LCS LCS LCSs for China LCSs for China s for China s for China R - - PowerPoint PPT Presentation
LCS LCS LCSs for China LCSs for China s for China s for China R - - PowerPoint PPT Presentation
LCS LCS LCSs for China LCSs for China s for China s for China R Residential Residential sector and R id id i l i l sector and d d transportation sector transportation sector p China team China team Tsukuba, w orkshop Tsukuba,
D d h D d h Dem and change Dem and change from ESS from ESS from ESS from ESS
Demand change Demand change g (residential sector) (residential sector)
2050/ 2005 Warm 1 40 Warm 1.40 Cool 1.79 H t 3 60 Hot water 3.60 Cook 1.72 Lighting 2.45 Frige 2.75
Unit Mtoe
- thers
2.74
Unit: Mtoe
Demand change Demand change Demand change Demand change (transportation (transportation-
- p sector)
p sector) ( p ( p p ) p )
2050/ 2005 PPV_S 5.51 PPV_M 5.50 PPV_L 5.00 CPV 7.60 BUS 8.00 TRN 3.82 SHP 7.71
Unit: Mtoe
AIR 20.00
Demand change Demand change Demand change Demand change (transportation (transportation-f sector) f sector) (transportation (transportation f sector) f sector)
2050/ 2005 FV_M 10.11 FV_L 10.11 TRN 5 22 TRN 5.22 SHP 8.00 AIR 59.58
Unit: Mtoe
Options Options Options Options
Building heating charge mechanism g g g
Unable to adapt for
20 years
adapt for existing buildings Accelerate Uncertainty of file demand Cost of installing meters and Reluctance of Accelerate retirement
- f existing
buildings demand Improvement
- f energy
t infrastructure modification for existing buildings developers to do this for new buildings
10 years
Government subsidy and public funding management system High capital Regulation and laws; punishment and reward High capital cost Government financial CDM, reward Difficult to expand in short time Lack of capita sources
5 years
a c a support or raise money from market C , electricity fee, redistribution
- f heating fee
Demonstration project
Green buildings and energy saving buildings and energy saving buildings
Few involvement of all Integrated approach Lack of knowledge in both supply and demand side stakeholders Unable to implement
20 years
No technology Training of stakeholders, such as d i p in short time Reluctance of stakeholders such No technology
- r lack of
technology designers, developers, consumers, etc. Incentive from government Demonstratio n project as developers Cooperation ith Lack of funding
G
government Lack involvement of company with developed countries Lack of enough market signal
Government support, capacity building by funding from developed countries
Incentive from government
10 years
market signal regulations and commands, tax
F l t Fuel tax
Higher price of gasoline Conflict of revenue distribution from fee collection or tax Loss for some revenue Loss for some special transportation type, e.g.
10 years
Reduce the fixed fee for vehicles Subsidy for
yp g agriculture
Coordination of different departments, e.g. tax vs. for vehicles y specific sectors ta s transportation department; central and local tax government
Institutional rearrangement
g
rearrangement
Raising tax in end point
5 years
Hybrid car
G t High price Government subsidy in initial phases; Improving R&D Public acceptance Difficult for
15 years
R&D expansion in short time Increase
- f
gasoline Awareness raising Low investment
- f Chinese
enterprises on Government demonstration Unwillingness from
Incentive from
governments
d
Lack of money to cover the cost of capacity buildings
5 years
gasoline price p R&D government officials Regulations on t hi l
and international cooperation
capacity buildings Support from developed countries government vehicles countries
Fuel cell car
Technology maturity High cost for hydrogen Lack of infrastructure Resources RE l R&D and technology learning R&D Input and technology Construction of infrastructure
50 years
RE power, nuclear power learning gy transfer infrastructure Lack of money Late player and weak basis Lack of money Cost competitiveness Government International cooperation;
20 years
weak basis Government input RPS, incentive for RE input cooperation; CDM
R l R l Result Result
Typical situation Typical situation Typical situation Typical situation from Chinese perspective from Chinese perspective
- Institutional change need time
- Culture difference
- Command and control methods vs
- Command and control methods vs.
market-based instruments
- Obligatory vs. voluntary
Back casting m odel Back casting m odel g
Options definition Options definition
Building heating charge g g g m echanism
- parameter set
Building warm Demand change 20 Demand change
- 20
Efficiency Fuel consumption change by fuel shift + 5(gas) Implement 30 years Implement 30 years
U it Mt Unit: Mtoe
Green buildings g and energy saving buildings
- parameter set
Green building Energy saving building warm cool warm cool Demand
- 18
- 1
- 0.23
- 1.36
change Efficiency 50% 50% 50% 50% Implement 35years 35years 35years 35years
U it Mt Unit: Mtoe
Fuel tax-p
- parameter set
PPV-S PPV-M PPV-L CPV Demand change
- 30
- 2
- 25
- 30
Effi i Efficiency Implement 35years 35years 40years 40years
Unit: Mtoe
Hybrid car-p
- parameter set
PPV-L Demand change Demand change Efficiency 100% Efficiency 100% Fuel consumption change by fuel shift
- 5(oil)
y Implement 40years
U it Mt Unit: Mtoe
F l ll Fuel cell car-p
- parameter set
PPV-S CPV Demand change Efficiency Fuel consumption change by fuel shift
- 20(oil)
- 30(oil)
I l t 20 20 Implement 20years 20years
U it Mt Unit: Mtoe
Results and discussion Results and discussion Results and discussion Results and discussion
Results Results – – option
- ption penetraion
penetraion p p
Results Results – CO2 emission CO2 emission Results Results CO2 emission CO2 emission
Discussion Discussion Discussion Discussion
- Setup of options
– Barrier 1: Different sectors and fuels: too complex and easy to be confused – Options: flexibility for fuel and sector selection for one option – Barrier 2: Bugs, difficult to judge the b l f l reasonability of results – Options: update the program, which need ’ f db k every person’s feedback
2015 2015
Strange Strange Change of Change of Change of Change of result result
2020 2025 2025
Di i Di i Discussion Discussion
- Options: How to consider the pre-request options?
– Model problem How to do for the options with less carbon reduction but – How to do for the options with less carbon reduction but investment collection which is also crucial
- Uncertainties:
– Time consuming – Assumption: too much, especially for cost – Linkage with other model: how to introduce? – Units: keep consistent Effects: option do not take effect as assumed – Effects: option do not take effect as assumed – Trend: linearly or other?