Barnstable Town Council Update on Wastewater Efforts In Barnstable Department of Public Works November 21, 2019 1 Town of Barnstable, Department of Public Works Update Since September Update Since September Submitted Draft CWMP to Town


  1. Barnstable Town Council Update on Wastewater Efforts In Barnstable Department of Public Works November 21, 2019 1 Town of Barnstable, Department of Public Works

  2. Update Since September Update Since September • Submitted Draft CWMP to Town Council – Presentation of the Technical Plan – Oct 10, 2019 – Presentation of the Financial Plan – Oct 3, 2019 – Approved release of plan to regulators – Nov 7, 2019 • Modeling • UMASS-Dartmouth, School for Marine Science and Technology (“SMAST”) – Results were positive with model predicting the plan will achieve its goals • Public outreach • 4 Public Meetings – One filmed and broadcast on Channel 18 and on Town Website • Channel 18 continuing development of multi media presentation materials 2 Town of Barnstable, Department of Public Works

  3. Update Since September Update Since September • CWMP Review – Met with DEP staff, received feedback on preliminary review of the plan – Met with consultant on QA/QC of the plan • Regulatory Meetings – Nov 26 th , meeting with CCC Staff – Meeting expected mid December with MEPA Staff 3 Town of Barnstable, Department of Public Works

  4. Update Since September Update Since September • JBCC/Western Solutions – DEP Discussions • Sampson's Island Dredging – Underway • Mill Pond – Continuing discussions with Massachusetts Natural Heritage & Endangered Species Program (NHESP) • Marstons Mills River System – Continue work with Barnstable Clean Water Coalition, EPA, and Nature Conservancy on alternatives 4 Town of Barnstable, Department of Public Works

  5. Next Steps Next Steps • Ongoing public outreach as requested • Update Draft CWMP based on comments received • Submit to CCC and DEP and for MEPA review • Continue pursuing alternatives – Permitting, funding, executing, monitoring • Preliminary design of traditional projects underway 5 Town of Barnstable, Department of Public Works

  6. Discussion? Discussion? 6 Town of Barnstable, Department of Public Works

  7. Financial Policy Decisions Financial Policy Decisions • How will the town differentiate General Benefit Facility costs from Specific Benefit Facility costs? • What assessment method will be used for allocating those costs? • What limit, if any, will be set on the maximum amount for a sewer assessment? • What interest rate will be charged on sewer assessments? • What amortization period will be used sewer assessments? • When will a property abutter be required to hookup? Town of Barnstable, Department of Public Works 7

  8. Financial Policy Decisions - Financial Policy Decisions - Continued Continued • Will bond amortization be authorized beyond 20 years? • Will the General Fund contribute to the program? If so; – How much? – What mechanism will be used? • Will a Systems Development Charge be included? • Should the town pursue special legislation to create a revolving loan program? – Amortization period and loan rate? • Should the town administer a connection program? Town of Barnstable, Department of Public Works 8

  9. General Policy Issues General Policy Issues • Effluent Disposal • Handling of Private Roads – Easements needed for the pipes – With the planned improvements does the Town take them? • Governance of the sewer system (Sewer Commissioners)? • Approval of an updated Sewer Use Ordinance – Has a series of decisions associated with it • Inter Municipal Agreements – Watershed Permits – Shared Technology – Conveyance of flows through adjoining Towns (JBCC) 9 Town of Barnstable, Department of Public Works

  10. 10 Town of Barnstable, Department of Public Works

  11. Non-traditional Focus Area – Non-traditional Focus Area – Three Bays Three Bays Non-traditional methods. • Cotuit Bay Inlet Dredging • Mill Pond dredging • Abandoned cranberry bogs conversion • Warren’s Cove - aquaculture • Alternative septic systems • Permeable Reactive Barriers (PRBs) • Stormwater treatment 11 Town of Barnstable, Department of Public Works

  12. The Plan Summary The Plan Summary Number of Total Resulting Total Resulting Parcels to be Removal of Removal of Connected to Nitrogen Nitrogen Watershed Sewer (kg/day) (kg/yr) Notes Lewis Bay 1,081 15.8 5,767 Includes Stewarts Creek Project Halls Creek 351 4.8 1,752 Centerville River 4,434 71.6 26,134 Three Bays 3,714 74.9 27,339 Rushy Marsh 0 0.0 0 Popponesset Bay 524 8.4 3,066 Barnstable Harbor 740 11.7 4,271 Undefined 162 4.5 1,643 11,006 192 69,971 Total: • In addition, improvements at the WPCF will reduce existing nitrogen in Lewis Bay by an additional 18.9 kg/day or 6,898.5 kg/yr • Does not include Non-traditional Improvements 12 Town of Barnstable, Department of Public Works

  13. Results By Phase or Stage Results By Phase or Stage Phase 1 Phase 2 Phase 3 (0-10 (10-20 (20-30 Total Years) Years) Years) WW Captured (gpd) 782,000 653,000 335,000 1,770,000 Load N Removed (kg/day) 78 65 33 176 Number of Parcels Affected 4,610 3,130 2,100 9,870 Approximate Road Miles 90 60 40 190 % of N Removed by Plan 44% 37% 19% Does not include benefits from Non-traditional approaches Stage 1 Stage 2 Stage 3 Total WW Captured (gpd) 37,200 84,500 22,800 144,500 Load N Removed (kg/day) 4 8 2 14 Number of Parcels Affected 250 480 160 890 Approximate Road Miles 6 9 3 18 13 Town of Barnstable, Department of Public Works

  14. Summary of Funding for CWMP Summary of Funding for CWMP Funding Sources Estimated Principal Subsidies on Bond Issues $112,229,437 11% Sewer Assessments $255,764,639 24% Investment Earnings $11,397,346 1% General Fund Contribution $70,500,000 7% System Development Charges $19,624,000 2% User Rate Revenue $128,524,045 12% Rooms and Meals Taxes including STR $463,211,220 44% Total funding sources $1,061,250,687 100% Town of Barnstable, Department of Public Works 14

  15. Phase I Projects Phase I Projects 15 Town of Barnstable, Department of Public Works

  16. Phase I Implementation Phase I Implementation Number of Wastewater Total N % of Total N Project Parcels Captured Removed Removed in Connected (gpd) (kg/day) Phase 1 Merchants Way 7 0 4.7 6.0% Strawberry Hill Road 240 47,066 0.9 1.2% Route 28 East 49 9,440 11.4 14.7% Old Yarmouth Road 131 22,603 0.6 0.7% Phinneys Lane 653 94,200 7.9 10.1% Long Beach 203 37,647 3.6 4.7% Route 28 Centerville 41 5,534 4.1 5.3% Huckins Neck 148 21,506 3.3 4.2% Phase 1 is 44% Long Pond Area 606 114,599 5.9 7.6% Great Marsh Road 406 79,299 5.3 6.8% of the Overall Old Craigville Road 397 41,512 2.4 3.1% Plan. Route 28 Marstons Mills 157 36,429 3.3 4.2% Osterville Woods 328 59,571 5.2 6.7% Shootflying Hill Road 348 52,306 1.7 2.2% Lumbert Mill 357 53,221 9.4 12.0% Osterville-West Barnstable Road & South County 153 32,787 3.7 4.8% Road Marstons Mills Main Street 144 24,123 2.1 2.8% Prince Cove 158 32,972 0.0 0.0% Attucks Lane / Kidds Hill 87 16,893 2.2 2.9% Area 100.0% 1 Total 4,613 781,708 77.7 16 Town of Barnstable, Department of Public Works

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.