I L ROUT E 60/ 83 Co mmunity Adviso ry Gro up Me e ting No . 6 - - PowerPoint PPT Presentation

I L ROUT E 60/ 83 Co mmunity Adviso ry Gro up Me e ting No . 6 Ja nua ry 25, 2011 Outline Ag e nda Introduction of Participants Recap of Community Advisory Group Meetings 4 and 5 April 21, 2010 April 28, 2010


slide-1
SLIDE 1

I L ROUT E 60/ 83

Co mmunity Adviso ry Gro up Me e ting No . 6

Ja nua ry 25, 2011

slide-2
SLIDE 2

Outline Ag e nda

  • Introduction of Participants
  • Recap of Community Advisory Group Meetings 4 and 5

– April 21, 2010 – April 28, 2010

  • Revised IDOT Design Criteria (End of 2010)

– Complete Streets Law (June 2010) – Cost Participation Required by Local Agency

  • Cross Sectional Design Elements
  • Proposed Roadway Improvements

– Potential Sidewalks – Potential Shared-Use Path

  • Next Steps
slide-3
SLIDE 3

Who Are We ?

Introductions

slide-4
SLIDE 4

Re c a p o f Pre vio us Co mmunity Adviso ry Gro up Me e ting s

  • Five Previous Meetings

– July 13, 2009 – July 28, 2009 – August 11, 2009 – April 21, 2010 – April 28, 2010

  • Traffic Operations and Safety
  • Drainage
  • Alternative Modes of Transportation
  • Potential RR Grade Separation
slide-5
SLIDE 5

Why Off-Stre e t Sha re d-Use Pa th?

  • Bicycle and Pedestrian Accommodations
  • Criteria
  • Safety

Safety is of the utmost priority for peds/bikes

  • High Traffic Volumes (Design Year ADT > 15,000)
  • High Speed Urban Roadway (Speed > 35 mph)
  • Recommended Accommodation
  • Off-Street Side Path
  • Requires Local Agency Agreement and Cost

Participation

slide-6
SLIDE 6

Why Off-Stre e t Sha re d-Use Pa th?

  • Supports IL Route 60/83 Problem Statement

(Aug. 2009)

  • Safety Deficiencies
  • Operational Deficiencies/Congestion
  • Supports goals including safety, mobility and

access while accommodating bicyclists and pedestrians

slide-7
SLIDE 7

Cro ss Se c tio na l E le me nts

  • Potential 5’ Wide Sidewalk on Northbound Side of the

Roadway

  • 2’ Minimum Buffer Requirement from Back of Curb
  • Continuous 17’ Wide Flat Area Provided on

Southbound Side of the Roadway

  • Allows for 10’ Wide Potential Shared-Use Path
  • 5’ Minimum Buffer Requirement from Back of Curb
  • 2’ Buffer Requirement on Outside Edge of Path
slide-8
SLIDE 8

17’ Wide F la t Are a fo r Po te ntia l Sha re d-Use Pa th

5 5’ ’ Buffer Area Buffer Area Min 2’ Buffer 10’ Path Vehicle Travel Lanes Vehicle Travel Lanes Minimum Minimum

slide-9
SLIDE 9

Me e ting Purpo se

To Present and Obtain Group Feedback on Proposed Improvement Plan Refined to Date

  • Two 12’ Lanes in Each Direction with Curb and Gutter
  • 18’ Raised Curb Median from IL Route 176 to Circle Dr.

and Maple Avenue to Diamond Lake Road

  • Two Way Left Turn Lane from Circle Drive to Maple Ave.
  • Potential 5’ Wide Sidewalk on Northbound Side
  • Grading to Accommodate 10’ Wide Potential Shared-Use

Path on Southbound Side

slide-10
SLIDE 10

T ypic a l Cro ss Se c tio n –

  • 18

18’ ’ Raised Curb Median Raised Curb Median

  • 2

2– –12 12’ ’ Lanes in Each Direction with Curb and Gutter Lanes in Each Direction with Curb and Gutter

  • 5

5’ ’ Wide Potential Sidewalk Wide Potential Sidewalk (Along Northbound Side)

(Along Northbound Side)

  • 17

17’ ’ Flat Area for Potential Shared Flat Area for Potential Shared-

  • Use Path

Use Path (Along Southbound Side)

(Along Southbound Side) Southbound Northbound

Ma ple Ave nue to Dia mo nd L a ke Rd

IL Route 176 to Circle Drive

slide-11
SLIDE 11

T ypic a l Cro ss Se c tio n – Circ le Drive to Ma ple Ave nue

  • 12

12’ ’ Two Way Left Turn Lane Two Way Left Turn Lane

  • 2

2– –12 12’ ’ Lanes in Each Direction with Curb and Gutter Lanes in Each Direction with Curb and Gutter

  • 5

5’ ’ Wide Potential Sidewalk Wide Potential Sidewalk (Along Northbound Side)

(Along Northbound Side)

  • 17

17’ ’ Flat Area for Potential Shared Flat Area for Potential Shared-

  • Use Path

Use Path (Along Southbound Side)

(Along Southbound Side) Southbound Northbound

slide-12
SLIDE 12

Ne xt Ste ps

  • Give Consideration to Findings from Meeting No. 6
  • Refine Design Accordingly
  • Prepare More Detailed Studies on Railroad Grade

Separation Options – Initiated by Village of Mundelein

  • 2040 Traffic Projections Now Available
  • Community Advisory Group Meeting No. 7
  • Present Alternatives to Public – Summer 2011 (Target)
  • Project Website:: www.ilrte6083study.com