Developm ent of a w orld-class rail April 23 rd 2015 netw ork ADI F Background C Current Railw ays Scenario in Spain il S i i S i NEW LEGAL FRAMEW ORK. RAI LW AYS ACT ( 2 0 0 5 ) ADI F : Public, Govm t.-ow ned Com pany, attached


  1. Developm ent of a w orld-class rail April 23 rd 2015 netw ork ADI F

  2. Background C Current Railw ays Scenario in Spain il S i i S i � NEW LEGAL FRAMEW ORK. RAI LW AYS ACT ( 2 0 0 5 ) ADI F : Public, Govm t.-ow ned Com pany, attached to the Ministry of Developm ent ( Public W orks and Transport) • Ow n legal personality • O Ow n assets ( Rail netw ork + stations + logistic term inals + telecom netw ork) t ( R il t k t ti l i ti t i l t l t k) • Self-m anaged, but reporting to the Minister RAIL RAIL Defines railw ay policy, MI NI STRY OF AUTHORITY Legislates and plans PUBLI C W ORKS I NFRASTRUCTURE Capacity allocation RAI LW AY MANAGER UNDERTAKI NG COMPANI ES: Freight ( liberalized) Passengers ( Renfe) OTHER EQUI PMENT OTHER EQUI PMENT Capacity allocation Capacity allocation AND SERVI CE SUPPLI ERS 2

  3. Adif. Nature Adif & Adif AV are public entities attached to Ministry of Transport & Public W orks Managem ent • Conventional rail netw ork ( iberian gauge and m etric gauge) • Conventional rail netw ork ( iberian gauge and m etric gauge) • High Speed Netw ork on Standard UI C gauge � Madrid- Sevilla � Madrid Sevilla Madrid - Toledo Madrid - Toledo Madrid – Barcelona- French Border � HS netw ork built by Adif Madrid - Valladolid Córdoba - Málaga Madrid – Cuenca-Valencia/ Albacete / • Stations and logistic term inals -Alicante • Telecom m unication netw orks 3

  4. Adif + Adif AV. Global Figures � Main investor in Spain , in 8 years 2 0 0 5 / 2 0 1 2 3 7 ,9 0 0 M€ ( 5 0 bn $ ) High Speed: 32,100 M€ (42.7 bn $) Conventional Rail: 5,800 M€ (7.7 bn $) � Staff : 14,000 employees � Assets : > 40,000 M€ (53 bn $) � Managed Rail Netw ork : 1 5 1 3 0 km (9 500 mi) Managed Rail Netw ork : 1 5 ,1 3 0 km (9.500 mi) High Speed UI C gauge 1 ,4 3 5 m m : 2 ,3 2 1 km (1,500 mi) Conventional Lines ( I berian gauge 1 ,6 6 8 m m ) : 1 1 ,4 8 3 km (7,200 mi) Out of w hich 5 0 6 km (314 mi) w ith HS param eters Out of w hich 5 0 6 km (314 mi) w ith HS param eters Mixed Gauge Netw ork ( UI C + I berian gauge) 1 1 9 km (73 mi) ( Out of w hich 2 2 km (13 mi) w ith HS param eters Metric gauge 1 0 0 0 m m : Metric gauge 1 ,0 0 0 m m : 1 2 0 7 km (750 mi) 1 ,2 0 7 km (750 mi) � HS Lines under construction, study or planned: 2,009 km (1,250 mi ) � Fiber Optic Netw ork: 17,868 km (11,000 mi) � Stations: > 1,900 stations � Managed Traffic: 2.1 M trains / year � Passengers : 468 million passengers/ year (30 million HS) Passengers : 468 million passengers/ year (30 million HS) � Freight: 7,567 million net tons-km/ year � HS Punctuality : 98.5% 4

  5. HS Lines. Landmarks The Spanish netw ork, a continuous evolution from 1 9 9 2 COR 1 9 9 2 - Madrid-Sevilla : 471 km Francia 2 0 0 3 - Madrid-Lleida: 468 km SAN (200 km/ h ASFA). FI G Z Zaragoza-Huesca: 79 km H 79 k OUR OUR GI HU 2 0 0 5 / 0 6 Lleida-Tarragona: 95 km . Córdoba-Antequera: 100 km. ZGZ LLE MO VLD Connection to Toledo : 21 km. BCN TAR 2 0 0 7 - Madrid-Lleida: 468 km (300 km/ h from May 2007) Madrid-Valladolid: 181 km. MAD Antequera-Málaga: 55 km. A t Mál 55 k CU CU 2 0 1 3 : 2 0 0 8 - Tarragona-Barcelona: 88 km . TOL New 2 0 1 0 - Madrid-Cuenca: 183 km. Connection VAL Barcelona- Madrid-Albacete: 315 km. ALB ALB French Madrid-Valencia: 391 km Border Mollet – Girona: 75 km 1 3 1 km I ntern. Connection w ith France: 20 km ALI COR 2 0 1 1 - 2 0 1 1 - Ourense – A Coruña: 150 km Ourense – A Coruña: 150 km (Iberian gauge 1.668 mm) Albacete- SEV 2 0 1 3 - New Connection Barcelona- Alicante French Border 131 km ANT Albacete – Alicante : 165 km 1 6 5 km MLG 5 5

  6. HS Lines. Overview New connection New connection Barcelona ‐ French Border February 2013 HS Iberian Gauge HS Iberian Gauge 131 km SPANI SH HI GH SPEED 2 ,8 4 9 km Design 350 km/ h Operation 310 km/ h Albacete ‐ Alicante: 400 HS trains/ day June 2013 125,000 HS seats/ day 125 000 HS seats/ day 165 k 165 km Operating lines Lines under 30 M Passengers/ year construction Connection between HS Lines 2015 HS Lines 25% of total rail 25% of total rail passengers-km travel on Operating lines HS Lines under construction Connection between HS Lines 6

  7. HS Lines. Overview V ll d lid V Valladolid ‐ Venta de t d Variante de V i t d Venta de Baños ‐ V t d B ñ Baños ‐ Palencia ‐ León Pajares Burgos 162 km 33 km 135 km HS Iberian Gauge Vigo Santiago Vigo –Santiago 67 km Olmedo ‐ Zamora 103 km Plasencia ‐ Plasencia Badajoz 164km SPANI SH HI GH SPEED 2 0 1 5 Alicante – Murcia Operating lines 35 km 1 ,0 0 0 km Lines under com m issioned in 2 0 1 5 construction Sevilla ‐ Connection between HS Lines HS Lines Cádiz 150 km 2 0 1 2 -2 0 1 5 investm ent CAD CADIZ Operating lines Antequera ‐ in HS: 1 5 bn euros Granada Lines under construction 125 km Connection between HS Lines 7

  8. HS LI NE ATLANTI C AXLE ( La Coruña – Vigo, 1 5 6 km 9 7 m iles) Catoira Viaduct / Ulla River 1 ,6 2 0 m ( 1 m ile) Main arc 2 4 0 m ( 0 1 5 m i) Main arc 2 4 0 m ( 0 ,1 5 m i) W orld record of m etallic grid bridges 8

  9. Evolution of High Speed traffic Double Gauge trains add m ore than Double Gauge trains add m ore than Final grow th in 2 0 1 4 : Final grow th in 2 0 1 4 : 7 Millions passengers in 2 0 1 4 2 1 % 30 Million 30 30 Million 30 Million Million Hig High Speed Speed Rail il passeng engers 2014 2014 2014 2014 9 SOURCE: RENFE SOURCE: RENFE

  10. 10

  11. 11

  12. A main Haram ain Project reference reference � Contract: EUR 6 .7 4 bn. Participation of 12 Spanish companies � Construction, operation, maintenance of HSL in Saudi Arabia, 12 years. � Construction, operation, maintenance of HSL in Saudi Arabia, 12 years. Mecca-Medina: 449 km � 5 stations � Phase I I aw arded to a Spanish Consortium : • Design and installation of track, signaling, telecommunications electrification rail systems telecommunications, electrification, rail systems • Procurement of rolling stock • Operations & integral maintenance for 12 years � Adif scope: • Technological integration • • Design project construction and start Design, project, construction and start operations management (track, signalling, telecommunications, electrification, rail systems). • Maintenance & Traffic management Maintenance & Traffic management • Stations • Safety & Security 12

  13. For further inform ation, please contact Juan I gnacio Lem a Rial, TEN-T developm ent and I nternational Corridors Manager jlema@adif.es Avda. Pío XI I 1 1 0 , caracola 1 4 2 8 0 3 6 Madrid Tel. + 3 4 9 1 3 0 0 7 7 7 2

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.