CSP-1373 REHABILITATION OF WHARVES 4 AND 5 AT BAYPORT CONTAINER - - PowerPoint PPT Presentation

csp 1373 rehabilitation of wharves 4 and 5 at bayport
SMART_READER_LITE
LIVE PREVIEW

CSP-1373 REHABILITATION OF WHARVES 4 AND 5 AT BAYPORT CONTAINER - - PowerPoint PPT Presentation

CSP-1373 REHABILITATION OF WHARVES 4 AND 5 AT BAYPORT CONTAINER TERMINAL Eddy Kharrazi, P.E. | Project Manager | Project & Construction Management (PCM) RFQ-898 - Analysis & Design for the Rehab of Wharves 4&5 at BPT RFQ-898 -


slide-1
SLIDE 1

CSP-1373 REHABILITATION OF WHARVES 4 AND 5 AT BAYPORT CONTAINER TERMINAL Eddy Kharrazi, P.E. | Project Manager | Project & Construction Management (PCM)

slide-2
SLIDE 2

RFQ-898 - Analysis & Design for the Rehab of Wharves 4&5 at BPT

slide-3
SLIDE 3

RFQ-898 - Analysis & Design for the Rehab of Wharves 4&5 at BPT

slide-4
SLIDE 4
  • Western End Wharf of Bayport Terminal.
  • 2000-ft Long x 200-ft Wide

Wharves 4 & 5 Overview

slide-5
SLIDE 5
  • Each wharf consists of 3 wharf sections.
  • Each wharf section is about 332-ft long.

Wharves 4 & 5 Plan

slide-6
SLIDE 6

Sample Repair

slide-7
SLIDE 7

Sample Repair

slide-8
SLIDE 8

Sample Repair

slide-9
SLIDE 9

Proposed Wharf Strengthening Section

slide-10
SLIDE 10

Design of New Tie-down

Wharf Section 1

slide-11
SLIDE 11

Pavement Removal Plan

slide-12
SLIDE 12

Proposed Wharf Strengthening - Plan

slide-13
SLIDE 13

Proposed Wharf Strengthening - Plan

slide-14
SLIDE 14

Design of New Tie-down

Wharf Section 1

slide-15
SLIDE 15

Construction Phasing Plan

slide-16
SLIDE 16

Construction Access Plan

slide-17
SLIDE 17

THANK YOU

Eddy Kharrazi, P.E.

Project Manager Port Houston

Questions? www.PortHouston.com

111 East Loop North Houston, TX 77029