Introduction Qenos update since November ACNCG Qenos actions arising (nil raised) Community Regulatory Interface 2015 Qenos ACNCG Focus Areas 2014
Introduction Qenos update since November ACNCG Qenos actions arising (nil raised) Community Regulatory Interface 2015 Qenos ACNCG Focus Areas 2014 Performance Trends
Community
- December & March EMT meetings held
- Consultation
− Community briefing & discussion on Qenos Noise EIP conducted − EMTs moved to evening − several new members have joined EMT − Qenos SHE Excellence Awards
- Complaints
− 3 noise complaints in January for flare noise from Olefins after steam supply interruption.
Regulatory Interface
- EPA
- Discussed draft groundwater Quality Management plan with EPA in December
- Liaising with EPA about future of accredited licence program
- Regulatory noise limits established in residential areas endorsed by EPA
- CWW
- Minor Sulphide excursion for Olefins Trade waste 15th Dec & 30th Jan.
- Customer notified non compliance in place until ETP clean completed
- ETP clean executed without complaints or non compliances
- Worksafe
Nothing to report
2015 Goals
Aspect Aim
November 2014 ACNCG April 2015 ACNCG Status Improve SHE performance
Reduce injury rate
- 1 injury for the quarter, Injury rate better
than 2014 and plan. Reduced community noise
- Implementation of Plastics recycle
gearbox investment.
- Scope F-651 noise treatment.
- Reduced flare noise complaints.
- Community noise monitoring program in
place.
- One gearbox installed in March.
Performance being evaluated.
- F-651 scope evaluation in 2016.
- Complaints related to steam outage in
January,
- Community noise monitoring at Charles
Road & Galvin street in February And March
Business Outlook
Qenos is anticipating 2015 to be a further improvement in overall Business, however there is a general downturn across all sectors of industry at present.
- Change in global oil price has also
driven down regional PE pricing.
- Far more challenging year than we
anticipated.
Consolidate investments
Olefins plant will continue to focus upon ethylene yield optimisation and energy utilisation.
- Significant feedstock shortfall in Feb &
- March. April and May are also expected
to be lower. Esso industrial issues. Polymer plant reliability improvements and performance enhancement to achieve 200kT PE production.
- Based upon the first quarter ethane
shortfall and continuing restrictions in supply, PE volume will be well below plan. Support the major investment in Botany
- Turnaround planning process is on
100 120 140 160 180 200 220 240 2010 2011 2012 2013 2014
KT
Polyethylene production
93% of production plan
5 10 15 20 25 30 2010 2011 2012 2013 2014
Events per Annum Community complaints Environment incidents
Environment trends
Significant flare reduction reducing complaints. 2 Solvent LOC at Resins
Water Usages
Steam reductions. On site water reuse.
* No recycled water available in 2014
200 400 600 800 1000 1200 500 1,000 1,500 2,000 2,500 3,000 2010 2011 2012 2013 2014
ML / year ML / year Alternative Water supply Mains Water Supply Waste Water Water supply Waste water
Water Efficiency
Reduced steam production. Increased on site water reuse.
0.0 2.0 4.0 6.0 8.0 10.0 4 8 12 16 20 2010 2011 2012 2013 2014
KL / Tonne PE KL / Tonne PE Recycled water Water Consumption Waste Water Water supply Waste water
Greenhouse Gas Emissions
Altona Revamp & Cogeneration projects Steam savings
0.00 1.00 2.00 3.00 4.00 5.00 200 400 600 800 1,000
2010 * 2011 * 2012 * 2013 * 2014 *
Tonnes CO2/Tonne PE Emissions KT CO2e) Purchased Electricity Emissions On site emissions Emissions Intensity
30.0 35.0 40.0 45.0 50.0 55.0 60.0 2010 2011 2012 2013 2014
GJ/T PE Energy Efficiency
Energy Efficiency
Altona Revamp & Cogeneration projects Steam savings
200 400 600 800 1000 2010 2011 2012 2013 2014
Tonnes General waste Prescribed Waste to landfill Recycled waste
Waste
Prescribed waste in 2014
- Resins - pond cleans 50t
- Resins – mud-hole waste 48 t
- Olefins - caustic tank clean 41t
200 400 600 800 1000 2010* 2011* 2012* 2013* 2014*
Tonnes
VOC NOX SOX
* Financial year
Emissions
Reduction in boiler firing. Reduced flaring Reduced fugitive emissions
1 2 3 4 5 2010* 2011* 2012* 2013* 2014*
Tonnes Benzene
Financial year
Emissions
Minor increase in pump seal emissions
Aspect Aim 2013 vs 2014 Improve SHE performance
Reduce injury rate - TRIR 0.72 0.46 Reduce flare impact on community 2929t 850t
Business Outlook
With improved capacity and efficiency across the Altona Plants, coupled with the reduced $A Qenos expects 2014 to be see an improvement in overall Business performance - EBITDA 300%
Consolidate investments
Optimise the Olefins site for further yield improvements and energy efficiencies. 1% increase in yield 42 GJ/T 37 GJ/T Optimise steam generation from cogeneration plant 29 T/Hr 34 T/Hr Maximise ethylene/PE production across Altona Plants – 200kta 5 kT increase in ethylene production