11/6/2018 Kenwood Energy Energy Management Consulting Compr e he nsive E ne r gy Pr oje c t Boar d Pr e se ntation Nove mbe r 13, 2018 T im Holme s Ke nwood E ne r gy 1 Kenwood Energy Energy Management Consulting Compr e he


  1. 11/6/2018 Kenwood Energy Energy Management Consulting Compr e he nsive E ne r gy Pr oje c t Boar d Pr e se ntation Nove mbe r 13, 2018 T im Holme s Ke nwood E ne r gy 1 Kenwood Energy Energy Management Consulting Compr e he nsive E ne r gy Pr oje c t (CE P) 1. Me asur e M Bond F unds a. Inc r e ase e ffic ie nc y of c lassr ooms and buildings 2. CA Gove r nme nt Code 4217.10 thr u 4217.18 a. Applie s to Sc hool Distr ic ts b. Applie s to c onse r vation and r e ne wable ge ne r ation c . Allows for financ ing and le ase s d. Re quir e s that the c ost be le ss than the savings (life time ) e . Contr ac tor se le c tion base d on qualific ations 2 1

  2. 11/6/2018 Kenwood Energy Energy Management Consulting CE P Options 1. Positive Re tur n CE P a. Pr oje c t foc use d on high e ne r gy savings, not Capital Impr ove me nt b. Re duc e s Distr ic t c osts thr u e ne r gy savings c . F unds ar e available for othe r Distr ic t busine ss 2. Ne utr al Re tur n CE P a. E ne r gy savings pay for the pr oje c t b. Cash flow ne utr al c . Inc lude s HVAC that is at the e nd of pr oje c te d life 3. Aggr e ssive CE P a. E ne r gy savings pay for some , but not all pr oje c ts b. Inc lude c apital r e plac e me nt of old HVAC 3 Kenwood Energy Energy Management Consulting Age d E quipme nt 4 2

  3. 11/6/2018 Kenwood Energy Energy Management Consulting Pr ogr e ss to Date 1. CPM c omple te d Pr op 39 ASHRAE audit - August 2015 2. Re le ase d a Re que st for Qualific ations – July 24 3. Re c e ive d 3 SOQs (State me nts of Qualific ations) – Aug 23 4. Inte r vie we d all thr e e 5. Se le c te d Syse r c o to move to the ne xt ste p 6. L e tte r of Inte nt unde r r e vie w a. “Non-Binding” Agreement b. Main Objectives I. Maximize replacement of aged HVAC equipment II. Develop project that pays for itself III. Meet all of the requirements of CA Code 4217 5 Kenwood Energy Energy Management Consulting L OI Commitme nts • Syse r c o 1. Comple te a c ompr e he nsive E ne r gy Audit and Dr aft CE P 2. De ve lop c onstr uc tion c osts and savings 3. Pr e se nt the financ ial pr o for ma 4. Wor k with Staff to finalize the CE P • Distr ic t 1. No c ost if the obje c tive s ar e n’t me t 2. Imple me nt the pr oje c t if the obje c tive s ar e me t 3. Pay fe e for auditing se r vic e s if #2 is me t and the Distr ic t de c ide s not to pr oc e e d. 6 3

  4. 11/6/2018 Kenwood Energy Energy Management Consulting Ne xt Ste ps 1. Syse r c o to c omple te Audit 2. F inalize the CE P sc ope . 3. Public He ar ing pe r Gov. Code 4217 4. E xe c ute F inal Agr e e me nt 5. Pr oje c t Planning & Imple me ntation 7 4

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.