LOCHGILPHEAD LOCHGILPHEAD WASTEWATER TREATMENT WASTEWATER - - PowerPoint PPT Presentation

lochgilphead lochgilphead wastewater treatment wastewater
SMART_READER_LITE
LIVE PREVIEW

LOCHGILPHEAD LOCHGILPHEAD WASTEWATER TREATMENT WASTEWATER - - PowerPoint PPT Presentation

LOCHGILPHEAD LOCHGILPHEAD WASTEWATER TREATMENT WASTEWATER TREATMENT FACILITY FACILITY LOCHGILPHEAD WASTEWATER LOCHGILPHEAD WASTEWATER TREATMENT FACILITY TREATMENT FACILITY Why Do We Need A New Facility? Why Do We Need A New Facility?


slide-1
SLIDE 1

LOCHGILPHEAD LOCHGILPHEAD WASTEWATER TREATMENT WASTEWATER TREATMENT FACILITY FACILITY

slide-2
SLIDE 2

Why Do We Need A New Facility? Why Do We Need A New Facility?

  • To comply with the Urban WWTW (Scotland) Regulations 1994.

To comply with the Urban WWTW (Scotland) Regulations 1994.

– – Provide appropriate Waste Water Treatment by 31 Provide appropriate Waste Water Treatment by 31st

st December 2005

December 2005

  • Improve upon current situation.

Improve upon current situation.

– – Remove 5 existing continuous discharge outfalls. Remove 5 existing continuous discharge outfalls. – – Provide modern works with odour control. Provide modern works with odour control. – – Provide modern sludge treatment facility for Mid Argyll. Provide modern sludge treatment facility for Mid Argyll.

LOCHGILPHEAD WASTEWATER LOCHGILPHEAD WASTEWATER TREATMENT FACILITY TREATMENT FACILITY

slide-3
SLIDE 3

Site Selection Site Selection

  • Best Practicable Environmental Option

Best Practicable Environmental Option (BPEO) (BPEO)

  • Site Options Consultation Exercise

Site Options Consultation Exercise

  • Kilmory

Kilmory – – preferred site preferred site

slide-4
SLIDE 4

Site Location Site Location

slide-5
SLIDE 5

Photograph of existing site Photograph of existing site looking east to site entrance looking east to site entrance

slide-6
SLIDE 6

Project Description Project Description

  • Collection and transfer system, wastewater treatment

Collection and transfer system, wastewater treatment and regional sludge treatment centre; and regional sludge treatment centre;

  • Stormwater storage and screening

Stormwater storage and screening

  • Wastewater screening and grit removal

Wastewater screening and grit removal

  • New primary settlement tanks with automatic desludging

New primary settlement tanks with automatic desludging

  • Modern purpose

Modern purpose-

  • built sludge treatment to replace

built sludge treatment to replace temporary containerised plant temporary containerised plant

  • Odour control

Odour control

  • Discharge via long sea outfall

Discharge via long sea outfall

slide-7
SLIDE 7

Proposed Site Layout Proposed Site Layout

slide-8
SLIDE 8

Main Findings of Environmental Main Findings of Environmental Statement Statement

  • Acceptable visual impact

Acceptable visual impact

  • Acceptable traffic impact

Acceptable traffic impact

  • Acceptable noise impact

Acceptable noise impact

  • Acceptable and improved odour impact

Acceptable and improved odour impact

  • Agreed mitigation measures

Agreed mitigation measures

slide-9
SLIDE 9

Photograph of site looking south on Photograph of site looking south on A83 from shinty pitch A83 from shinty pitch

slide-10
SLIDE 10

Photograph of site looking east on A83 Photograph of site looking east on A83 from foreshore, north of Ardrishaig from foreshore, north of Ardrishaig

slide-11
SLIDE 11

Photograph of site looking east on A83 Photograph of site looking east on A83 from centre of Ardrishaig from centre of Ardrishaig

slide-12
SLIDE 12

Main Findings of Environmental Main Findings of Environmental Statement Statement

  • Acceptable visual impact

Acceptable visual impact

  • Acceptable traffic impact

Acceptable traffic impact

  • Acceptable noise impact

Acceptable noise impact

  • Acceptable and improved odour impact

Acceptable and improved odour impact

  • Agreed mitigation measures

Agreed mitigation measures

slide-13
SLIDE 13

SEPA Consents SEPA Consents

  • Consent for new discharge.

Consent for new discharge.

  • Drainage area modelling of both

Drainage area modelling of both communities. communities.

  • Marine modelling of Loch Gilp & Loch

Marine modelling of Loch Gilp & Loch Fyne. Fyne.

  • Consultation Exercises.

Consultation Exercises.

slide-14
SLIDE 14

Summary of Benefits and Summary of Benefits and Improvements Improvements

  • Improved Water Quality

Improved Water Quality

  • Single Modern Wastewater Treatment Facility to

Single Modern Wastewater Treatment Facility to serve both Ardrishaig & Lochgilphead. serve both Ardrishaig & Lochgilphead.

  • Removal of existing odour problem.

Removal of existing odour problem.

  • Overall investment of £8 million.

Overall investment of £8 million.