11/6/2018 Kenwood Energy Energy Management Consulting Compr e he nsive E ne r gy Pr oje c t Boar d Pr e se ntation Nove mbe r 13, 2018 T im Holme s Ke nwood E ne r gy 1 Kenwood Energy Energy Management Consulting Compr e he


slide-1
SLIDE 1

11/6/2018 1

1

Compr e he nsive E ne r gy Pr

  • je c t

Boar d Pr e se ntation Nove mbe r 13, 2018

Kenwood Energy Energy Management Consulting

T im Holme s Ke nwood E ne r gy 2

Compr e he nsive E ne r gy Pr

  • je c t (CE

P)

1. Me asur e M Bond F unds a. Inc r e ase e ffic ie nc y of c lassr

  • oms and buildings

2. CA Gove r nme nt Code 4217.10 thr u 4217.18 a. Applie s to Sc hool Distr ic ts b. Applie s to c onse r vation and r e ne wable ge ne r ation c . Allows for financ ing and le ase s d. Re quir e s that the c ost be le ss than the savings (life time ) e . Contr ac tor se le c tion base d on qualific ations

Kenwood Energy Energy Management Consulting

slide-2
SLIDE 2

11/6/2018 2

3

CE P Options

1. Positive Re tur n CE P

a. Pr

  • je c t foc use d on high e ne r

gy savings, not Capital Impr

  • ve me nt

b. Re duc e s Distr ic t c osts thr u e ne r gy savings c . F unds ar e available for

  • the r

Distr ic t busine ss

2. Ne utr al Re tur n CE P

a. E ne r gy savings pay for the pr

  • je c t

b. Cash flow ne utr al c . Inc lude s HVAC that is at the e nd of pr

  • je c te d life

3. Aggr e ssive CE P

a. E ne r gy savings pay for some , but not all pr

  • je c ts

b. Inc lude c apital r e plac e me nt of old HVAC

Kenwood Energy Energy Management Consulting

4

Age d E quipme nt

Kenwood Energy Energy Management Consulting

slide-3
SLIDE 3

11/6/2018 3

5

Pr

  • gr

e ss to Date

1. CPM c omple te d Pr

  • p 39 ASHRAE

audit - August 2015 2. Re le ase d a Re que st for Qualific ations – July 24 3. Re c e ive d 3 SOQs (State me nts of Qualific ations) – Aug 23 4. Inte r vie we d all thr e e 5. Se le c te d Syse r c o to move to the ne xt ste p 6. L e tte r

  • f Inte nt unde r

r e vie w

a. “Non-Binding” Agreement b. Main Objectives I. Maximize replacement of aged HVAC equipment II. Develop project that pays for itself III. Meet all of the requirements of CA Code 4217

Kenwood Energy Energy Management Consulting

6

L OI Commitme nts

  • Syse r

c o 1. Comple te a c ompr e he nsive E ne r gy Audit and Dr aft CE P 2. De ve lop c onstr uc tion c osts and savings 3. Pr e se nt the financ ial pr

  • for

ma 4. Wor k with Staff to finalize the CE P

  • Distr

ic t

Kenwood Energy Energy Management Consulting

1. No c ost if the obje c tive s ar e n’t me t 2. Imple me nt the pr

  • je c t if the obje c tive s ar

e me t 3. Pay fe e for auditing se r vic e s if #2 is me t and the Distr ic t de c ide s not to pr

  • c e e d.
slide-4
SLIDE 4

11/6/2018 4

7

Ne xt Ste ps

1. Syse r c o to c omple te Audit 2. F inalize the CE P sc ope . 3. Public He ar ing pe r

  • Gov. Code 4217

4. E xe c ute F inal Agr e e me nt 5. Pr

  • je c t Planning & Imple me ntation

Kenwood Energy Energy Management Consulting