Scotland Route Study Working Group 9a 4-Sep-17 / 1 Scotland - - PowerPoint PPT Presentation

scotland route study
SMART_READER_LITE
LIVE PREVIEW

Scotland Route Study Working Group 9a 4-Sep-17 / 1 Scotland - - PowerPoint PPT Presentation

Scotland Route Study Scotland Route Study Working Group 9a 4-Sep-17 / 1 Scotland Route Study Agenda 1. Welcome and Introductions 2. Summary of feedback received on the Draft for Consultation 3. Further timetable development


slide-1
SLIDE 1

/

Scotland Route Study

Working Group 9a

Scotland Route Study 4-Sep-17 1

slide-2
SLIDE 2

/

Agenda

Scotland Route Study

  • 1. Welcome and Introductions
  • 2. Summary of feedback received on the Draft for Consultation
  • 3. Further timetable development undertaken/planned
  • 4. Further technical development undertaken/planned
  • 5. Further demand forecasting undertaken/planned
  • 6. Next steps
  • 7. AOB

2 4-Sep-17

slide-3
SLIDE 3

/

Summary of feedback received on the Draft for Consultation

4-Sep-17 Scotland Route Study 3

slide-4
SLIDE 4
slide-5
SLIDE 5

/

Summary of feedback received to date

Scotland Route Study

  • Graeme Dey (MSP Angus South) – Montrose/Usan
  • Public Hire Taxi Trade – integration of taxis to stations
  • Levenmouth Rail Campaign
  • Margaret McCulloch – electrification and enhancement of East Kilbride line
  • The Glenrothes Area Futures Group – many and varied
  • CLEAR (Community-Led Environmental Action for Regeneration) – Levenmouth
  • Arbroath FC Supporters – Levenmouth
  • North Ayrshire Council – supportive (small parcel deliveries and electrification

proposals)

  • Frank McAveety (Councillor) and Glasgow Airport Access Project – expressing

disappointment that GAAP is not included in the Route Study (press article)

  • Friends of the Far North – reasonably supportive
  • Strathallan CRP – reasonably supportive and new Blackford station
  • East Lothian CRP – reasonable supportive

4-Sep-17 5

slide-6
SLIDE 6

/

Summary of feedback received to date

Scotland Route Study

  • Met with all RTP’s (except SPT)
  • SEStran – new railway/STAG/LDMS/forecasts/Fife Bypass
  • Tactran – alleged bias against Perth and Dundee in forecasts
  • HITRANS – rolling stock/far north
  • Nestrans – Electrification roll out, City Deal +
  • Met with MP’s in Westminster
  • Met with MSP’s in Holyrood
  • Presentation to SCDI
  • Meetings planned with East Lothian Council and Perth & Kinross

Council

4-Sep-17 6

slide-7
SLIDE 7
slide-8
SLIDE 8

/

Further timetable development undertaken/planned

4-Sep-17 Scotland Route Study 8

slide-9
SLIDE 9

/

Further timetable development undertaken/planned

Scotland Route Study

  • Edinburgh Waverley – train lengthening instead of increasing frequency
  • Glasgow Central – train lengthening instead of increasing frequency
  • ECML – additional infrastructure and freight scenario
  • WCML – additional infrastructure, HS2 splitting/joining and freight scenario
  • East Kilbride – electrification and enhancement
  • Barrhead/Kilmarnock/Barassie - electrification and enhancement
  • Far North – conventional signalling and additional infrastructure
  • Central Belt to Aberdeen/Inverness - electrification and enhancement
  • Aberdeen to Inverness - enhancement

4-Sep-17 9

slide-10
SLIDE 10

/

Further technical development undertaken/planned

4-Sep-17 Scotland Route Study 10

slide-11
SLIDE 11

/

Further technical development undertaken/planned

Scotland Route Study

  • GRIP 3 development ongoing on Carstairs Junction remodel
  • GRIP 2 development nearing completion for Portobello Junction

remodel

  • GRIP 3 development ongoing on Slateford Junction remodel
  • GRIP 3 (inc AIP) development work about to commence for

electrification of Edinburgh Suburban line

  • Initial Perth “masterplan” meeting held
  • Dunblane to Perth enhancement
  • Dunblane to Perth electrification
  • Perth Station and infrastructure remodel
  • Millerhill “masterplan” meeting held

4-Sep-17 11

slide-12
SLIDE 12

/

Further demand forecasting undertaken/planned

4-Sep-17 Scotland Route Study 12

slide-13
SLIDE 13
slide-14
SLIDE 14
slide-15
SLIDE 15
slide-16
SLIDE 16
slide-17
SLIDE 17

/

Next steps

4-Sep-17 Scotland Route Study 17

slide-18
SLIDE 18

/

Next steps

Scotland Route Study

  • Consultation period closes 10th March
  • Working Group 10: 13th April (Progress and emerging issues)
  • Board Meeting 5: 14th April (Progress and emerging issues)
  • Working Group 11: 16th June (Presentation of final document)
  • Regional Working Group 6: May/June
  • Board Meeting 6: 30th June (Seek approval to publish)
  • Publish final document: 14th July