Cremorne Wharf Community Liaison Working Group Tuesday 10 th March 2020 1 Agenda Welcome Minutes of previous meeting Cremorne Wharf Site Update Tideway Tunnel Progression Environment Update Community Relations Any Other


slide-1
SLIDE 1

1

Cremorne Wharf Community Liaison Working Group

Tuesday 10th March 2020

slide-2
SLIDE 2

2

Agenda

  • Welcome
  • Minutes of previous meeting
  • Cremorne Wharf Site Update
  • Tideway Tunnel Progression
  • Environment Update
  • Community Relations
  • Any Other Business
slide-3
SLIDE 3

3

Toma ma Schonk

  • nker

eren en – Site Agent nt

CREMORNE WHARF SITE UPDATE

slide-4
SLIDE 4

WORKS COMPLETED IN LAST PERIOD

Aeration Chamber Ventilation Pipe

  • 40.50m length
  • Drilled within 1800mm Diameter Bore
  • High Density Polyethylene Pipe (HDPE)
  • Weight 14 Tonnes
  • Externally grouted & filled with sand & water for buoyancy

Piling Works Completed

  • CSO Shaft
  • 52 No. Secant Piles Installed
  • Interception Chamber
  • 56 No Secant Piles Installed
  • Air Treatment Chamber & Aeration Chamber
  • 27 No. Bearing Piles
slide-5
SLIDE 5

CHELSEA WHARF MITIGATION WORKS COMPLETED

Chelsea Wharf Works Completed:

  • Cintec Anchors Installed connecting Southern Flank

wall to the internal walls

  • Helefix Resin Anchors installed across the major

structural cracks

  • Pattress Plates installed to the upper floor connecting

the roof trusses to the Southern Flank Wall

  • Installation of beams to the Internal Staircase D.
  • Removal of redundant ventilation duct on external

façade Before Mitigation Works External Cracks After Completion Mitigation Works Internal Cracks

slide-6
SLIDE 6

6

CSO SHAFT CAPPING BEAM WORKS COMPLETED

Secant Pile Excavation CSO Capping Beam Muck away by barge SCL Setup Works Combined Sewer Outfall

slide-7
SLIDE 7

7

CREMORNE WHARF SITE PROGRESS SCL WORKS

Testing the material View from 1st Advance Lifting Operations Overhead view of CSO Sprayed Concrete Lining

slide-8
SLIDE 8

Air Treatment Chamber Location

Air Treatment Unit

ATU CHAMBER WORKS

slide-9
SLIDE 9

CREMORNE WHARF WORKS MAR 20– JUN 20

Upcoming Activities

Connection Tunnel Works CSO Base Slab Construction Interception Chamber Excavation Works

slide-10
SLIDE 10

10

slide-11
SLIDE 11
slide-12
SLIDE 12
slide-13
SLIDE 13

13

CREMORNE WHARF DEPOT ENVIRONMENTAL UPDATE

Katy-Leigh Smith – Environmental Lead

slide-14
SLIDE 14

14

Cremorne Wharf Depot – Air Quality (December 2019 – February 2020)

Air Quality Monitor CREWD/AA/2 No Exceedances

slide-15
SLIDE 15

15

Du Dust Miti itigation Meas asures

slide-16
SLIDE 16

16

Crem emorne Wha harf Dep epot t – Noi

  • ise (D

(December r 2019 – Feb ebruary 2020) )

Noise Monitor CREWD/NM/3 No Exceedances

slide-17
SLIDE 17

17

Cremorne Wharf De Depot – No Nois ise Monit itoring Da Data De December 20 2019 19

slide-18
SLIDE 18

18

Cremorne Wharf De Depot – No Nois ise Monit itoring Da Data Jan January 20 2020 20

slide-19
SLIDE 19

19

Cremorne Wharf De Depot – No Nois ise Monit itoring Da Data February 20 2019 19

slide-20
SLIDE 20

20

24 24/5 /5 workin ing nois

  • ise le

levels ls (1 (1st

st – 8th th Mar

arch 20 2020 20)

Noisy works still allocated to during the day – noise levels drop off at night.

slide-21
SLIDE 21

21

24 24/5 /5 workin ing nois

  • ise le

levels ls (1 (1st

st – 8th th Mar

arch 20 2020 20)

Acoustic Blankets to shield noise emanating from generators.

slide-22
SLIDE 22

22

What is is 80 80 dB?

slide-23
SLIDE 23

23

Bar arge Movements – Jan January ry 202 2020 – Mar arch 20 2020 20

  • Barge movements started 21st January 2020
  • Excavated 2,379 tonnes
  • Removed 264 movements from the road (based on an average 18 tonne load)
  • Approx. 6 movements a day
slide-24
SLIDE 24

24

COMMUNITY ENGAGEMENT

ALICK WHITFIELD – COMMUNITY RELATIONS MANAGER CAROLINE BRENNAN – COMMUNITY RELATIONS OFFICER

slide-25
SLIDE 25

25

Complaints & Enquiries (January - March 2020)

82% 18%

Cremorne Wharf Depot Complaints & Enquiries January – March 2020

Complaints Enquiries

89% 11%

Cremorne Wharf Depot Complaints Breakdown

Trafffic Management General Site Management

Total - 11 Total - 9

Complaints & Enquiries:

  • Lighting
  • Vehicle Movements
  • Muck Away Wagons
  • Abnormal Load Deliveries
  • Noise
  • Idling Engines
slide-26
SLIDE 26

26

Community Engagement - 2020

  • Litter Surveys and Clean-up events in Collaboration

with Thames21

  • Outreach to schools with local brokerages and through

the council

  • EPIC Flashpoint Playcentre
  • World’s End Hub
  • SPIRAL education outreach programme

If If you have ve any suggestions for community in inve vestment, plea lease contact us via via th the e Tid ideway He Help lpdesk

slide-27
SLIDE 27

27

AOB