2016 April ACNCG 8/04/2016 Introduction Qenos update since - - PowerPoint PPT Presentation

2016 April ACNCG 8/04/2016 Introduction Qenos update since November ACNCG Qenos actions arising Community Regulatory Interface 2016 Qenos ACNCG Focus Areas 2015 Performance Trends 2 Actions arising Overview of EAPP program


slide-1
SLIDE 1

2016 April ACNCG

8/04/2016

slide-2
SLIDE 2

2

Introduction Qenos update since November ACNCG Qenos actions arising Community Regulatory Interface 2016 Qenos ACNCG Focus Areas 2015 Performance Trends

slide-3
SLIDE 3

3

Actions arising

Overview of EAPP program given @ December EMT. Follow up meeting with community reps on 17th Dec

slide-4
SLIDE 4

4

Community

  • December & March EMT meetings held
  • March EMT at Plastics with site tour
  • Consultation
  • Qenos and ACNCG Website update about SCAl-2 start-up on 24th February
  • Qenos SHE Excellence Awards held on 23rd March
  • Complaints
  • 3 flare noise complaints
  • Nov ‘15 Scal-1 ethylene off spec
  • Jan ‘16 Scal-2 ethylene off spec
  • Feb ‘16 Scal-2 plant start up
  • 2 odour complaints
  • Feb ‘16 Effluent Treatment Plant
  • Mar ‘16 Effluent Treatment Plant
slide-5
SLIDE 5

5

Regulatory Interface

  • EPA
  • Submitted Groundwater Quality Management plan to EPA in December ‘15
  • Participation in Earned Autonomy Pilot Program.
  • Attended network sessions in Nov ‘15 and Feb ‘16
  • Notified EPA about overflows to stormwater on 30th January during a storm
  • CWW
  • Standing non compliance in place for Sulphides in Olefins trade waste.
  • Non compliance for Styrene on Jan 16
  • Worksafe
  • MHF 2015 over sight report received
  • Reported injury to finger at Plastics on February 4th (jammed finger)
  • Reported small fire on a compressor on February 14th (oil build up on steam line)
slide-6
SLIDE 6

6

Aspect

2016 focus April 2016 ACNCG Status Improve SHE performance

  • Greater leadership and workforce

engagement, accountability and improved performance indicators

  • 1 Contractor injury for the first quarter

which required some medical treatment.

  • Noise EIP activities in progress
  • Recycled water usage at 69% of Altona

total water usage

  • Implement Noise EIP activities
  • Continue Groundwater management

plan.

  • Maximise recycled water.
  • Develop implementation plan for ISO-

14001 accreditation

  • Develop draft MHF Safety Case

submission for 2017 application

Business

  • utlook
  • Oil and $A look stable and forecast for

PE regional pricing is low

  • $38M capital program for 2016 across

Qenos

  • First quarter business performance on

plan

  • Preparation & engineering work for

plant trials of new milk bottle grade continuing.

  • First plant trial of new pipe grade

completed and product under long term testing

  • Looking to develop new milk bottle

product and pipe grades

  • If ethane supply is as per plan across

both states, then expect PE production to be highest for 7-8yrs

  • Continuous improvement focus across

the business

slide-7
SLIDE 7

2015 Performance trends

8/04/2016

slide-8
SLIDE 8

8

100 120 140 160 180 200 220 240 2011 2012 2013 2014 2015

KT

Polyethylene production

  • 82% of production plan.
  • Ethane feedstock shortage due to IR disputation as Esso resulted in

the majority of the production shortfall

slide-9
SLIDE 9

9

Environment trends

5 10 15 20 2011 2012 2013 2014 2015 Community complaints Environment incidents

  • Five complaints for flare noise.

– Three related to steam failure in January

  • One odour complaint for Effluent plant odour
  • Four trade waste non compliances.

– Three related to sulphides

slide-10
SLIDE 10

10 10

Water Usages

500 1000 1500 2000 2500 3000 2011 2012 2013 2014 2015

ML/year

Recycled water Mains Water Waste Water

  • Recycled water commenced in June.

– Expect to double recycled water use in 2016

slide-11
SLIDE 11

11 11

Water Efficiency

  • Efficiency reduced due to lower PE production volumes at 82% of plan

4 8 12 16 20 2011 2012 2013 2014 2015

KL/Tonne PE

Recycled water Mains Water Waste Water

slide-12
SLIDE 12

12 12

Greenhouse Gas Emissions

  • Emissions and efficiency reduced due to lower production.

1 2 3 4 5

200 400 600 800 1000 2011 2012 2013 2014 2015

Tonnes CO2/Tonne PE Emissions KT CO2

Purchased Electricity Emissions On site emissions Emissions intensity

Financial year

slide-13
SLIDE 13

13 13

Energy Efficiency

10 20 30 40 50 60 2011 2012 2013 2014 2015

Energy efficiency

Energy efficiency

  • Some energy efficiency improvements
slide-14
SLIDE 14

14 14

Waste

  • Prescribed waste in 2016

– Resins - Pond clean bio-pile disposal 391 tonnes. – Resins – mud-hole waste 75 t

100 200 300 400 500 600 700 2011 2012 2013 2014 2015

Tonnes

General waste Prescribed Waste to landfill Recycled waste

slide-15
SLIDE 15

15 15

Financial year

Emissions

  • Lower production reduced fired emissions of SOX and NOX

100 200 300 400 500 600 700 2011 2012 2013 2014 2015

Tonnes

VOC NOX SOX

slide-16
SLIDE 16

16 16

Financial year

Emissions

  • Verified and updated all stream compositions in LDAR program.

– Benzene composition higher in some streams caused increase

1 2 3 4 2011 2012 2013 2014 2015 Tonnes Benzene