Compr e he nsive Ac ade mic & F ac ilitie s Maste r Plan Update
Boar d of T r uste e s Pr e se ntation
25 Apr il 2019
Compr e he nsive Ac ade mic & F ac ilitie s Maste r Plan - - PowerPoint PPT Presentation
Compr e he nsive Ac ade mic & F ac ilitie s Maste r Plan Update Boar d of T r uste e s Pr e se ntation 25 Apr il 2019 E xisting Conditions Instr uc tional Spac e Utilization T ar ge ts Room oom Ut Ut i l i z z a
Boar d of T r uste e s Pr e se ntation
25 Apr il 2019
E xisting Conditions Instr uc tional Spac e Utilization
T ar ge ts
Room
Ut Ut i l i z a z at i
Seat Ut Ut i l i z a z at i
Ro Room Ty Ty pe St St ud udent St St at at i
Si Si z e z e ( N SF) SF) 40 40 Ho Hour s / W eek eek ( M o M onday
i day day ) Ta Tar ge get Cl Cl as s r s s r
22- 22- 28 28 N S N SF 30 30 Ho Hour s s ( 75% 75%) 67% 67% G e G ener al al / O / O pen Co Com put er er L abs abs 35- 35- 40 40 N S N SF 30 30 Ho Hour s s ( 75% 75%) 80% 80% 50- 50- 60 60 N S N SF N a N at ur ur al al & & So Soci al al Sc Sci en ence Up Up t
115 N S N SF Ar Ar t s s & & Vo Vocat i
Tec Tech Cl Cl as s s s L a L abs 24 24 Ho Hour s s ( 60% 60%) 80% 80%
Oc tobe r 1- 5, 2018; daytime c our se s
Ave r age Classr
67% T ar ge t 30 Hour s T ar ge t
Se ats Hour s
Colle ge - wide Se at F ill
utiliza tio n, o n-a ve ra g e
a c c o mmo da te e nro llme nt surg e s
Colle ge -wide Hour ly Use
pe r c la ssro o m o n-a ve ra g e
E M b uilding a ppro a c he d ta rg e t
Ave r age Classr
67% T a rg e t 30 Ho urs T a rg e t
Se a ts Ho urs Se a ts Ho urs Se a ts Ho urs
67% T a rg e t 30 Ho urs T a rg e t 67% T a rg e t 30 Ho urs T a rg e t
City Campus
Nor th Campus
c a mpuse s
South Campus
Classr
ime - of- Day
City Campus
36 Classr
Nor th Campus
73 Classr
South Campus
Classr
ime - of- Day
33 Classr
Hour ly Use Patte r ns
ue sda y-T hursda y lunc htime lull
a c h c a mpus ha s a mo de ra te e ve ning pe a k a ro und 6:00 PM
rida ys
Utilization by Classr
Classroom Capacity Number
Number of Course Meetings Number Met Seat Percent Met Seat Number Met Hour Percent Met Hour Number Met Both Percent Met Both
City 20 or fewer 3 16 3 100.0% 20-29 8 89 3 37.5% 30-39 16 251 7 43.8% 3 18.8% 1 6.3% 40-49 7 91 3 42.9% 50+ 2 24 City Total 36 471 16 44.4% 3 8.3% 1 2.8% North 20 or fewer 4 23 3 75.0% 20-29 26 451 18 69.2% 6 23.1% 4 15.4% 30-39 37 609 20 54.1% 6 16.2% 2 5.4% 40-49 4 62 1 25.0% 1 25.0% 60-69 2 39 1 50.0% 1 50.0% 100+ 4 52 1 25.0% North Total 77 1,236 43 55.8% 15 19.5% 6 7.8% South 20 or fewer 2 6 1 50.0% 20-29 7 105 5 71.4% 30-39 23 359 8 34.8% 4 17.4% 2 8.7% 50-59 1 14 100+ 2 20 South Total 35 504 14 40.0% 4 11.4% 2 5.7%
College-Wide Total 148 2,211 73 49.3% 22 14.9% 9 6.1%
Colle ge - Wide Utilization Summar y – Base d on WSCH
60% o f Cla ssro o m Ca pa c ity wa s utilize d 52% o f Cla ss L a b Ca pa c ity wa s utilize d Oppo rtunitie s to re purpo se o r re duc e inve nto ry Pro g ra ms tha t a c hie ve d b e tte r c la ss la b utiliza tio n tha n o the rs: Art Bio lo g y / A&P Co nstruc tio n T e c hno lo g y Culina ry Arts De nta l pro g ra ms I ndustria l T e c hno lo g y Physic s
E xisting Conditions Spac e Audit Status
E xisting Conditions
121 E llic ott
209,490 GSF (58.8%)
City Campus – 121 E llic ott
E xc e lle nt Co nditio n Go o d Co nditio n F a ir Co nditio n Po o r Co nditio n E xc e lle nt Good F air
Nor th Campus – Br e tsc hge r Hall
Br e tsc hge r
192,520 GSF (34.5%)
E xc e lle nt Co nditio n Go o d Co nditio n F a ir Co nditio n Po o r Co nditio n E xc e lle nt Good F air
E xc e lle nt Good F air
South Campus – Building 1
Building 1
20,110 GSF (5.3%)
E xc e lle nt Co nditio n Go o d Co nditio n F a ir Co nditio n Po o r Co nditio n
E nvir
E nvir
Se c tor s inc lude d in Sc an (L
mplo yme nt a nd L a b o r F
ndustry
duc a tio n a nd Wo rkfo rc e De ve lo pme nt
rie Pro g ra ms
100% r e se ar c h c omple te ; ac ade mic inte r vie ws in pr
e ss
Ne xt Ste ps
Ne xt Ste ps Me e tings with Pr
e vie w Pr
ams and E nr
Pr
Inte r vie ws with Community Par tne r s Ac ade mic Pr
am Re vie w Comple te Spac e Audit / Update Physic al Spac e Inve ntor y Offic e Spac e Analysis Stude nt Sur ve y Spac e Ne e d Calc ulations Ne xt Ste e r ing Committe e Me e ting