lochgilphead lochgilphead wastewater treatment wastewater
play

LOCHGILPHEAD LOCHGILPHEAD WASTEWATER TREATMENT WASTEWATER - PowerPoint PPT Presentation

LOCHGILPHEAD LOCHGILPHEAD WASTEWATER TREATMENT WASTEWATER TREATMENT FACILITY FACILITY LOCHGILPHEAD WASTEWATER LOCHGILPHEAD WASTEWATER TREATMENT FACILITY TREATMENT FACILITY Why Do We Need A New Facility? Why Do We Need A New Facility?


  1. LOCHGILPHEAD LOCHGILPHEAD WASTEWATER TREATMENT WASTEWATER TREATMENT FACILITY FACILITY

  2. LOCHGILPHEAD WASTEWATER LOCHGILPHEAD WASTEWATER TREATMENT FACILITY TREATMENT FACILITY Why Do We Need A New Facility? Why Do We Need A New Facility? • • To comply with the Urban WWTW (Scotland) Regulations 1994. To comply with the Urban WWTW (Scotland) Regulations 1994. st December 2005 – Provide appropriate Waste Water Treatment by 31 Provide appropriate Waste Water Treatment by 31 st December 2005 – • • Improve upon current situation. Improve upon current situation. – Remove 5 existing continuous discharge outfalls. Remove 5 existing continuous discharge outfalls. – – – Provide modern works with odour control. Provide modern works with odour control. – Provide modern sludge treatment facility for Mid Argyll. Provide modern sludge treatment facility for Mid Argyll. –

  3. Site Selection Site Selection • Best Practicable Environmental Option • Best Practicable Environmental Option (BPEO) (BPEO) • Site Options Consultation Exercise • Site Options Consultation Exercise • Kilmory • Kilmory – – preferred site preferred site

  4. Site Location Site Location

  5. Photograph of existing site Photograph of existing site looking east to site entrance looking east to site entrance

  6. Project Description Project Description • Collection and transfer system, wastewater treatment • Collection and transfer system, wastewater treatment and regional sludge treatment centre; and regional sludge treatment centre; - Stormwater storage and screening - Stormwater storage and screening - Wastewater screening and grit removal - Wastewater screening and grit removal - New primary settlement tanks with automatic desludging - New primary settlement tanks with automatic desludging - Modern purpose - Modern purpose- -built sludge treatment to replace built sludge treatment to replace temporary containerised plant temporary containerised plant - Odour control - Odour control - Discharge via long sea outfall - Discharge via long sea outfall

  7. Proposed Site Layout Proposed Site Layout

  8. Main Findings of Environmental Main Findings of Environmental Statement Statement • Acceptable visual impact • Acceptable visual impact • Acceptable traffic impact • Acceptable traffic impact • Acceptable noise impact • Acceptable noise impact • Acceptable and improved odour impact • Acceptable and improved odour impact • Agreed mitigation measures • Agreed mitigation measures

  9. Photograph of site looking south on Photograph of site looking south on A83 from shinty pitch A83 from shinty pitch

  10. Photograph of site looking east on A83 Photograph of site looking east on A83 from foreshore, north of Ardrishaig from foreshore, north of Ardrishaig

  11. Photograph of site looking east on A83 Photograph of site looking east on A83 from centre of Ardrishaig from centre of Ardrishaig

  12. Main Findings of Environmental Main Findings of Environmental Statement Statement • Acceptable visual impact • Acceptable visual impact • Acceptable traffic impact • Acceptable traffic impact • Acceptable noise impact • Acceptable noise impact • Acceptable and improved odour impact • Acceptable and improved odour impact • Agreed mitigation measures • Agreed mitigation measures

  13. SEPA Consents SEPA Consents • Consent for new discharge. • Consent for new discharge. • Drainage area modelling of both • Drainage area modelling of both communities. communities. • Marine modelling of Loch Gilp & Loch • Marine modelling of Loch Gilp & Loch Fyne. Fyne. • Consultation Exercises. • Consultation Exercises.

  14. Summary of Benefits and Summary of Benefits and Improvements Improvements • Improved Water Quality • Improved Water Quality • Single Modern Wastewater Treatment Facility to • Single Modern Wastewater Treatment Facility to serve both Ardrishaig & Lochgilphead. serve both Ardrishaig & Lochgilphead. • Removal of existing odour problem. • Removal of existing odour problem. • Overall investment of £8 million. • Overall investment of £8 million.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend