SERVICES FOR THE IN-DEPTH STRUCTURAL INSPECTION AND REPAIR DESIGN - PowerPoint PPT Presentation

Port Houston: Pre-Proposal Meeting: RFQ - PROFESSIONAL ENGINEER SERVICES FOR THE IN-DEPTH STRUCTURAL INSPECTION AND REPAIR DESIGN OF WHARVES 47, 48, AND 1E AT TURNING BASIN TERMINAL 09/15/2020 Infrastructure Project Review Board Wharf 1E


  1. Port Houston: Pre-Proposal Meeting: RFQ - PROFESSIONAL ENGINEER SERVICES FOR THE IN-DEPTH STRUCTURAL INSPECTION AND REPAIR DESIGN OF WHARVES 47, 48, AND 1E AT TURNING BASIN TERMINAL 09/15/2020 Infrastructure Project Review Board

  2. Wharf 1E Wharves 47 and 48

  3. CD01E – Jacob Stern T-head Dock • ACR: 47 (orange) • T-head dock and substructure is in serious condition - 1W Timber piles and steel batter piles damaged • Fender system in poor condition – missing rubber absorption units • Timber braces and guards with severe decay 1E • Dolphin / Mooring system in poor condition 3

  4. CD01E – Jacob Stern T-head Dock Timber pile broken at waterline Broken steel batter pile Breasting dolphin missing four fender units Broken timber brace Timber pile with severe abrasion at waterline Timber brace with severe decay 4

  5. CD47/48 – Empire Stevedoring • ACR: 48 and 46 respectively (orange) • Structural and berthing components in serious condition • Fender system needs attention Existing tenant’s operations constrained if these docks are taken out for repair. 5

  6. CD47/48 – Empire Stevedoring CD47, spalling and deterioration of concrete pile CD47: Bay 1, deck underside with corroded reinforcing and one hole CD48, 1 fender with severe distortion and two missing fenders CD48, deck beams with severe cross-sectional loss CD48, deck underside with holes and exposed due to corrosion reinforcing with severe corrosion 6

  7. Scope of Work • Perform the following: (1) in-depth inspection and follow up investigation, (2) create cost estimations, (3) repair design, and (4) construction phase support for Wharves 47, 47 and 1E as identified in the FICAP report • For Wharves 47 and 48, develop a construction repair sequencing plan to minimize impact to operational activities of tenant 7

  8. Proposed timeline Proposed Activity Target Date Draft RFQ 08/28/20 Pass DG1 at IPRB 09/01/20 Place RFQ on Buy Speed 09/02/20 Received submitted RFQs 09/23/20 09/24/20 – 10/05/20 Rank and Evaluation Executive review committee 10/08/20 10/08/20 – 11/13/20 STP negotiations Agenda setting meeting for Dec commission 11/19/20 Commission meeting to award design contract 12/08/20 Sign design contract 12/09/20 8

  9. Port Houston: Thank You

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.