2016 April ACNCG 8/04/2016 Introduction Qenos update since November ACNCG Qenos actions arising Community Regulatory Interface 2016 Qenos ACNCG Focus Areas 2015 Performance Trends 2 Actions arising Overview of EAPP program
2
Introduction Qenos update since November ACNCG Qenos actions arising Community Regulatory Interface 2016 Qenos ACNCG Focus Areas 2015 Performance Trends
3
Actions arising
Overview of EAPP program given @ December EMT. Follow up meeting with community reps on 17th Dec
4
Community
- December & March EMT meetings held
- March EMT at Plastics with site tour
- Consultation
- Qenos and ACNCG Website update about SCAl-2 start-up on 24th February
- Qenos SHE Excellence Awards held on 23rd March
- Complaints
- 3 flare noise complaints
- Nov ‘15 Scal-1 ethylene off spec
- Jan ‘16 Scal-2 ethylene off spec
- Feb ‘16 Scal-2 plant start up
- 2 odour complaints
- Feb ‘16 Effluent Treatment Plant
- Mar ‘16 Effluent Treatment Plant
5
Regulatory Interface
- EPA
- Submitted Groundwater Quality Management plan to EPA in December ‘15
- Participation in Earned Autonomy Pilot Program.
- Attended network sessions in Nov ‘15 and Feb ‘16
- Notified EPA about overflows to stormwater on 30th January during a storm
- CWW
- Standing non compliance in place for Sulphides in Olefins trade waste.
- Non compliance for Styrene on Jan 16
- Worksafe
- MHF 2015 over sight report received
- Reported injury to finger at Plastics on February 4th (jammed finger)
- Reported small fire on a compressor on February 14th (oil build up on steam line)
6
Aspect
2016 focus April 2016 ACNCG Status Improve SHE performance
- Greater leadership and workforce
engagement, accountability and improved performance indicators
- 1 Contractor injury for the first quarter
which required some medical treatment.
- Noise EIP activities in progress
- Recycled water usage at 69% of Altona
total water usage
- Implement Noise EIP activities
- Continue Groundwater management
plan.
- Maximise recycled water.
- Develop implementation plan for ISO-
14001 accreditation
- Develop draft MHF Safety Case
submission for 2017 application
Business
- utlook
- Oil and $A look stable and forecast for
PE regional pricing is low
- $38M capital program for 2016 across
Qenos
- First quarter business performance on
plan
- Preparation & engineering work for
plant trials of new milk bottle grade continuing.
- First plant trial of new pipe grade
completed and product under long term testing
- Looking to develop new milk bottle
product and pipe grades
- If ethane supply is as per plan across
both states, then expect PE production to be highest for 7-8yrs
- Continuous improvement focus across
the business
2015 Performance trends
8/04/2016
8
100 120 140 160 180 200 220 240 2011 2012 2013 2014 2015
KT
Polyethylene production
- 82% of production plan.
- Ethane feedstock shortage due to IR disputation as Esso resulted in
the majority of the production shortfall
9
Environment trends
5 10 15 20 2011 2012 2013 2014 2015 Community complaints Environment incidents
- Five complaints for flare noise.
– Three related to steam failure in January
- One odour complaint for Effluent plant odour
- Four trade waste non compliances.
– Three related to sulphides
10 10
Water Usages
500 1000 1500 2000 2500 3000 2011 2012 2013 2014 2015
ML/year
Recycled water Mains Water Waste Water
- Recycled water commenced in June.
– Expect to double recycled water use in 2016
11 11
Water Efficiency
- Efficiency reduced due to lower PE production volumes at 82% of plan
4 8 12 16 20 2011 2012 2013 2014 2015
KL/Tonne PE
Recycled water Mains Water Waste Water
12 12
Greenhouse Gas Emissions
- Emissions and efficiency reduced due to lower production.
1 2 3 4 5
200 400 600 800 1000 2011 2012 2013 2014 2015
Tonnes CO2/Tonne PE Emissions KT CO2
Purchased Electricity Emissions On site emissions Emissions intensity
Financial year
13 13
Energy Efficiency
10 20 30 40 50 60 2011 2012 2013 2014 2015
Energy efficiency
Energy efficiency
- Some energy efficiency improvements
14 14
Waste
- Prescribed waste in 2016
– Resins - Pond clean bio-pile disposal 391 tonnes. – Resins – mud-hole waste 75 t
100 200 300 400 500 600 700 2011 2012 2013 2014 2015
Tonnes
General waste Prescribed Waste to landfill Recycled waste
15 15
Financial year
Emissions
- Lower production reduced fired emissions of SOX and NOX
100 200 300 400 500 600 700 2011 2012 2013 2014 2015
Tonnes
VOC NOX SOX
16 16
Financial year
Emissions
- Verified and updated all stream compositions in LDAR program.
– Benzene composition higher in some streams caused increase
1 2 3 4 2011 2012 2013 2014 2015 Tonnes Benzene