SAWMI LL ROAD / BRI GHT ROAD CORRI DOR STUDY PROJECT OVERVIEW - - PowerPoint PPT Presentation

sawmi ll road bri ght road corri dor study
SMART_READER_LITE
LIVE PREVIEW

SAWMI LL ROAD / BRI GHT ROAD CORRI DOR STUDY PROJECT OVERVIEW - - PowerPoint PPT Presentation

SAWMI LL ROAD / BRI GHT ROAD CORRI DOR STUDY PROJECT OVERVIEW NOVEMBER 29, 2016 AGENDA Sawmill Road/Bright Road Corridor Study Project background Next steps Preliminary ideas Additional Bright Road Projects Cul-de-sac


slide-1
SLIDE 1

SAWMI LL ROAD / BRI GHT ROAD CORRI DOR STUDY

PROJECT OVERVIEW

NOVEMBER 29, 2016

slide-2
SLIDE 2

Sawmill Road/Bright Road Corridor Study

  • Project background
  • Next steps
  • Preliminary ideas

Additional Bright Road Projects

  • Cul-de-sac construction
  • Waterline and sanitary sewer construction

AGENDA

slide-3
SLIDE 3

The study is intended to address congestion and safety issues within the Sawmill Road/Bright Road corridor:

  • Determine the number of through lanes needed along Sawmill

Road

  • Investigate intersection improvements
  • Study roadway improvements to Bright Road

PROJECT BACKGROUND

slide-4
SLIDE 4

Study Area

  • Sawmill Road
  • SR 161 to Hard Road
  • Bright Road
  • Emerald Parkway to Sawmill

Road

  • Snouffer Road
  • Sawmill Road to Caine Road

PROJECT BACKGROUND

slide-5
SLIDE 5

NEXT STEPS

  • Continue public

information and participation

  • Develop design year

traffic

  • Determine the

appropriate number of lanes on Sawmill Road and Bright Road

  • Develop conceptual alternatives

for intersection improvements

  • Sawmill/SR 161
  • Sawmill/Banker/Sawmill Place
  • Sawmill/Federated/Village Pkwy
  • Sawmill/Snouffer
  • Snouffer/Caine
  • Sawmill/Dublin Center
  • Sawmill/Billingsley
  • Sawmill/Bright/Sawbury
  • Sawmill/Hard
slide-6
SLIDE 6

BRI GHT ROAD PRELI MI NARY I DEAS

slide-7
SLIDE 7

BRI GHT ROAD PRELI MI NARY I DEAS

slide-8
SLIDE 8

BRI GHT ROAD PRELI MI NARY I DEAS

slide-9
SLIDE 9

BRI GHT ROAD PRELI MI NARY I DEAS

slide-10
SLIDE 10

We request that you provide us your input. This will allow us to address issues during the study. You can contact the Project Team the following ways:

  • The comment forms provided here
  • Contacting the City of Dublin:

Jean-Ellen Willis, Engineering Manager - Transportation 5800 Shier Rings Road Dublin, Ohio 43016 614.410.4633 jwillis@dublin.oh.us

CONTACT I NFORMATI ON

slide-11
SLIDE 11

BRI GHT ROAD CUL-DE-SAC

F

slide-12
SLIDE 12

Gateway - Location

Views from the Path View for the Driver

slide-13
SLIDE 13

Gateway - Landscape

Layered Landscapes Seasonal Plant Selection

slide-14
SLIDE 14

Gateway - Feature Elements

Pillars Decorative Iron Fence Layered Landscapes Seasonal Plant Selection

slide-15
SLIDE 15

Sanitary Sewer and Water Extensions – Bright Road area

F

Area 4B

  • Engineering Design -

2017

  • Construction – 2018
  • Bright Road from

Riverside Drive to Grande Cliffs Subdivision

slide-16
SLIDE 16

Sanitary Sewer & Water Extensions – Bright Road area

Madbeth Dr

F

Area 4C

  • Engineering Design -

2017

  • Construction – 2018
  • Grandee Cliffs Drive from

Jenmar Court to Bright Road

  • Bright Road from

MacBeth Drive to Grande Cliffs Subdivision

slide-17
SLIDE 17

Sanitary Sewer and Water Extensions – Bright Road area

F

Area 4A

  • Engineering Design -

2018

  • Construction – 2019
  • Riverside Drive – Emerald

Parkway to Hard Road

slide-18
SLIDE 18

Sanitary Sewer and Water Extensions – Bright Road area

F

Area 4D

  • Engineering Design -

2029

  • Construction – 2030
  • Development

potential

  • Bright Road –

Emerald Parkway to Sawmill Road