SLIDE 2
  • Park Avenue Elementary School/Freehold Intermediate School
  • Freehold Learning Center

Borough of Freehold Public Schools | 9.26.11 | Slide 2

slide-3
SLIDE 3

Category A – Life / Health Safety / Building Code/Emergent… Category B – Prevent Damage to Building Structure or Systems… g y g g y Category C – Recommended / Educational / Discretionary Projects… Category D – Barrier Free / ADA Compliance… Category E – Energy Related Projects…

Borough of Freehold Public Schools | 9.26.11 | Slide 3

slide-4
SLIDE 4

Perform On Site S r e and Assessment Perform On-Site Survey and Assessment

  • Building
  • Site
  • Exterior/Roof

I i Fi i h

  • Interior Finishes
  • Mechanical
  • Electrical
  • Plumbing
  • Plumbing

Evaluate for Replacement/Repair Costs for Each Item/System Provide Preliminary Analysis for Solar/Photovoltaic Provide Preliminary Analysis for Solar/Photovoltaic

  • Design Similar to that of Galloway Township Middle School

Debt Service Eligible

All j t t it j t (DOE i t tl i D bt S i P j t )

  • All projects except site projects (DOE is not currently approving Debt Service Projects)
  • ROD Grant Eligible – Allocation #4

LRFP Updated

d d h i l h

Borough of Freehold Public Schools | 9.26.11 | Slide 4

  • need request to amend the LRFP to implement changes
slide-5
SLIDE 5

C t t d i 1957 ith Additi i 1961 1968 d 1997

  • Category A – Life / Health / Safety / Building Code / Emergent
  • grandfather clause on all building code issues

i f d ki l

Constructed in 1957 with Additions in 1961, 1968 and 1997

  • emergent issues – roof and parking lot
  • Replacement of roof
  • Replace asphalt parking lot and curbing(ROD grant eligible)

C t B P t D t B ildi St t

  • Category B – Prevent Damage to Building Structure

includes all exterior elements that protect envelope

  • waterproofing
  • windows

d

  • exterior doors
  • Category C – Recommended/Educational/Discretionary Projects

interior finishes beyond their useful life interior doors/locks

  • interior doors/locks
  • Carpeting in library
  • chalkboards
  • replacement of corridor lockers

MEP items

Borough of Freehold Public Schools | 9.26.11 | Slide 5

MEP items

slide-6
SLIDE 6
  • Category D – Barrier Free / ADA Compliance
  • barrier free access to building through vestibule
  • ADA doors / hardware

/

  • toilet facilities / access to
  • Category E – Energy Related Projects
  • solar/photovoltaic system – 138 kW
  • optional MEP items

Borough of Freehold Public Schools | 9.26.11 | Slide 6

slide-7
SLIDE 7

Interior Conditions

  • replace interior doors/hardware/classroom locks - security

$120,000

  • replace existing chalkboards with dry marker boards

$14,000

  • replacement of corridor lockers

$60 000 replacement of corridor lockers $60,000

  • replace casework, delaminating

$75,000

  • replacement of carpet in the library

$27,000 SUBTOTAL: $296,000

Exterior Conditions Exterior Conditions

  • replace asphalt drives/parking lots

$910,000

  • replace roof

$320,000

  • repair concrete sidewalks

$10,000 t f d i t b i k $200 000

  • waterproof and repoint brick veneer

$200,000 SUBTOTAL: $1,440,000

ADA Compliance

  • vestibule
  • gang toilets

SUBTOTAL: $100,000

Borough of Freehold Public Schools | 9.26.11 | Slide 7

slide-8
SLIDE 8

Solar/Photovoltaic System

  • solar panel installation – 138 kW

$864,000

Mechanical/Electrical/Plumbing Conditions (only poor or fair/poor)

  • replace unit ventilators

$15,000

  • replace fire alarm system

$350,000 p y $ ,

  • electric power distribution

$216,000

  • building branch circuits

$224,000 CONSTRUCTION SUBTOTAL: $805,000

SUBTOTAL: $3,505,000 SOFT COSTS: $877,000 TOTAL PROJECT COSTS: $4,382,000 TOTAL PROJECT COSTS: $4,382,000

Borough of Freehold Public Schools | 9.26.11 | Slide 8

slide-9
SLIDE 9

Borough of Freehold Public Schools | 9.26.11 | Slide 9

slide-10
SLIDE 10

Borough of Freehold Public Schools | 9.26.11 | Slide 10

slide-11
SLIDE 11

Summary

  • Buildings are in good to very good shape, and maintained well!

Buildings are in good to very good shape, and maintained well!

  • There are still many items that need repair or replacement
  • Park Avenue original building is 50 years old

g g y

  • Very good market for construction – contractors are very competitive
  • Interest rates are very low
  • If the work is going to be completed at some time in the near future,

now is a good time

  • Categories help prioritize work that needs to be completed

g p p p

Borough of Freehold Public Schools | 9.26.11 | Slide 11

slide-12
SLIDE 12

We woul We would like to d like to give speci give special thanks to thanks to the district admi the district administrati stration and and bui building staff g staff for for thei their assistan r assistance ce in the preparati the preparation of

  • f the study.

the study.

We look forward to our continued relationship with We look forward to our continued relationship with p the Freehold Borough Board of Education as we provide professional services to the district. p the Freehold Borough Board of Education as we provide professional services to the district.

QUESTIONS / ANSWERS?

Borough of Freehold Public Schools | 9.26.11 | Slide 12

slide-13
SLIDE 13

Borough of Freehold Public Schools | 9.26.11 | Slide 13