I-69 SYSTEM (I-369) HARRISON COUNTY/MARSHALL ROUTE STUDY Texas - PowerPoint PPT Presentation

I-69 SYSTEM (I-369) HARRISON COUNTY/MARSHALL ROUTE STUDY Texas Transportation Commission December 18, 2014 I-69 System (I-369) Harrison County/Marshall Route Study December 18, 2014 Route Study Overview Identified as an I-69 Segment


  1. I-69 SYSTEM (I-369) HARRISON COUNTY/MARSHALL ROUTE STUDY Texas Transportation Commission December 18, 2014 I-69 System (I-369) Harrison County/Marshall Route Study December 18, 2014

  2. Route Study Overview  Identified as an I-69 Segment Committee priority  Existing US 59 through Marshall does not currently meet Interstate standards  The Route Study is to determine an Interstate route option for advancing I-369 in Marshall area  Working group led grass roots public outreach process to: – Establish goals for I-369 – Provide guidance on route option locations – Conduct public outreach – Provide recommendation on option to carry forward Study Area I-69 System (I-369) Harrison County/Marshall Route Study December 18, 2014 2

  3. Working Group Goals and Route Locations Working group goals for establishing I-369  Traffic and Safety – Serve high traffic and truck volumes – Serve expected traffic growth – Address safety concerns – Improve travel times  Connectivity – Provide for multi-modal connections – Provide connection and access to major transportation facilities  Community Impacts – Maximize the use of the existing US 59 footprint to the greatest extent possible while seeking to reduce program costs and impacts to private property – Incorporate public input – Support local economic development plans and goals (retail, industrial, Potential Interstate and commercial) by providing access and connectivity to the regional Route Options roadway network I-69 System (I-369) Harrison County/Marshall Route Study December 18, 2014 3

  4. Route Option Evaluation and Preliminary Recommendation  13 potential route options prescreened on how they addressed goals – Factors used: traffic diversion, costs, potential residential and commercial displacements, and community features impacts – Three options performed best  Further evaluation of the three options revealed they had similar impacts and performance  Working group issues – Concerns over traffic conflicts on shared use I-20 option – Concerns with cost to extend utilities to serve areas along the far southeast option Three Best Performing Options and Preliminary – Preliminary recommendation was E-4s:E-4n:E-1 Recommendation I-69 System (I-369) Harrison County/Marshall Route Study December 18, 2014 4

  5. Route Option Evaluation and Preliminary Recommendation  13 potential route options prescreened on how they addressed goals – Factors used: traffic diversion, costs, potential residential and commercial displacements, and community features impacts – Three options performed best  Further evaluation of the three options revealed they had similar impacts and performance  Working group issues – Concerns over traffic conflicts on shared use I-20 option – Concerns with cost to extend utilities to serve areas along the far southeast option Three Best Performing Options and Preliminary – Preliminary recommendation was E-4s:E-4n:E-1 Recommendation I-69 System (I-369) Harrison County/Marshall Route Study December 18, 2014 5

  6. Public Outreach Activities and Results Robust public outreach process led by  1400 Citizens reached directly Working Group  11 Formal presentations 2 On-going displays  ― One-on-one meetings with citizens  269 Attended open house ― PowerPoint presentations at local civic  105 Survey participants group and government meetings  122 Written comments ― Distributing printed materials ― Online survey ― Webpage ― On-going displays at public facilities  70% of survey participants “strongly ― Posts on social media outlets agreed” or “agreed” with Working Groups recommendation. ― Hyperlinks on webpages ― Public open house I-69 System (I-369) Harrison County/Marshall Route Study December 18, 2014 6

  7. Working Group Final Recommendation and Next Steps  Working Group reached consensus on the final recommended route option to the east.  Environmental studies should consider: – Further study of northern and southern tie points – Further study moving east  Next steps – Identify funding sources – Complete the environmental and schematic design process including further refinements Interstate Route Option Final Recommendation I-69 System (I-369) Harrison County/Marshall Route Study December 18, 2014 7

  8. Questions? I-69 System (I-369) Harrison County/Marshall Route Study December 18, 2014 8

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.