I L ROUT E 60/ 83 Co mmunity Adviso ry Gro up Me e ting No . 5 April 28, 2010 Outline Ag e nda Introduction to Participants Recap of Community Advisory Group Meeting No. 4 - April 21, 2010 Segment No. 1 IL Route 176 to


slide-1
SLIDE 1

I L ROUT E 60/ 83

Co mmunity Adviso ry Gro up Me e ting No . 5 April 28, 2010

slide-2
SLIDE 2

Outline Ag e nda

  • Introduction to Participants
  • Recap of Community Advisory Group Meeting No. 4 -

April 21, 2010

  • Segment No. 1 – IL Route 176 to South of Midlothian

Road; April 21, 2010

  • Segment No. 2 – South of Midlothian Road to South
  • f the EJ&E Railroad; April 28, 2010
slide-3
SLIDE 3

Outline Ag e nda

  • IDOT Design Criteria
  • Cross Sectional Design Elements
  • Intersection Improvements

– Diamond Lake Road – IL Route 60 (Townline Road) / Willow Springs Road

  • Railroad Crossing Grade Separation Options
  • Alternatives Developed to Date
slide-4
SLIDE 4

Who Are We ?

Introductions

slide-5
SLIDE 5

Re c ap o f Pre vio us Co mmunity Adviso ry Gro up Me e ting s

  • Four previous CAG meetings

– July 13, 2009 – July 28, 2009 – August 11, 2009 – April 21, 2010

  • Traffic Operations and Safety
  • Drainage
  • Alternative Modes of Transportation
  • Potential RR Grade Separation
slide-6
SLIDE 6

I DOT Ro adway De sig n Crite ria

  • Suburban Strategic Regional Arterial (SRA)
  • Design Speed - 45 mph
  • Lane Widths – 12’
  • Raised Curb Median Width – 18’
  • Flush Median Width – 12’
  • Outside Concrete Curb and Gutter
  • Sidewalk Width – 5’ with 2’ Minimum Behind Back
  • f Curb
slide-7
SLIDE 7

Cro ss Se c tio nal E le me nts

  • Continuous Sidewalk on One Side of the Roadway
  • Continuous 10’ Flat Area Provided on Each Side
  • f the Roadway – Allows for Future Sidewalk or

Multi-Use Path

slide-8
SLIDE 8

Me e ting Purpo se

To Present and Obtain Group Feedback on Design Alternatives Developed to Date

  • Alternative 1
  • 18’ Raised Curb Median
  • 2-12’ Lanes in Each Direction
  • Alternative 2
  • 12’ Flush Median
  • 2-12’ Lanes in Each Direction
  • Alternative 3 - Hybrid of Alt. 1 and Alt. 2
  • 18’ Raised Curb Median
  • 2-12’ Lanes in Each Direction
  • Flush Median / Two-Way Left Turn Lane between Circle

Drive and Railroad Crossing

slide-9
SLIDE 9

Alte rnative 1 T ypic al Cro ss Se c tio n

  • 18’ Raised Curb Median
  • 2–12’ Lanes in Each Direction with Curb and Gutter
  • 5’ Wide Sidewalk and 10’ Flat Area

Southbound Northbound

slide-10
SLIDE 10

Alte rnative 2 T ypic al Cro ss Se c tio n

Southbound Northbound

  • 12’ Flush Median
  • 2–12’ Lanes in Each Direction with Curb and Gutter
  • 5’ Wide Sidewalk and 10’ Flat Area
slide-11
SLIDE 11

Alte rnative 3 T ypic al Cro ss Se c tio n

  • Hybrid of Alternatives 1 and 2
  • Typical Section between Circle Drive and RR Crossing
  • Two Way Left Turn Lane

Southbound Northbound

slide-12
SLIDE 12

I nte rse c tio n I mpro ve me nts Diamo nd L ake Rd

AM (PM)

  • Diamond Lake Road

– Left Turn Lanes – Left Turn Signals – NB Dual-Right Turn Lanes

  • IL Route 60/83

– Longer Turn Bays – Upgrade Traffic Signals

slide-13
SLIDE 13

I nte rse c tio n I mpro ve me nts T

  • wnline Rd

AM (PM)

  • IL Route 60/83

– Modify Southbound Lane Configuration – Modify Traffic Signal Operation / Timing – Upgrade Traffic Signals

slide-14
SLIDE 14

I DOT and Railro ad Cle aranc e Re quire me nts

  • IDOT Roadway under a Railroad:

Required Vertical Clearance is 14’-9”

  • IDOT Roadway over a Railroad:

Required Vertical Clearance is 23’-0”

slide-15
SLIDE 15

Ne xt Ste ps

  • Give Consideration to Findings from Meeting No. 4 and

Meeting No. 5

  • Refine Alternatives Accordingly
  • Present Refined Alternatives to Community Advisory

Group – Summer 2010 Tentative

  • Obtain Consensus on Preferred Alternative
  • Present Preferred Alternative to Public – Fall 2010

Tentative

  • Project Website: www.ilrte6083study.com

www.ilrte6083study.com