Hollands Farm Liaison Group Meeting 3 Powerpoint Slides Liaison - - PDF document

hollands farm liaison group meeting 3 powerpoint slides
SMART_READER_LITE
LIVE PREVIEW

Hollands Farm Liaison Group Meeting 3 Powerpoint Slides Liaison - - PDF document

Hollands Farm Liaison Group Meeting 3 Powerpoint Slides Liaison Group Meeting 3 Draft Development Brief Chair: Cllr Dominic Barnes, South West Chilterns Community Board Lead Officer: Charlotte Morris, Principal Planning Officer Chris


slide-1
SLIDE 1

Hollands Farm Liaison Group Meeting 3 – Powerpoint Slides

Liaison Group Meeting 3 – Draft Development Brief Chair: Cllr Dominic Barnes, South West Chilterns Community Board Lead Officer: Charlotte Morris, Principal Planning Officer Chris Kennett: Natural Environment & Urban Design Officer Chris Steuart: Major Development Team Leader Emily Hadley: Planning Policy Officer

Agenda

  • 1. Introductions (10mins)
  • 2. Progress since March (15mins)
  • 3. Development Framework (1hr)
  • Access and movement
  • Green infrastructure and open space
  • Heritage and conservation
  • Infrastructure - Onsite + off-site requirements
  • 5. Appropriate Assessment + Sustainability Appraisal (20 mins)
  • 6. Next steps (5mins)
  • 7. AOB (15mins)

Progress to date

 First draft of Development Brief

  • Internal consultation with specialists
  • Further refinement of infrastructure requirements
  • Development framework plan

 Completed Draft Appropriate Assessment  Completed Draft Sustainability Appraisal  Legal challenge update  Programme going forward

slide-2
SLIDE 2

Site analysis – Constraints and Opportunities

slide-3
SLIDE 3

Access and movement

 Existing public right of way  Current access Hedsor Road + Princes Road  Link road requirement including bus route  Need for wider connectivity

  • Former orchard
  • Hedsor Road
  • Wessex Road Employment Area
  • Town Centre
  • Connect to existing PRoWs

 Location of primary school

slide-4
SLIDE 4

Green infrastructure and open space

 Requirement to be landscape led

  • use of buffers
  • building on existing green
  • corridors – former orchard,
  • - maintain hedgerows + mature trees

 Open space and play provision  Incorporation of SUDs  Incorporating existing wildlife corridors

slide-5
SLIDE 5

Heritage and Conservation

 Conservation Area + listed buildings  Cores End Roundabout  Design of Hedsor Road junction  Relationship with properties at Hedsor Road

slide-6
SLIDE 6

Development Framework

 Landscape-led approach  Green space focus for setting  Connected green infrastructure  Use of generous green corridors as the basis for a footpath/cycle network  Respond to the different characters of the adjoining areas  Use landscaping to screen industrial + business park  Maintain separation from Hedsor Road properties through tree belt buffer  Respond to views across the site from public rights of way  Respond to the sites topography  Retain and protect existing mature trees

slide-7
SLIDE 7

Infrastructure Requirements

Onsite

 Link road + bus route  1 form primary school  Strategic open space, including the sports pitches, MUGA, Teen play facility, NEAP and allotments

Off site

 Junction improvements  Provide and enhance footpath and cycle links to the village centre  Contributions to facilitate public access to the former orchard  Contributions towards improving access and upgrading the bridleway on the disused former Bourne End to High Wycombe railway line  S106 contributions to mitigate recreational impacts at Burnham Beeches SAC

slide-8
SLIDE 8

Appropriate Assessment and Sustainability Appraisal Next Steps

  • Finalise draft Development Brief
  • Commence public consultation End of November
  • Early 2021 finalise and adopt Development Brief as a Supplementary Planning Document

Consultation methods

  • Online survey
  • Leaflet drop
  • Social media
  • Press release

AOB?