  2. Introduction Qenos update since November ACNCG � Qenos actions arising � Community � Regulatory Interface 2016 Qenos ACNCG Focus Areas 2015 Performance Trends 2

  3. Actions arising � Overview of EAPP program given @ December EMT. � Follow up meeting with community reps on 17th Dec 3

  4. Community • December & March EMT meetings held • March EMT at Plastics with site tour • Consultation Qenos and ACNCG Website update about SCAl-2 start-up on 24 th February • Qenos SHE Excellence Awards held on 23 rd March • • Complaints • 3 flare noise complaints Nov ‘15 Scal-1 ethylene off spec • Jan ‘16 Scal-2 ethylene off spec • Feb ‘16 Scal-2 plant start up • • 2 odour complaints Feb ‘16 Effluent Treatment Plant • Mar ‘16 Effluent Treatment Plant • 4

  5. Regulatory Interface • EPA • Submitted Groundwater Quality Management plan to EPA in December ‘15 • Participation in Earned Autonomy Pilot Program. • Attended network sessions in Nov ‘15 and Feb ‘16 Notified EPA about overflows to stormwater on 30 th January during a storm • • CWW • Standing non compliance in place for Sulphides in Olefins trade waste. • Non compliance for Styrene on Jan 16 • Worksafe • MHF 2015 over sight report received • Reported injury to finger at Plastics on February 4 th (jammed finger) Reported small fire on a compressor on February 14 th (oil build up on steam line) • 5

  6. 2016 focus April 2016 ACNCG Status � � Greater leadership and workforce 1 Contractor injury for the first quarter Improve SHE engagement, accountability and which required some medical treatment. performance � improved performance indicators Noise EIP activities in progress � Recycled water usage at 69% of Altona � Implement Noise EIP activities total water usage � Continue Groundwater management plan. � Maximise recycled water. � Develop implementation plan for ISO- 14001 accreditation � Develop draft MHF Safety Case submission for 2017 application Aspect � � Business Oil and $A look stable and forecast for First quarter business performance on PE regional pricing is low plan outlook � � $38M capital program for 2016 across Preparation & engineering work for Qenos plant trials of new milk bottle grade continuing. � Looking to develop new milk bottle � First plant trial of new pipe grade product and pipe grades completed and product under long term � If ethane supply is as per plan across testing both states, then expect PE production to be highest for 7-8yrs � Continuous improvement focus across 6 the business

  7. 2015 Performance trends 8/04/2016

  8. Polyethylene production • 82% of production plan. • Ethane feedstock shortage due to IR disputation as Esso resulted in the majority of the production shortfall 240 220 200 180 KT 160 140 120 100 2011 2012 2013 2014 2015 8

  9. Environment trends • Five complaints for flare noise. – Three related to steam failure in January • One odour complaint for Effluent plant odour • Four trade waste non compliances. – Three related to sulphides 20 15 Community complaints 10 Environment incidents 5 0 2011 2012 2013 2014 2015 9

  10. Water Usages • Recycled water commenced in June. – Expect to double recycled water use in 2016 3000 2500 2000 ML/year Recycled water 1500 Mains Water 1000 500 Waste Water 0 2011 2012 2013 2014 2015 10 10

  11. Water Efficiency • Efficiency reduced due to lower PE production volumes at 82% of plan 20 16 Recycled water KL/Tonne PE 12 Mains Water 8 Waste Water 4 0 2011 2012 2013 2014 2015 11 11

  12. Greenhouse Gas Emissions • Emissions and efficiency reduced due to lower production. 5 1000 Emissions KT CO2 Tonnes CO2/Tonne PE 4 800 3 600 2 400 1 200 0 0 2011 2012 2013 2014 2015 Purchased Electricity Emissions On site emissions Emissions intensity Financial year 12 12

  13. Energy Efficiency • Some energy efficiency improvements Energy efficiency 60 50 40 30 Energy efficiency 20 10 0 13 13 2011 2012 2013 2014 2015

  14. Waste • Prescribed waste in 2016 – Resins - Pond clean bio-pile disposal 391 tonnes. – Resins – mud-hole waste 75 t 700 600 500 Tonnes 400 300 200 100 0 2011 2012 2013 2014 2015 General waste Prescribed Waste to landfill Recycled waste 14 14

  15. Emissions • Lower production reduced fired emissions of SOX and NOX 700 600 Tonnes 500 400 300 200 100 0 2011 2012 2013 2014 2015 VOC NOX SOX Financial year 15 15

  16. Emissions • Verified and updated all stream compositions in LDAR program. – Benzene composition higher in some streams caused increase 4 3 Tonnes 2 Benzene 1 0 2011 2012 2013 2014 2015 Financial year 16 16

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.