  2. • Park Avenue Elementary School/Freehold Intermediate School • Freehold Learning Center Borough of Freehold Public Schools | 9.26.11 | Slide 2

  3. Category A – Life / Health Safety / Building Code/Emergent… Category B – Prevent Damage to Building Structure or Systems… g y g g y Category C – Recommended / Educational / Discretionary Projects… Category D – Barrier Free / ADA Compliance… Category E – Energy Related Projects… Borough of Freehold Public Schools | 9.26.11 | Slide 3

  4. � Perform On Site S r e and Assessment � Perform On-Site Survey and Assessment • Building • Site • Exterior/Roof • Interior Finishes I i Fi i h • Mechanical • Electrical • Plumbing • Plumbing � Evaluate for Replacement/Repair Costs for Each Item/System � Provide Preliminary Analysis for Solar/Photovoltaic � Provide Preliminary Analysis for Solar/Photovoltaic • Design Similar to that of Galloway Township Middle School � Debt Service Eligible • All projects except site projects (DOE is not currently approving Debt Service Projects) All j t t it j t (DOE i t tl i D bt S i P j t ) • ROD Grant Eligible – Allocation #4 � LRFP Updated • need request to amend the LRFP to implement changes d d h i l h Borough of Freehold Public Schools | 9.26.11 | Slide 4

  5. C Constructed in 1957 with Additions in 1961, 1968 and 1997 t t d i 1957 ith Additi i 1961 1968 d 1997 • Category A – Life / Health / Safety / Building Code / Emergent - grandfather clause on all building code issues - emergent issues – roof and parking lot i f d ki l -Replacement of roof -Replace asphalt parking lot and curbing(ROD grant eligible) • Category B – Prevent Damage to Building Structure C t B P t D t B ildi St t includes all exterior elements that protect envelope - waterproofing - windows - exterior doors d • Category C – Recommended/Educational/Discretionary Projects interior finishes beyond their useful life - interior doors/locks interior doors/locks - Carpeting in library - chalkboards -replacement of corridor lockers MEP items MEP items Borough of Freehold Public Schools | 9.26.11 | Slide 5

  6. • Category D – Barrier Free / ADA Compliance - barrier free access to building through vestibule - ADA doors / hardware / - toilet facilities / access to • Category E – Energy Related Projects - solar/photovoltaic system – 138 kW -optional MEP items Borough of Freehold Public Schools | 9.26.11 | Slide 6

  7. Interior Conditions • replace interior doors/hardware/classroom locks - security $120,000 • replace existing chalkboards with dry marker boards $14,000 • replacement of corridor lockers replacement of corridor lockers $60 000 $60,000 • replace casework, delaminating $75,000 • replacement of carpet in the library $27,000 SUBTOTAL: $296,000 Exterior Conditions Exterior Conditions • replace asphalt drives/parking lots $910,000 • replace roof $320,000 • repair concrete sidewalks $10,000 • waterproof and repoint brick veneer t f d i t b i k $200,000 $200 000 SUBTOTAL: $1,440,000 ADA Compliance • vestibule • gang toilets SUBTOTAL: $100,000 Borough of Freehold Public Schools | 9.26.11 | Slide 7

  8. Solar/Photovoltaic System • solar panel installation – 138 kW $864,000 Mechanical/Electrical/Plumbing Conditions (only poor or fair/poor) • replace unit ventilators $15,000 • replace fire alarm system p y $350,000 $ , • electric power distribution $216,000 • building branch circuits $224,000 CONSTRUCTION SUBTOTAL: $805,000 SUBTOTAL: $3,505,000 SOFT COSTS: $877,000 TOTAL PROJECT COSTS: TOTAL PROJECT COSTS: $4,382,000 $4,382,000 Borough of Freehold Public Schools | 9.26.11 | Slide 8

  9. Borough of Freehold Public Schools | 9.26.11 | Slide 9

  10. Borough of Freehold Public Schools | 9.26.11 | Slide 10

  11. Summary • Buildings are in good to very good shape, and maintained well! Buildings are in good to very good shape, and maintained well! • There are still many items that need repair or replacement • Park Avenue original building is 50 years old g g y • Very good market for construction – contractors are very competitive • Interest rates are very low • If the work is going to be completed at some time in the near future, now is a good time • Categories help prioritize work that needs to be completed g p p p Borough of Freehold Public Schools | 9.26.11 | Slide 11

  12. We woul We would like to d like to give speci give special thanks to thanks to the district admi the district administrati stration and and bui building staff g staff for for thei their assistan r assistance ce in the preparati the preparation of of the study. the study. We look forward to our continued relationship with We look forward to our continued relationship with p p the Freehold Borough Board of Education as we the Freehold Borough Board of Education as we provide professional services to the district. provide professional services to the district. QUESTIONS / ANSWERS? Borough of Freehold Public Schools | 9.26.11 | Slide 12

  13. Borough of Freehold Public Schools | 9.26.11 | Slide 13

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend