Facade Redesign Façade Redesign Floor System Redesign Floor System Redesign Floor System Redesign Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 93 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  83. BIM Goals Intro Intro Intro Building Information Modeling Process: Building Background Building Background Building Background BIM Goals Proposal Proposal Proposal Group Goals: o Enhance communication and information flow Façade Redesign Facade Redesign Facade Redesign o Visualize project changes Floor System Redesign Floor System Redesign Floor System Redesign BIM Use Analysis Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign Workflows BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 94 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  84. BIM Goals Intro Intro Intro Building Information Modeling Process: Building Background Building Background Building Background BIM Goals Proposal Proposal Proposal Group Goals: o Enhance communication and information flow Facade Redesign Facade Redesign Façade Redesign o Visualize project changes Floor System Redesign Floor System Redesign Floor System Redesign BIM Use Analysis Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign Workflows BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 95 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  85. BIM Use Analysis Intro Intro Intro Building Information Modeling Process: BIM Uses Analysis Building Background Building Background Building Background BIM Goals Design Authoring Proposal Proposal Proposal Group Goals: Design Review o Enhance communication and information flow Facade Redesign Façade Redesign Facade Redesign 3D Coordination o Visualize project changes Floor System Redesign Floor System Redesign Floor System Redesign Phase Planning BIM Use Analysis Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign Workflows BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 96 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  86. BIM Workflows Intro Intro Intro Building Information Modeling Process: Building Background Building Background Building Background BIM Goals Proposal Proposal Proposal Group Goals: o Enhance communication and information flow Facade Redesign Facade Redesign Façade Redesign o Visualize project changes Floor System Redesign Floor System Redesign Floor System Redesign BIM Use Analysis Core Redesign Core Redesign Core Redesign CoGen Redesign CoGen Redesign CoGen Redesign Workflows BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success 97 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  87. Metrics of Success Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Increased Profitability • Operating Costs • Leasable Space Facade Redesign Facade Redesign Façade Redesign $ Increased Marketability Floor System Redesign Floor System Redesign Floor System Redesign • Sustainability Core Redesign Core Redesign Core Redesign • Iconic Image CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success www.international-pc.com/ 98 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  88. Metrics of Success Additional Square Footage 26,864 SF Intro Intro Intro Additional Rent $ 1,601,840 Building Background Building Background Building Background Proposal Proposal Proposal Increased Profitability • Operating Costs • Leasable Space Facade Redesign Facade Redesign Façade Redesign Increased Marketability Floor System Redesign Floor System Redesign Floor System Redesign • Sustainability Core Redesign Core Redesign Core Redesign • Iconic Image CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD Metrics of Success Metrics of Success Metrics of Success www.international-pc.com/ 99 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

  89. Metrics of Success Intro Intro Intro Building Background Building Background Building Background Proposal Proposal Proposal Increased Profitability • Operating Costs • Leasable Space Facade Redesign Façade Redesign Facade Redesign Increased Marketability Floor System Redesign Floor System Redesign Floor System Redesign • Sustainability Core Redesign Core Redesign Core Redesign • Iconic Image CoGen Redesign CoGen Redesign CoGen Redesign BIM/IPD BIM/IPD BIM/IPD 10 Million lbs CO 2 e 35% Energy Reduction Metrics of Success Metrics of Success Metrics of Success www.international-pc.com/ 100 BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend