LOCHGILPHEAD LOCHGILPHEAD WASTEWATER TREATMENT WASTEWATER - - PowerPoint PPT Presentation
LOCHGILPHEAD LOCHGILPHEAD WASTEWATER TREATMENT WASTEWATER - - PowerPoint PPT Presentation
LOCHGILPHEAD LOCHGILPHEAD WASTEWATER TREATMENT WASTEWATER TREATMENT FACILITY FACILITY LOCHGILPHEAD WASTEWATER LOCHGILPHEAD WASTEWATER TREATMENT FACILITY TREATMENT FACILITY Why Do We Need A New Facility? Why Do We Need A New Facility?
Why Do We Need A New Facility? Why Do We Need A New Facility?
- To comply with the Urban WWTW (Scotland) Regulations 1994.
To comply with the Urban WWTW (Scotland) Regulations 1994.
– – Provide appropriate Waste Water Treatment by 31 Provide appropriate Waste Water Treatment by 31st
st December 2005
December 2005
- Improve upon current situation.
Improve upon current situation.
– – Remove 5 existing continuous discharge outfalls. Remove 5 existing continuous discharge outfalls. – – Provide modern works with odour control. Provide modern works with odour control. – – Provide modern sludge treatment facility for Mid Argyll. Provide modern sludge treatment facility for Mid Argyll.
LOCHGILPHEAD WASTEWATER LOCHGILPHEAD WASTEWATER TREATMENT FACILITY TREATMENT FACILITY
Site Selection Site Selection
- Best Practicable Environmental Option
Best Practicable Environmental Option (BPEO) (BPEO)
- Site Options Consultation Exercise
Site Options Consultation Exercise
- Kilmory
Kilmory – – preferred site preferred site
Site Location Site Location
Photograph of existing site Photograph of existing site looking east to site entrance looking east to site entrance
Project Description Project Description
- Collection and transfer system, wastewater treatment
Collection and transfer system, wastewater treatment and regional sludge treatment centre; and regional sludge treatment centre;
- Stormwater storage and screening
Stormwater storage and screening
- Wastewater screening and grit removal
Wastewater screening and grit removal
- New primary settlement tanks with automatic desludging
New primary settlement tanks with automatic desludging
- Modern purpose
Modern purpose-
- built sludge treatment to replace
built sludge treatment to replace temporary containerised plant temporary containerised plant
- Odour control
Odour control
- Discharge via long sea outfall
Discharge via long sea outfall
Proposed Site Layout Proposed Site Layout
Main Findings of Environmental Main Findings of Environmental Statement Statement
- Acceptable visual impact
Acceptable visual impact
- Acceptable traffic impact
Acceptable traffic impact
- Acceptable noise impact
Acceptable noise impact
- Acceptable and improved odour impact
Acceptable and improved odour impact
- Agreed mitigation measures
Agreed mitigation measures
Photograph of site looking south on Photograph of site looking south on A83 from shinty pitch A83 from shinty pitch
Photograph of site looking east on A83 Photograph of site looking east on A83 from foreshore, north of Ardrishaig from foreshore, north of Ardrishaig
Photograph of site looking east on A83 Photograph of site looking east on A83 from centre of Ardrishaig from centre of Ardrishaig
Main Findings of Environmental Main Findings of Environmental Statement Statement
- Acceptable visual impact
Acceptable visual impact
- Acceptable traffic impact
Acceptable traffic impact
- Acceptable noise impact
Acceptable noise impact
- Acceptable and improved odour impact
Acceptable and improved odour impact
- Agreed mitigation measures
Agreed mitigation measures
SEPA Consents SEPA Consents
- Consent for new discharge.
Consent for new discharge.
- Drainage area modelling of both
Drainage area modelling of both communities. communities.
- Marine modelling of Loch Gilp & Loch
Marine modelling of Loch Gilp & Loch Fyne. Fyne.
- Consultation Exercises.
Consultation Exercises.
Summary of Benefits and Summary of Benefits and Improvements Improvements
- Improved Water Quality
Improved Water Quality
- Single Modern Wastewater Treatment Facility to
Single Modern Wastewater Treatment Facility to serve both Ardrishaig & Lochgilphead. serve both Ardrishaig & Lochgilphead.
- Removal of existing odour problem.
Removal of existing odour problem.
- Overall investment of £8 million.