REVISED 1/4/2018 E le c tric Utility a nd Wa te r Utility 5- Ye a r Ra te Proposa l 2018 2022 City Counc il Boa rd of Public Utilitie s January 18, 2018 1 Rive rside Public Utilitie s.c om Outline 1. Staff Presentation a.


slide-1
SLIDE 1

1/4/2018 1

Rive rside Public Utilitie s.c om

1

E le c tric Utility a nd Wa te r Utility 5- Ye a r Ra te Proposa l 2018 – 2022

City Counc il Boa rd of Public Utilitie s

January 18, 2018

Rive rside Public Utilitie s.c om

2

Outline

  • 1. Staff Presentation
  • a. Background
  • b. Responses to Council Questions
  • c. Modified Option 1 Rate Proposal
  • d. Next Steps
  • 2. Supplemental Information
  • a. Customer Impacts
  • b. Alternatives and Risks
  • c. Tiered and Seasonal Water Rates

REVISED

slide-2
SLIDE 2

1/4/2018 2

Rive rside Public Utilitie s.c om

3

Background

Utility 2.0 Strategic Planning Process, Financial Planning, Rate Recommendations

Rive rside Public Utilitie s.c om

4

Customer Service

Provide world‐class customer‐centered service in every encounter, every day.

Reliability & Resiliency

Renew, replace, upgrade, modernize and extend the water and electric system infrastructure to ensure reliability is maintained or improved and that resilience to extreme events is maintained or improved.

Affordability

Keep water and electricity rates affordable and comply with Fiscal Policy.

Sustainability

Meet all city goals and state and federal compliance targets related to efficient use of water and electricity, renewable resources, and greenhouse gas emissions.

Operational Excellence

Instill, maintain and grow a culture of learning, innovation and continuous improvement in all internal processes achieving excellence in all our operations.

Strong Workforce

Attract, retain, train, educate and promote employees ensuring that a high level of employee performance, productivity and engagement is achieved.

UTILITY 2.0 STRATEGIC GOALS

REVISED

slide-3
SLIDE 3

1/4/2018 3

Rive rside Public Utilitie s.c om

5

Utility 2.0 – Pla nning F

  • r Our F

uture

10-Ye ar I nfrastruc ture Plan

W a te r- En e rg y - Life

Rive rside Public Utilitie s.c om

6

  • 1. Strategic Planning (2015)
  • a. Four Board Special Meetings
  • b. Two Council/Board Workshops
  • c. One Council Workshop (Finance)
  • 2. Option 3 Conceptual Approval
  • a. 10‐Year infrastructure, technology

and workforce requirements

  • b. Authorization to conduct financial

planning, determine revenue needs

Utility 2.0

REVISED

slide-4
SLIDE 4

1/4/2018 4

Rive rside Public Utilitie s.c om

7

1. Financial Planning (2016)

  • a. 10‐Year Financial Pro Formas
  • b. Cost of Service and Rate Design Studies

2. Strategic Plan (2017) 3. Rate Setting Process (2017‐2018)

  • a. Presentation to Board (August) and City Council (September)
  • b. Community Outreach (October‐November)

i. 55 community presentations/meetings ii. Special low‐income and agricultural customer outreach

  • c. Two Joint City Council and Board Workshops

(November, January)

Utility 2.0 (c ontinue d)

Rive rside Public Utilitie s.c om

8

Boa rd, Counc il & Community F e e dba c k

Avoid “Stair‐ Step” Increases Protect Low & Fixed Income Protect Ag . Water Rate Increases Too High Council Questions

Rate Proposal Lowered: Electric: 4.8%  3.0% Water: 8.6%  5.7%

Freeze Rates for 1 year Citizen Task Force to study Expanded support level Expanded eligibility New water bill support

?

Regular review & oversight Rate forecasts

 ?

40 questions submitted REVISED

slide-5
SLIDE 5

1/4/2018 5

Rive rside Public Utilitie s.c om

9

  • 1. Board & Council Conceptually Approved
  • a. Annual Financial & Rate Forecasts
  • b. Expanded Low‐Income and Fixed Income Assistance
  • 2. Council Conceptually Approved, without Board Recommendation
  • a. Agricultural Rates Task Force, with Frozen Agricultural Rates (1‐year)
  • 3. Board Recommended, Council Declined to Conceptually Approve
  • a. Revised Rate Proposal
  • 4. Further Direction from Council
  • a. Submission of Questions regarding Revised Rate Proposal
  • b. Additional Joint Workshop in January

Outc ome s of Nove mbe r 28 Wor kshop

Rive rside Public Utilitie s.c om

10

  • 1. Each December, starting in 2019, Board and Council to receive:
  • a. Annual update on spending
  • b. Five‐year rate preview/forecast for years 2023‐2027 to avoid future

“stair step” rate increases

  • 2. City Council may reopen current rate plan by majority vote

(Council‐directed change from supermajority with Mayor’s consent)

  • 3. By the end of 2021, as part of Fiscal Year 2022‐24 Two‐Year

Budget, a new 5‐year rate package to be presented by Board to City Council for consideration starting in July 2023

  • 4. Future rate review process, even if de minimis

Annua l F ina nc ia l & Ra te F

  • re c a sts

REVISED

slide-6
SLIDE 6

1/4/2018 6

Rive rside Public Utilitie s.c om

11

  • 1. SHARE and ESAP program enhancements
  • 2. Comprehensive outreach campaign
  • 3. Needs assessment
  • 4. Increase program assistance in parallel with rate increases

(Council‐directed addition to proposal)

L

  • w- Inc ome a nd F

ixe d Inc ome Assista nc e

Rive rside Public Utilitie s.c om

12

  • 1. Board‐appointed
  • 2. One‐year appointment

(Council‐directed change from two‐year appointment)

  • 3. Subject to Brown Act

(Council‐directed addition to proposal)

  • 4. Quarterly updates to Council
  • 5. WA‐3 & WA‐9 rate recommendation to Council by July 1, 2019
  • 6. Freezing current WA‐3 and WA‐9 rates until July 1, 2019

(Council‐directed change from system average rate increases)

Ag ric ultura l Wa te r Ra te s T a skforc e

REVISED

slide-7
SLIDE 7

1/4/2018 7

Rive rside Public Utilitie s.c om

13

Responses to Council Questions

Responses to Questions from November 28, 2017 Workshop

Rive rside Public Utilitie s.c om

14

City Counc il Que stions

  • 1. 40 Questions/Comments Submitted by Six Council Members
  • 2. Topics
  • a. Agriculture
  • b. Finance
  • c. General Fund Transfer
  • d. Infrastructure
  • e. Legal

f. Overtime

  • g. Presentation
  • h. Renewable Energy

i. Tiered and Seasonal Rates

REVISED

slide-8
SLIDE 8

1/4/2018 8

Rive rside Public Utilitie s.c om

15

City Counc il Que stions

  • 1. Attachment 1: Staff Responses to City Council Questions
  • a. Organized by Topic
  • b. Organized by Council Member
  • 2. Attachment 2: Tiered and Seasonal Water Rates
  • 3. Attachment 4: Electric Utility Rate Alternatives – Project Impacts
  • 4. Attachment 5: Water Utility Rate Alternatives – Project Impacts

Rive rside Public Utilitie s.c om

16

Modified Option 1 Rate Proposal

Utility 2.0 Modified Option 1 10‐Year Electric and Water Infrastructure Plans

REVISED

slide-9
SLIDE 9

1/4/2018 9

Rive rside Public Utilitie s.c om

17

E le c tric Ra te Proposa l – Wha t wa s re duc e d?

(F e we r pr

  • je c ts str

e tc he d ove r a longe r pe r iod of time – 37.5% de c r e ase in r ate pr

  • posal)

3.0%

Option 3 Proposal Modifie d Option 1 Proposal Powe r Supply Cost Re duc tion F Y 2016-17 Ye a r- E nd Re sults Re duc e and De lay Proje c ts Re duc e Cash Re se rve s to Be low Minimum

Rive rside Public Utilitie s.c om

18

Wa te r Ra te Proposa l – Wha t wa s re duc e d?

(F e we r pr

  • je c ts str

e tc he d ove r a longe r pe r iod of time – 34% de c r e ase in r ate pr

  • posal)

5.7%

Modifie d Option 1 Proposal Option 3 Proposal F Y 2016-17 Ye a r- E nd Re sults Re duc e and De lay Proje c ts Re duc e Cash Re se rve s to Be low Minimum

REVISED

slide-10
SLIDE 10

1/4/2018 10

Rive rside Public Utilitie s.c om

19

Re vise d Ra te Proposa l – Modifie d Option 1

Based on system average, rate increases vary by customer class and consumption levels.

Ye a rs 1- 5

(2018-2022)

Ye ar s 6- 10 Pr e vie w

(2023-2027)

E le c tric

July 2018 2.95%

E stimate d r ate r e quir e me nt Ave ra g e a nnua l 3.0%

July 2019 3.0% July 2020 3.0% July 2021 3.0% July 2022 3.0%

Wa te r

July 2018 4.50%

E stimate d r ate r e quir e me nt Ave ra g e a nnua l 6.5%

July 2019 5.75% July 2020 5.75% July 2021 5.75% July 2022 6.50%

Rive rside Public Utilitie s.c om

20 50% Re ne wa ble E ne rg y 1 Substa tion 7 T ra nsforme rs 6,000 3,080 Pole s De laye d City- wide Volta g e Conve rsions 77 62 Mile s of Unde rg round Ca ble

Imple me nting Propose d 10- Ye a r E le c tric Pla n

Modified Option 1: “The $5 $3 Plan”

4,750 1,270 Stre e tlig hts 320 262 Unde rg round Va ults

REVISED

slide-11
SLIDE 11

1/4/2018 11

Rive rside Public Utilitie s.c om

21

Utility 2.0 10- Ye ar E le c tr ic Plan

Project Category Option 3

Modified Option 1

Reduction ($) Reduction (%)

  • 1. Overhead Projects

$150,800,000

$89,208,000

‐$61,592,000

  • 41%
  • 2. Underground Projects

$154,423,000

$139,326,000

‐$15,097,000

  • 10%
  • 3. Substation Projects

$98,102,000

$88,100,000

‐$10,002,000

  • 10%
  • 4. System Automation

$108,300,000

$96,574,000

‐$11,726,000

  • 11%
  • 5. Recurring Projects

$118,866,000

$115,037,000

‐$3,829,000

  • 3%

Total: $630,491,000

$528,245,000

‐$102,246,000

  • 16%

Rate Increase: 4.8%

3.0%

Rive rside Public Utilitie s.c om

22

  • 1. Over

head P r

  • jects: $89,208,000 10-Year

I nvestment

  • 1,270 street light retrofits
  • 3,080 poles & related equipment
  • 600 overhead switches replaced
  • 12kV conversions in 6 years

REVISED

slide-12
SLIDE 12

1/4/2018 12

Rive rside Public Utilitie s.c om

23

  • 2. Under

gr

  • und P

r

  • jects: $139,326,000 10-Year

I nvestment

  • 62 miles of cable replacement
  • 262 vault replacements
  • 116 switch replacements

Rive rside Public Utilitie s.c om

24

  • 3. Substation P

r

  • jects: $88,100,000 10-Year

I nvestment

  • 7 transformer replacements
  • 5 switchgear replacements
  • 70 breaker replacements
  • 570 relay replacements

REVISED

slide-13
SLIDE 13

1/4/2018 13

Rive rside Public Utilitie s.c om

25

  • 4. System Automation: $96,574,000 10-Year

I nvestment

  • Citywide Streetlight LED Lamp

Replacement Program

  • Electric vehicle charging stations
  • Substation and distribution

system monitoring and control

Rive rside Public Utilitie s.c om

26

  • 5. R

ecur r ing P r

  • jects: $115,037,000 10-Year

I nvestment

Facilities needed to serve new customers and expanded load, including:

  • Services and meters for new

customers

  • Line extensions and rebuilds
  • Overhead to underground

conversions

REVISED

slide-14
SLIDE 14

1/4/2018 14

Rive rside Public Utilitie s.c om

27

  • 1. Overhead (‐$62M)
  • 2. Underground (‐$15M)
  • 3. Substations (‐$10M)
  • 4. Automation (‐$12M)
  • 5. Recurring (‐$4M)

3.0% E le c tric Ra te Inc re a se

Impact: Reduced reliability balanced with increased affordability. Most vital infrastructure replaced at a sustainable rate.

Reduces Electric Pole Replacements Reduces Underground Conduit/Vault Replacements Reduces Neighborhood Streetlight Retrofits Eliminates GIS Integration, Customer Engagement Portal, Interactive Voice Response System Eliminates New Arlanza Substation

(Modified Option 1)

Delays Advanced Metering Infrastructure Deployment

(Comm. & Industrial 1 year; Residential 2 years)

Rive rside Public Utilitie s.c om

28 I nc lude s Public Be ne fits Charge and Wate r Co nse rvatio n Surc harge

E stimate d Re side ntial 5 ye a r Ave ra g e Annua l Pric e Change L

  • w- Use

355 kWh T ypic al- Use 592 kWh High- Use 1400 kWh E le c tr ic

$2.00

(3% )

$3.10

(3% )

$7.10

(3% )

E stima te d Re side ntia l Ave ra g e Monthly Bill Inc re a se for E a c h of the Ne xt 5 Ye a rs

REVISED

slide-15
SLIDE 15

1/4/2018 15

Rive rside Public Utilitie s.c om

29 I nc lude s Public Be ne fits Charge and Wate r Co nse rvatio n Surc harge

E stimate d Comme r c ial 5 ye a r Ave ra g e Annua l Pric e Change Small 500 kWh Me dium 2400 kWh L ar ge 8000 kWh E le c tr ic

$2.30

(2% )

$10.80

(2% )

$25.60

(2% )

E stima te d Comme rc ia l Ave ra g e Monthly Bill Inc re a se for E a c h of the Ne xt 5 Ye a rs

Rive rside Public Utilitie s.c om

30

Imple me nting Propose d 10- Ye a r Wa te r Pla n

Re c yc le d Wa te r Storm Wa te r Ca pture North Wa te rma n T re a tme nt Pla nt 90 49 Mile s of Distribution Pipe line 3 Pre ssure Sta tions 5 We lls 3 1 Re c yc le d Wa te r 5 1 Storm Wa te r Ca pture

Modified Option 1: “The $5 $3 Plan”

5 3 T re a tme nt F ilte r Re pla c e me nts Re plac e T e c hite Pipe

REVISED

slide-16
SLIDE 16

1/4/2018 16

Rive rside Public Utilitie s.c om

31

Utility 2.0 10- Ye a r Wa te r Pla n

Project Category Option 3

Modified Option 1

Reduction ($) Reduction (%)

  • 1. Water Supply

$96,558,000

$10,791,000

‐$85,767,000 ‐89%

  • 2. Water Treatment

$19,748,000

$1,296,000

‐$18,452,000 ‐93%

  • 3. Well Projects

$28,777,000

$30,499,000

$1,722,000 6%

  • 4. Transmission Pipelines

$77,338,000

$65,823,000

‐$11,515,000 ‐15%

  • 5. Distribution Pipelines

$153,209,000

$117,790,000

‐$35,419,000 ‐23%

  • 6. Distribution Facilities

$18,802,000

$19,268,000

$466,000 2%

  • 7. Reservoir Projects

$3,977,000

$2,440,000

‐$1,537,000 ‐39%

  • 8. System Automation

$43,118,000

$39,209,000

‐$3,909,000 ‐9% Total: $441,527,000

$287,116,000

‐$154,411,000 ‐35% Rate Increase: 8.6%

5.7%

Rive rside Public Utilitie s.c om

32

  • 1. Wa te r Supply: $10,791,000 10- Ye a r Inve stme nt
  • Recycled Water Phase 1
  • 600 acre feet new yield
  • Seven Oaks Dam – Enhanced

recharge project

  • 1,000 acre feet new yield

REVISED

slide-17
SLIDE 17

1/4/2018 17

Rive rside Public Utilitie s.c om

33

  • 2. Wa te r T

re a tme nt: $1,296,000 10- Ye a r Inve stme nt

  • Partial replacement of

membrane filters at the John W. North Water Treatment Plant

Rive rside Public Utilitie s.c om

34

  • 3. We ll Proje c ts: $30,499,000 10- Ye a r

Inve stme nt

  • 3‐5 well rehabilitations annually
  • 5 new drinking water wells
  • 2 new irrigation wells

REVISED

slide-18
SLIDE 18

1/4/2018 18

Rive rside Public Utilitie s.c om

35

  • 4. T

r ansmission Pipelines: $65,823,000 10-Year I nvestment

  • Techite Pipeline Replacement
  • Industrial Booster Station

(Hunter Park) Pipeline

  • Park Avenue Pipeline

Rive rside Public Utilitie s.c om

36

  • 5. Distr

ibution P ipelines: $117,790,000 10-Year I nvestment

  • Neighborhood pipeline

replacements

  • averaging 4.9 miles per year
  • (170 year replacement cycle)

REVISED

slide-19
SLIDE 19

1/4/2018 19

Rive rside Public Utilitie s.c om

37

  • 6. Distr

ibution F acilities: $19,268,000 10-Year I nvestment

  • Canyon Crest pump station

replacement

  • Crest pump station replacement
  • Polk/Magnolia pressure control

station replacement

  • Replace/rebuild 4,500 meters

annually

Rive rside Public Utilitie s.c om

38

  • 7. Re se rvoir Proje c ts: $2,440,000 10- Ye a r Inve stme nt

Capitalized maintenance on water storage reservoirs to secure and protect water quality.

REVISED

slide-20
SLIDE 20

1/4/2018 20

Rive rside Public Utilitie s.c om

39

  • 8. System Automation: $39,209,000 10-Year

I nvestment

  • Automated metering

infrastructure

  • Production, treatment and

distribution system monitoring to improve security and efficiency

  • Operational Data Management

System to improve management control and efficiency

Rive rside Public Utilitie s.c om

40

  • 1. Supply (‐$86M)
  • 2. Treatment (‐$18M)
  • 3. Wells
  • 4. Transmission (‐$12M)
  • 5. Distribution (‐$35M)
  • 6. Reservoirs (‐$2M)
  • 7. Automation (‐$4M)

5.7% Wa te r Ra te Inc re a se

Impact: Reduced reliability balanced with increased affordability. Most vital infrastructure replaced at a sustainable rate.

Eliminates Supply Projects and Treatment Plant Eliminates Victoria Ave. Transmission Main Reduces JW North Filter Replacements Reduces Reservoir Maintenance Reduces Pipe Replacement Rate to 170 Years

(Modified Option 1)

Eliminates GIS Integrations, Customer Engagement Portal, Interactive Voice Response System Delays Advance Metering Infrastructure Deployment

(Comm. & Industrial 1 year; Residential 3 years)

REVISED

slide-21
SLIDE 21

1/4/2018 21

Rive rside Public Utilitie s.c om

41 I nc lude s Public Be ne fits Charge and Wate r Co nse rvatio n Surc harge

E stimate d Re side ntial 5 ye a r Ave ra g e Annua l Pric e Change L

  • w- Use

12 CCF T ypic al- Use 19 CCF High- Use 29 CCF Wate r

$3.20

(10% )

$3.50

(8% )

$4.80

(6% )

E stima te d Re side ntia l Ave ra g e Monthly Bill Inc re a se for E a c h of the Ne xt 5 Ye a rs

Rive rside Public Utilitie s.c om

42 I nc lude s Public Be ne fits Charge and Wate r Co nse rvatio n Surc harge

E stimate d Comme r c ial 5 ye a r Ave ra g e Annua l Pric e Change Small 10 CCF Me dium 37 CCF L ar ge 119 CCF Wate r

$3.40

(10% )

$5.90

(7% )

$17.40

(6% )

E stima te d Comme rc ia l Ave ra g e Monthly Bill Inc re a se for E a c h of the Ne xt 5 Ye a rs

REVISED

slide-22
SLIDE 22

1/4/2018 22

Rive rside Public Utilitie s.c om

43 I nc lude s Public Be ne fits Charge and Wate r Co nse rvatio n Surc harge

E stimate d Re side ntial 5 ye a r Ave ra g e Annua l Pric e Change L

  • w- Use

355 kWh 12 CCF T ypic al- Use 592 kWh 19 CCF High- Use 1400 kWh 29 CCF E le c tr ic

$2.00

(3% )

$3.10

(3% )

$7.10

(3% )

Wate r

$3.20

(10% )

$3.50

(8% )

$4.80

(6% )

Ave r a g e Combine d

$5.20

(6% )

$6.60

(5% )

$11.90

(4% )

E stima te d Re side ntia l Ave ra g e Monthly Bill Inc re a se for E a c h of the Ne xt 5 Ye a rs

Rive rside Public Utilitie s.c om

44 I nc lude s Public Be ne fits Charge and Wate r Co nse rvatio n Surc harge

E stimate d Comme r c ial 5 ye a r Ave ra g e Annua l Pric e Change Small 500 kWh 10 CCF Me dium 2400 kWh 37 CCF L ar ge 8000 kWh 119 CCF E le c tr ic

$2.30

(2% )

$10.80

(2% )

$25.60

(2% )

Wate r

$3.40

(10% )

$5.90

(7% )

$17.40

(6% )

Ave r a g e Combine d

$5.70

(4% )

$16.70

(3% )

$43.00

(3% )

E stima te d Comme rc ia l Ave ra g e Monthly Bill Inc re a se for E a c h of the Ne xt 5 Ye a rs

REVISED

slide-23
SLIDE 23

1/4/2018 23

Rive rside Public Utilitie s.c om

45

Why Modifie d Option 1?

  • 1. Minimum Investments in Electric/Water Infrastructure
  • a. Staff recommends Utility 2.0 Modified Option 1 as the lowest‐cost

10‐year infrastructure plan

  • b. Any less infrastructure investments will have a negative impact on

system reliability, resulting in significant costs to future ratepayers

  • 2. Minimum Financial Health of Utilities
  • a. Staff recommends Utility 2.0 Modified Option 1 to maintain reserves

at lowest levels allowed under Council‐approved policies

  • b. Any lower reserves will have a negative impact on bond ratings,

resulting in significant costs to future ratepayers

Rive rside Public Utilitie s.c om

46

Risks with Modifie d Option 1 Ra te Pla n

  • 1. Revised rate plan reduces resiliency and increases risk
  • 2. Replacement rates for poles and pipes declines and is not

sustainable

  • a. No anticipated immediate impacts
  • b. Long term replacement rate must be changed to meet expected life
  • f these assets
  • 3. More repairs moved to reactive and emergency basis –

longer service interruptions

  • 4. Infrastructure that leaves our community most vulnerable,

such as transmission lines and substations, are replaced at sustainable rate REVISED

slide-24
SLIDE 24

1/4/2018 24

Rive rside Public Utilitie s.c om

47

De c e mbe r 8, 2017

Rive rside Public Utilitie s.c om

48

Next Steps

Staff recommendations to advance the proposal

REVISED

slide-25
SLIDE 25

1/4/2018 25

Rive rside Public Utilitie s.c om

49

Ne xt Ste ps

Activity Date RPU/City Council Joint Workshop January 18, 2018 Update Rate Schedules Based on Revised Revenue Requirements and Effective Dates February 2018 Public Hearing before Board of Public Utilities May 14, 2018 City Council consideration of Rate Recommendations May 22, 2018 Rates Effective July 1, 2018

Rive rside Public Utilitie s.c om

50

Re vise d Ra te Proposa l – Modifie d Option 1

Based on system average, rate increases vary by customer class and consumption levels.

Ye a rs 1- 5

(2018-2022)

E le c tric

July 2018 2.95% July 2019 3.0% July 2020 3.0% July 2021 3.0% July 2022 3.0%

Wa te r

July 2018 4.50% July 2019 5.75% July 2020 5.75% July 2021 5.75% July 2022 6.50%

REVISED

slide-26
SLIDE 26

1/4/2018 26

Rive rside Public Utilitie s.c om

51

Re c omme nda tions

That the Board or Public Utilities and City Council: 1. Receive staff’s presentation with additional requested information regarding the electric and water utility five-year rate proposal 2018-2022; 2. Conceptually approve the electric and water utility five-year rate proposal 2018-2022 utilizing the Utility 2.0 Strategic Plan Modified Option 1 for electric and water utility infrastructure improvements over the next ten years, with rates approximately 35% lower than the original five-year rate proposal based on Option 3 infrastructure improvements; and 3. Direct staff to prepare all documents necessary for public noticing of the rate proposal, to update proposed rate schedules and fiscal policies to reflect changes due to the rate proposal, and to update any other documents necessary for the public hearing to be held before the Board of Public Utilities on May 14, 2018 and final rate recommendations to the City Council on May 22, 2018, with new rates effective July 1, 2018.

Supplemental Information

REVISED

slide-27
SLIDE 27

1/4/2018 27

Rive rside Public Utilitie s.c om

53

Customer Impacts

Rate proposal impacts on different types of customers and usage patterns

Rive rside Public Utilitie s.c om

54

T ypic a l Re side ntia l Custome r

Average Annual Monthly Bill Increase

Water:

$3.30 for 18 ccf

Electricity:

$2.90 for 575 kWh

Estimated

REVISED

slide-28
SLIDE 28

1/4/2018 28

Rive rside Public Utilitie s.c om

55

L

  • w Wa te r/ E

le c tric ity Use Re side ntia l Custome r

Average Annual Monthly Bill Increase

Water:

$2.80 for 6 ccf

Electricity:

$1.90 for 238 kWh

Estimated

Rive rside Public Utilitie s.c om

56

Hig h Wa te r/ E le c tric ity Use Re side ntia l Custome r

Average Annual Monthly Bill Increase

Water:

$6.90 for 44 ccf

Electricity:

$5.80 for 1,047 kWh

Estimated

REVISED

slide-29
SLIDE 29

1/4/2018 29

Rive rside Public Utilitie s.c om

57

Sma ll Ne ig hborhood Re sta ura nt

Average Annual Monthly Bill Increase

Water:

$5 for 45 ccf

Electricity:

$8 for 2,144 kWh

Estimated

Rive rside Public Utilitie s.c om

58

Mid- Size Re sta ura nt

Average Annual Monthly Bill Increase

Water:

$7 for 57 ccf

Electricity:

$26 for 8,140 kWh

Estimated

REVISED

slide-30
SLIDE 30

1/4/2018 30

Rive rside Public Utilitie s.c om

59

L a rg e Re sta ura nt

Average Annual Monthly Bill Increase

Water:

$17 for 238 ccf

Electricity:

$181 for 44,593 kWh

Estimated

Rive rside Public Utilitie s.c om

60

F ull Se r vic e Hote l

Average Annual Monthly Bill Increase

Water:

$57 for 1,309 ccf

Electricity:

$935 for 218,360 kWh

Estimated

REVISED

slide-31
SLIDE 31

1/4/2018 31

Rive rside Public Utilitie s.c om

61

Ma nufa c ture r

Average Annual Monthly Bill Increase

Water:

$97 for 4,019 ccf

Electricity:

$3,389 for 688,800 kWh

Estimated

Rive rside Public Utilitie s.c om

62

Wa re house / Distribution

Average Annual Monthly Bill Increase

Water:

$23 for 443 ccf

Electricity:

$934 for 200,975 kWh

Estimated

REVISED

slide-32
SLIDE 32

1/4/2018 32

Rive rside Public Utilitie s.c om

63

L a rg e Me dic a l

Average Annual Monthly Bill Increase

Water:

$125 for 2,576 ccf

Electricity:

$3,293 for 812,600 kWh

Estimated

Rive rside Public Utilitie s.c om

64

Sma ll Offic e

Average Annual Monthly Bill Increase

Water:

$3 for 7 ccf

Electricity:

$10 for 2,180 kWh

Estimated

REVISED

slide-33
SLIDE 33

1/4/2018 33

Rive rside Public Utilitie s.c om

65

L a rg e Offic e

Average Annual Monthly Bill Increase

Water:

$18 for 127 ccf

Electricity:

$155 for 35,880 kWh

Estimated

Rive rside Public Utilitie s.c om

66

L a rg e Re ta il

Average Annual Monthly Bill Increase

Water:

$29 for 292 ccf

Electricity:

$1,730 for 253,933 kWh

Estimated

REVISED

slide-34
SLIDE 34

1/4/2018 34

Rive rside Public Utilitie s.c om

67

Alternatives and Risks

Rate alternatives and associated risks For additional information, please see Attachments 4 and 5 to the staff report

Rive rside Public Utilitie s.c om

68

  • 1. Overhead (‐$62M)
  • 2. Underground (‐$15M)
  • 3. Substations (‐$10M)
  • 4. Automation (‐$12M)
  • 5. Recurring (‐$4M)

3.0% E le c tric Ra te Inc re a se

Impact: Reduced reliability balanced with increased affordability. Most vital infrastructure replaced at a sustainable rate.

Reduces Electric Pole Replacements Reduces Underground Conduit/Vault Replacements Reduces Neighborhood Streetlight Retrofits Eliminates GIS Integration, Customer Engagement Portal, Interactive Voice Response System Eliminates New Arlanza Substation

(Modified Option 1)

Delays Advanced Metering Infrastructure Deployment

(Comm. & Industrial 1 year; Residential 2 years)

REVISED

slide-35
SLIDE 35

1/4/2018 35

Rive rside Public Utilitie s.c om

69

  • 1. Overhead (‐$62M)
  • 2. Underground (‐$15M)
  • 3. Substations (‐$10M)
  • 4. Automation (‐$21M)
  • 5. Recurring (‐$4M)

2.9% E le c tric Ra te Inc re a se

Impact: Shifts use of carbon reduction credits from LED streetlights to renewable

  • energy. Loss of public safety, aesthetic benefits for most neighborhoods.

Eliminates Residential Citywide Streetlight LED Lamp Replacement Program

Rive rside Public Utilitie s.c om

70

  • 1. Overhead (‐$62M)
  • 2. Underground (‐$15M)
  • 3. Substations (‐$10M)
  • 4. Automation (‐$27M)
  • 5. Recurring (‐$4M)

2.8% E le c tric Ra te Inc re a se

Impact: Shifts use of all carbon reduction credits from LED streetlights to renewable energy. Loss of public safety, aesthetic benefits for entire city.

Eliminates Residential & Arterial Citywide Streetlight LED Lamp Replacement Program

REVISED

slide-36
SLIDE 36

1/4/2018 36

Rive rside Public Utilitie s.c om

71

  • 1. Overhead (‐$62M)
  • 2. Underground (‐$15M)
  • 3. Substations (‐$10M)
  • 4. Automation (‐$37M)
  • 5. Recurring (‐$4M)

2.7% E le c tric Ra te Inc re a se

Impact: Reduces ability to predict and detect outages automatically. Reduces customer and operational benefits.

Reduces Outage Management Delays and Extends Advanced Metering Infrastructure

Rive rside Public Utilitie s.c om

72

  • 1. Overhead (‐$62M)
  • 2. Underground (‐$15M)
  • 3. Substations (‐$10M)
  • 4. Automation (‐$43M)
  • 5. Recurring (‐$4M)

2.6% E le c tric Ra te Inc re a se

Impact: Eliminates ability to predict and detect outages automatically. Loss of

  • perational benefits of data integration to support utility reporting/compliance.

Eliminates Outage Management Eliminates Operational Data Management

REVISED

slide-37
SLIDE 37

1/4/2018 37

Rive rside Public Utilitie s.c om

73

  • 1. Overhead (‐$62M)
  • 2. Underground (‐$15M)
  • 3. Substations (‐$10M)
  • 4. Automation (‐$49M)
  • 5. Recurring (‐$4M)

2.5% E le c tric Ra te Inc re a se

Impact: Further reduces and delays customer and operational benefits.

Further Delays and Extends Advanced Meter Infrastructure

Rive rside Public Utilitie s.c om

74

  • 1. Supply (‐$86M)
  • 2. Treatment (‐$18M)
  • 3. Wells
  • 4. Transmission (‐$12M)
  • 5. Distribution (‐$35M)
  • 6. Reservoirs (‐$2M)
  • 7. Automation (‐$4M)

5.7% Wa te r Ra te Inc re a se

Impact: Reduced reliability balanced with increased affordability. Most vital infrastructure replaced at a sustainable rate.

Eliminates Supply Projects and Treatment Plant Eliminates Victoria Ave. Transmission Main Reduces JW North Filter Replacements Reduces Reservoir Maintenance Reduces Pipe Replacement Rate to 170 Years

(Modified Option 1)

Eliminates GIS Integrations, Customer Engagement Portal, Interactive Voice Response System Delays Advance Metering Infrastructure Deployment

(Comm. & Industrial 1 year; Residential 3 years)

REVISED

slide-38
SLIDE 38

1/4/2018 38

Rive rside Public Utilitie s.c om

75

  • 1. Supply (‐$86M)
  • 2. Treatment (‐$18M)
  • 3. Wells
  • 4. Transmission (‐$12M)
  • 5. Distribution (‐$35M)
  • 6. Reservoirs (‐$2M)
  • 7. Automation (‐$6M)

5.5% Wa te r Ra te Inc re a se

Impact: Reduces or eliminates customer and operational benefits. Reduces reliability, increases operating costs, and lengthens repair cycle times.

Extends Residential Advanced Metering Infrastructure Rollout to 7 Years; Scope Reduced by 12% Eliminates Work, Asset and Inventory Management Systems Eliminate Future Phases of Operations Data Management System Reduced SCADA Network Communications

Rive rside Public Utilitie s.c om

76

  • 1. Supply (‐$86M)
  • 2. Treatment (‐$18M)
  • 3. Wells
  • 4. Transmission (‐$12M)
  • 5. Distribution (‐$35M)
  • 6. Reservoirs (‐$2M)
  • 7. Automation (‐$13M)

5.0% Wa te r Ra te Inc re a se

Impact: Delays, reduces, and eliminates customer and operational benefits. Continues reliance on paper and inefficient manual processes.

Delays Residential Advanced Metering Infrastructure by 5 Years; Scope Reduced by 13% Eliminate Mobile Applications

REVISED

slide-39
SLIDE 39

1/4/2018 39

Rive rside Public Utilitie s.c om

77

  • 1. Supply (‐$86M)
  • 2. Treatment (‐$18M)
  • 3. Wells
  • 4. Transmission (‐$12M)
  • 5. Distribution (‐$35M)
  • 6. Reservoirs (‐$2M)
  • 7. Automation (‐$20M)

4.5% Wa te r Ra te Inc re a se

Impact: Further delays and significantly reduces customer and operational benefits.

Delays Comm. & Industrial Advanced Metering Infrastructure by 6 Years DelaysResidential Advanced Metering Infrastructureby 8 Years; Scope Reduced by 46%

Rive rside Public Utilitie s.c om

78

  • 1. Supply (‐$86M)
  • 2. Treatment (‐$18M)
  • 3. Wells
  • 4. Transmission (‐$12M)
  • 5. Distribution (‐$38M)
  • 6. Reservoirs (‐$2M)
  • 7. Automation (‐$26M)

4.0% Wa te r Ra te Inc re a se

Reduces Pipe Replacement Rate to 180 Years

Impact: More reduced reliability. Further delays and significantly reduces customer and operational benefits.

Delays Comm. & Industrial Advanced Metering Infrastructureby 7 Years DelaysResidential Advanced Metering Infrastructureby 10+ Years; Scope Reduced by 82% Delay SCADA Network Communications

REVISED

slide-40
SLIDE 40

1/4/2018 40

Rive rside Public Utilitie s.c om

79

  • 1. Supply (‐$86M)
  • 2. Treatment (‐$18M)
  • 3. Wells
  • 4. Transmission (‐$12M)
  • 5. Distribution (‐$54M)
  • 6. Reservoirs (‐$2M)
  • 7. Automation (‐$28M)

3.5% Wa te r Ra te Inc re a se

Impact: Severely reduced reliability. Further reduces customer and

  • perational benefits.

Reduces Pipe Replacement Rate to 220 Years DelaySCADA Network Communications

Rive rside Public Utilitie s.c om

80

  • 1. Supply (‐$86M)
  • 2. Treatment (‐$18M)
  • 3. Wells
  • 4. Transmission (‐$25M)
  • 5. Distribution (‐$56M)
  • 6. Reservoirs (‐$2M)
  • 7. Automation (‐$31M)

3.0% Wa te r Ra te Inc re a se

Impact: Reduced reliability, ability to generate revenues

Reduces T echitePipe Replacement by 1.4miles

Impact: More severely reduced reliability. Risk of losing groundwater transmission pipes, requiring expensive imported water.

Reduces Pipe Replacement Rate to 230 Years Eliminates Residential Advanced Metering Infrastructure

REVISED

slide-41
SLIDE 41

1/4/2018 41

Rive rside Public Utilitie s.c om

81

  • 1. Supply (‐$86M)
  • 2. Treatment (‐$18M)
  • 3. Wells
  • 4. Transmission (‐$32M)
  • 5. Distribution (‐$63M)
  • 6. Reservoirs (‐$2M)
  • 7. Automation (‐$31M)

2.5% Wa te r Ra te Inc re a se

Impact: Further reduce reliability, ability to generate revenues

Impact: Unacceptably reduced reliability. Significant risk of losing groundwater transmission pipes, requiring expensive imported water.

Reduces T echitePipe Replacement by 2.2 miles Reduces Pipe Replacement Rate to 270 Years

Rive rside Public Utilitie s.c om

82

Tiered and Seasonal Water Rates

Inclining Tiered Rates, Seasonal Pricing, and Budget‐Based Tiered Rates For additional information, please see Attachment 2 to the staff report

REVISED

slide-42
SLIDE 42

1/4/2018 42

Rive rside Public Utilitie s.c om

83

Inc lining T ie re d Ra te s

Rive rside Public Utilitie s.c om

84

Se a sona l Pric ing

REVISED

slide-43
SLIDE 43

1/4/2018 43

Rive rside Public Utilitie s.c om

85

Budg e t- Ba se d T ie re d Ra te s

Rive rside Public Utilitie s.c om

86

Budg e t- Ba se d T ie re d Ra te s

LOWER WATER RATE HIGHER

INDIVIDUALIZED CUSTOM ALLOCATIONS

CUSTOMER A

LOWER WATER RATE HIGHER

INDIVIDUALIZED CUSTOM ALLOCATIONS

CUSTOMER B

BASIC NEED INEFFICIENT/ WASTEFUL EFFICIENT OUTDOOR BASIC NEED EFFICIENT OUTDOOR INEFFICIENT /WASTEFUL