ADI F
Developm ent of a w orld-class rail netw ork
April 23rd 2015
Developm ent of a w orld-class rail April 23 rd 2015 netw ork ADI F - - PDF document
Developm ent of a w orld-class rail April 23 rd 2015 netw ork ADI F Background C Current Railw ays Scenario in Spain il S i i S i NEW LEGAL FRAMEW ORK. RAI LW AYS ACT ( 2 0 0 5 ) ADI F : Public, Govm t.-ow ned Com pany, attached
April 23rd 2015
ADI F : Public, Govm t.-ow ned Com pany, attached to the Ministry of Developm ent ( Public W orks and Transport)
O t ( R il t k t ti l i ti t i l t l t k)
RAIL
Defines railw ay policy, Legislates and plans
MI NI STRY OF PUBLI C W ORKS
RAIL AUTHORITY
Capacity allocation
RAI LW AY UNDERTAKI NG COMPANI ES: Freight ( liberalized) Passengers ( Renfe) I NFRASTRUCTURE MANAGER OTHER EQUI PMENT
Capacity allocation
Capacity allocation
OTHER EQUI PMENT AND SERVI CE SUPPLI ERS
2
Madrid - Toledo
Madrid - Toledo Madrid – Barcelona- French Border Madrid - Valladolid Córdoba - Málaga Madrid – Cuenca-Valencia/ Albacete
/
3
Out of w hich 5 0 6 km (314 mi) w ith HS param eters Out of w hich 5 0 6 km (314 mi) w ith HS param eters
(Out of w hich 2 2 km (13 mi) w ith HS param eters
4
COR
FI G Francia 1 9 9 2 - Madrid-Sevilla: 471 km 2 0 0 3 - Madrid-Lleida: 468 km (200 km/ h ASFA). Z H 79 k OUR SAN LLE ZGZ HU BCN VLD MO Zaragoza-Huesca: 79 km 2 0 0 5 / 0 6 Lleida-Tarragona: 95 km. Córdoba-Antequera: 100 km. Connection to Toledo : 21 km. OUR GI MAD TAR CU 2 0 0 7 - Madrid-Lleida: 468 km (300 km/ h from May 2007) Madrid-Valladolid: 181 km. A t Mál 55 k TOL VAL ALB CU Antequera-Málaga: 55 km. 2 0 0 8 - Tarragona-Barcelona: 88 km. 2 0 1 0 - Madrid-Cuenca: 183 km. Madrid-Albacete: 315 km.
2 0 1 3 : New Connection Barcelona-
COR ALB Madrid-Valencia: 391 km Mollet – Girona: 75 km I ntern. Connection w ith France: 20 km 2 0 1 1 - Ourense – A Coruña: 150 km
French Border 1 3 1 km
ALI SEV ANT 2 0 1 1 - Ourense – A Coruña: 150 km (Iberian gauge 1.668 mm)
Albacete- Alicante 1 6 5 km
2 0 1 3 - New Connection Barcelona- French Border 131 km Albacete – Alicante : 165 km
MLG 5
HS Iberian Gauge
HS Iberian Gauge
Operating lines Lines under construction Connection between HS Lines
Operating lines Lines under construction Connection between HS Lines
6
V i t d V ll d lid V t d V t d B ñ HS Iberian Gauge Vigo Santiago Variante de Pajares 33 km Valladolid‐Venta de Baños‐Palencia‐León 162 km Venta de Baños‐ Burgos 135 km Vigo –Santiago 67 km Olmedo‐ Zamora 103 km Plasencia‐ Plasencia Badajoz 164km Alicante – Murcia
Operating lines Lines under construction Connection between HS Lines
35 km
Sevilla‐ Cádiz
Operating lines Lines under construction Connection between HS Lines
CAD CADIZ
150 km Antequera‐ Granada 125 km
7
W orld record of m etallic grid bridges
8
Double Gauge trains add m ore than Final grow th in 2 0 1 4 : Double Gauge trains add m ore than 7 Millions passengers in 2 0 1 4 Final grow th in 2 0 1 4 : 2 1 %
SOURCE: RENFE SOURCE: RENFE
9
10
11
Contract: EUR 6 .7 4 bn. Participation of 12 Spanish companies Construction, operation, maintenance of HSL in Saudi Arabia, 12 years.
Construction, operation, maintenance of HSL in Saudi Arabia, 12 years. Mecca-Medina: 449 km 5 stations Phase I I aw arded to a Spanish Consortium :
telecommunications electrification rail systems telecommunications, electrification, rail systems
Adif scope:
telecommunications, electrification, rail systems). Maintenance & Traffic management
12