Florida Department of Transportation Harborview Road PD&E Study District One and from Melbourne Street to I-75 Charlotte County FPN: 434965-1-22-01 Charlotte County-Punta Gorda MPO Meeting May 7, 2018 Introduction Steven A. Andrews


slide-1
SLIDE 1

Charlotte County-Punta Gorda MPO Meeting May 7, 2018

Harborview Road PD&E Study

from Melbourne Street to I-75

FPN: 434965-1-22-01

Florida Department of Transportation District One and Charlotte County

slide-2
SLIDE 2

Charlotte County-Punta Gorda MPO Meeting May 7, 2018

Introduction

  • Steven A. Andrews

FDOT Project Manager Steven.Andrews@dot.state.fl.us (863) 519-2270

2

slide-3
SLIDE 3

Charlotte County-Punta Gorda MPO Meeting May 7, 2018

Project Limits

3

slide-4
SLIDE 4

Charlotte County-Punta Gorda MPO Meeting May 7, 2018

Project Background

  • Purpose of the Project Development and Environment (PD&E) Study

▪ Evaluate and document engineering and environmental effects of widening Harborview Road

  • Need for improvements

▪ Accommodate increased traffic demand, including truck traffic, generated by projected growth in Charlotte County ▪ Improve connectivity between US 41 and I-75 ▪ Enhance safety along the project corridor ▪ Improve emergency evacuation

4

slide-5
SLIDE 5

Charlotte County-Punta Gorda MPO Meeting May 7, 2018

Project Funding

  • The Charlotte County-Punta Gorda

Metropolitan Planning Organization (MPO) identifies this project in their 2040 Long Range Transportation Plan (LRTP) Cost Feasible Plan.

  • FDOT’s Five-Year Tentative Work Program

▪ Design phase funded in 2020 ▪ Right-of-way acquisition funded in 2023 ▪ Construction not currently funded

5

slide-6
SLIDE 6

Charlotte County-Punta Gorda MPO Meeting May 7, 2018

Existing Typical Section

6 Five-Lane Typical Section Four-Lane Typical Section

slide-7
SLIDE 7

Charlotte County-Punta Gorda MPO Meeting May 7, 2018

Build Alternatives

  • Construct four new lanes (existing pavement not saved)
  • Buffered bicycle lanes and sidewalk on both sides of the road

7

slide-8
SLIDE 8

Charlotte County-Punta Gorda MPO Meeting May 7, 2018

Build Alternatives

  • Construct four new lanes (existing pavement not saved)
  • Buffered bicycle lanes and sidewalk on both sides of the road
  • Roundabouts at Melbourne Street and MPO Entrance

8 Roundabout Roundabout

slide-9
SLIDE 9

Charlotte County-Punta Gorda MPO Meeting May 7, 2018

Northern Alternative

  • New alignment shifts north of existing road

9

slide-10
SLIDE 10

Charlotte County-Punta Gorda MPO Meeting May 7, 2018

Southern Alternative

10

  • New alignment shifts south of existing road
slide-11
SLIDE 11

Charlotte County-Punta Gorda MPO Meeting May 7, 2018

Optimized Alternative

11

  • New alignment shifts both north and south of existing road to minimize

relocations

slide-12
SLIDE 12

Charlotte County-Punta Gorda MPO Meeting May 7, 2018

No-Build Alternative

  • Assumes Harborview Road will remain a two-lane roadway through year

2045 with only routine maintenance

12

Advantages

  • No additional right-of-way
  • No design, right-of-way, or

construction cost

  • No delays to motorists or

inconveniences to property

  • wners during construction

Disadvantages

  • Increased potential for crashes
  • Increased traffic congestion

and user costs

  • Increased emergency vehicle

response times

slide-13
SLIDE 13

Charlotte County-Punta Gorda MPO Meeting May 7, 2018

Environmental Evaluation

13

slide-14
SLIDE 14

Charlotte County-Punta Gorda MPO Meeting May 7, 2018

Right-of-Way and Cost

14

slide-15
SLIDE 15

Charlotte County-Punta Gorda MPO Meeting May 7, 2018

Public Information Workshop

  • Thursday, March 29, 2018

▪ 4 p.m. to 6 p.m.

  • Charlotte County-Punta Gorda MPO

▪ Meeting Rooms A and B ▪ 25550 Harborview Road ▪ Port Charlotte

  • Open House Format

▪ 134 citizens attended ▪ 74 comments received

15

slide-16
SLIDE 16

Charlotte County-Punta Gorda MPO Meeting May 7, 2018

Public Information Workshop

  • Open House Format

▪ 134 citizens attended ▪ 74 comments received

  • Public comments/suggestions included

▪ 16 – Optimized Alternative identified ▪ 9 – Northern Alternative identified ▪ 4 – Southern Alternative identified ▪ 3 – No-Build Alternative identified ▪ 11 – Removing raised median and utilize 5-lane typical section ▪ 11 – No roundabouts ▪ 9 – No eastbound right-turn lane into Rolls Landing entrance ▪ 8 – Will noise walls be needed ▪ 8 – Sunseeker Resort traffic

16

slide-17
SLIDE 17

Charlotte County-Punta Gorda MPO Meeting May 7, 2018

TAC and CAC Meetings

  • Charlotte County-Punta Gorda MPO

▪ Meeting Room A ▪ 25550 Harborview Road ▪ Port Charlotte

  • Wednesday, April 18, 2018

▪ Technical Advisory Committee (TAC) meeting at 9:30 a.m. ▪ Citizens Advisory Committee (CAC) meeting at 1:30 p.m.

17

slide-18
SLIDE 18

Charlotte County-Punta Gorda MPO Meeting May 7, 2018

Study Schedule

18

slide-19
SLIDE 19

Charlotte County-Punta Gorda MPO Meeting May 7, 2018

Contact Us

  • Website:

http://www.swflroads.com/harborview/melbournesttoi75

  • Email:

Steven.Andrews@dot.state.fl.us

  • Mail:

Steven A. Andrews, Project Manager Florida Department of Transportation P.O. Box 1249 Bartow, FL 33831

  • Phone:

(863) 519-2270

19