COTTINGHAM STADIUM REDESIGN PRESENTATION 11/6/19 COTTINGHAM STADIUM Redesign Presentation | November 6, 2019 COTTINGHAM STADIUM REDESIGN PRESENTATION 11/6/19 DESIGN CONCEPT 1 The design concept for Cottingham Stadium is built around Easton


  1. COTTINGHAM STADIUM REDESIGN PRESENTATION 11/6/19 COTTINGHAM STADIUM Redesign Presentation | November 6, 2019

  2. COTTINGHAM STADIUM REDESIGN PRESENTATION 11/6/19 DESIGN CONCEPT 1 The design concept for Cottingham Stadium is built around Easton Area High School’s alma mater. The space is community-focused and a celebration of great traditions of the district, the city and the surrounding community.

  3. COTTINGHAM STADIUM REDESIGN PRESENTATION 11/6/19 REDESIGN GOALS 2 The redesign has three goals: lower the costs of construction, increase the return on investment and optimize the variety of uses. Spaces throughout Cottingham Stadium have been redesigned in order to achieve an estimated savings of $3.1 million to $3.6 million. The investment return is increased by the flexibility of spaces allowing for a variety of athletes and community members to use the improved venue.

  4. COTTINGHAM STADIUM REDESIGN PRESENTATION 11/6/19 COTTINGHAM STADIUM SITE PLAN 3 Major areas impacted by the redesign are the home and visitors stands, entrance gate, 12th Street, locker rooms and general site work. The following slides break down each area with an explanation of the redesign and an estimated cost savings.

  5. UPDATED 10/22/19 COTTINGHAM STADIUM PRELIMINARY ESTIMATED SAVINGS Item Description Low Range High Range Alternate ? 1 Provide aluminum bleachers with pre ‐ fabricated pressbox instead of precast concrete $ 1,200,000 $ 1,300,000 Yes, concrete (add) 2 12th Street (existing eastern sidewalks/curb remain, no "bump out", mill asphalt instead of replace) $ 100,000 $ 130,000 No 3 Eliminate curb widening on 12th Street for Paxinosa drop off $ 60,000 $ 70,000 No 4 Combine 12th Street ticket booths & arch into common smaller structure $ 100,000 $ 150,000 No 5 Delete custom press box and vomitorium wall at Home bleachers $ 400,000 $ 450,000 No 6 Delete the construction of 3 new concession stands $ 600,000 $ 690,000 No 7 Eliminate wall closure from 12 ft. height to underside of bleachers $ 70,000 $ 80,000 No 8 Delete custom canopy over Visitor press platform $ 110,000 $ 130,000 No 9 Remove resilient and polished concrete floors and provide sealer $ 40,000 $ 50,000 No 10 Reduce air conditioning equipment in Field House (keep 10 mini split AC units) $ 320,000 $ 350,000 No 11 Simplify screen walls for exterior mechanical enclosure at field house $ 30,000 $ 40,000 No 12 Reduce public restroom plumbing fixtures by 50% $ 115,000 $ 140,000 No (See Note 1) 13 Remove hard ceilings from toilet rooms $ 30,000 $ 40,000 No 14 Reduce signage scope including bronze letters in sidewalk and other signage/lettering $ 40,000 $ 50,000 No 15 Reduce Locker Scope in field house $ 50,000 $ 60,000 No 16 Reduce Electric Scope for Underground extension to outbuildings (overhead services to remain) $ 60,000 $ 75,000 No 17 Reduce hard wired data connections, utilize wifi $ 30,000 $ 35,000 No 18 Eliminate additional TV station cabling infrastructure for remote parking location $ 40,000 $ 50,000 No 19 Basic score board in lieu of LED video board $ 75,000 $ 100,000 TBD 20 Reduce concrete slab scope to stone in storage rooms under bleachers $ 25,000 $ 35,000 No (See Note 1) 21 Reduction in new retaining wall scope (includes prior VE item to remove brick veneer) $ 200,000 $ 250,000 No 22 Reduce scope of HVAC for public restrooms beneath bleachers $ 50,000 $ 60,000 No (See Note 1) 23 Install chain Link Fence in lieu of CMU walls @ storage areas $ 160,000 $ 190,000 No (See Note 1) 24 Delete Ticket/Booster Building on 11th Street $ 80,000 $ 100,000 No Estimated Total Savings $ 3,985,000 $ 4,625,000 Estimated Alternate for Synthetic Turf field $ 850,000 $ 1,000,000 Item numbers Estimated Net Savings $ 3,135,000 $ 3,625,000 referenced Notes throughout Assumption made that fixture variance will be approved. Costs based in whole or in part on smaller toilet room, larger storage room 1 presentation. Hard Cost Bid Results $ 17,346,742 $ 17,346,742 Adjusted Hard Cost Incorporating Estimated Savings (Natural Grass Field) $ 13,436,742 $ 12,821,742 Adjusted Hard Cost Incorporating Estimated Savings (Synthetic Turf Field) $ 14,286,742 $ 13,821,742 Home & Visitor Stands Soft Costs on Bid Day (Including $500,000 project contingency) $ 2,667,940 $ 2,667,940 Entrance Gate Adjusted Soft Costs to Delete Utility Relocation ($70,000) and Provide Basic Scoreboard (Item 19 above) $ 2,522,940 $ 2,497,940 12th Street Improvements Bid Day Total Project Cost $ 20,014,682 $ 20,014,682 Locker Rooms Adjusted Total Project Cost (Natural Grass Field) $ 15,959,682 $ 15,319,682 Other Site Work Adjusted Total Project Cost (Synthetic Turf Field) $ 16,809,682 $ 16,319,682

  6. COTTINGHAM STADIUM REDESIGN PRESENTATION 11/6/19 HOME & VISITOR STANDS Item Low Range High Range 4 1 $1,200,000 $1,300,000 Aluminum bleachers and a pre-fabricated press 5 $400,000 $450,000 box are replacing the custom press box and 7 $70,000 $80,000 vomitorium wall. The custom canopy over the 8 $110,000 $130,000 visitor press platform is also removed. The 20 $25,000 $35,000 storage areas beneath the bleachers have gravel 23 $160,000 $190,000 floors and chain link fencing. Total $2 million $2.2 million

  7. COTTINGHAM STADIUM REDESIGN PRESENTATION 11/6/19 HOME STANDS Item Low Range High Range 5 12 $115,000 $140,000 With a variance, the public restroom fixtures will 13 $30,000 $40,000 be reduced by 50 percent and the hard ceiling is 22 $50,000 $60,000 removed. HVAC in public restrooms is reduced. Total $195,000 $240,000

  8. COTTINGHAM STADIUM REDESIGN PRESENTATION 11/6/19 VISITOR STANDS 6 With a variance, the public restroom fixtures will be reduced by 50 percent and the hard ceiling is removed. HVAC in public restrooms is reduced.

  9. COTTINGHAM STADIUM REDESIGN PRESENTATION 11/6/19 HOME STANDS RENDERING 7 As a cost-saving measure in the redesign, several customized pieces are replaced by pre-fabricated buildings, as is the case in this rendering. The view shown is a pre-fabricated press box on the home stand side.

  10. COTTINGHAM STADIUM REDESIGN PRESENTATION 11/6/19 HOME STANDS RENDERING 8 This rending looks north east toward the home stands from the North 12th Street end of the stadium. Mobile food vendors are shown to the left and the entrance to public bathrooms can be seen beneath the stands just right of center.

  11. COTTINGHAM STADIUM REDESIGN PRESENTATION 11/6/19 HOME STANDS RENDERING 9 The rendering shows the area behind the home stands. To the left is the storage area and bathrooms, and to the right beyond the fence is the parking lot. The storage areas are locked and the surrounding fence is covered in vinyl signage for added privacy.

  12. COTTINGHAM STADIUM REDESIGN PRESENTATION 11/6/19 ENTRANCE GATE Item Low Range High Range 10 4 $100,000 $150,000 The entrance remains near the corner of North 14 $40,000 $50,000 12th and Church streets with no change to 19 $75,000 $100,000 the existing retaining wall. The arch and ticket booths are combined into one, smaller structure. Bronze letters have been removed from the Total $215,000 $300,000 sidewalk and overall signage is reduced. A basic scoreboard on the field replaces the LED video board on the arch.

  13. COTTINGHAM STADIUM REDESIGN PRESENTATION 11/6/19 ENTRANCE GATE 11 The mural remains and a portion of the existing gate will be reused. Pavers at the main entrance will be available for donor sponsorship. A new ramp makes the stadium ADA accessible from this entrance.

  14. COTTINGHAM STADIUM REDESIGN PRESENTATION 11/6/19 12TH STREET IMPROVEMENTS Item Low Range High Range 12 2 $100,000 $130,000 12th Street remains largely as it is today with 3 $60,000 $70,000 the existing retaining wall and mural. Plans 16 $60,000 $75,000 for curb widening, bump outs and asphalt 21* $200,000 $250,000 milling are removed. Electric service to stadium outbuildings remains overhead. Total $420,000 $525,000 *Savings include work on entrance gate

  15. COTTINGHAM STADIUM REDESIGN PRESENTATION 11/6/19 ENTRANCE GATE & 12TH STREET IMPROVEMENTS RENDERING 13 This rendering shows the main entrance to the stadium near the corner of 12th and Church streets. The tower has been reduced in size and ticket booths included into one structure. This view also shows 12th Street largely unchanged from how it exists today.

  16. COTTINGHAM STADIUM REDESIGN PRESENTATION 11/6/19 LOCKER ROOMS Item Low Range High Range 14 9 $40,000 $50,000 The overall scope of the field house is reduced. 10 $320,000 $350,000 Ten mini split AC units will remain, and exterior 11 $30,000 $40,000 equipment will be protected by fencing instead 15 $50,000 $60,000 of screen walls. Lockers are simplified and locker rooms will use a sealed concrete floor. Total $440,000 $500,000

  17. COTTINGHAM STADIUM REDESIGN PRESENTATION 11/6/19 OTHER SITE WORK Item Low Range High Range 15 6 $600,000 $690,000 Additional site works includes the removal 17 $30,000 $35,000 of planned new concession stands and the 18 $40,000 $50,000 new ticket/booster building. Hard wired data 24 $80,000 $100,000 connections and additional TV station cabling is removed. Total $750,000 $875,000

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.