Proposed Opening September 2014 Designs provided by Allen Barnett - - PowerPoint PPT Presentation

proposed opening september 2014 designs provided by allen
SMART_READER_LITE
LIVE PREVIEW

Proposed Opening September 2014 Designs provided by Allen Barnett - - PowerPoint PPT Presentation

Valleyview STEM Lab Proposed Opening September 2014 Designs provided by Allen Barnett from DiCara Rubino Architects Designs provided by Allen Barnett from DiCara Rubino Architects Designs provided by Allen Barnett from DiCara Rubino Architects


slide-1
SLIDE 1

Valleyview STEM Lab

Proposed Opening September 2014

slide-2
SLIDE 2

Designs provided by Allen Barnett from DiCara Rubino Architects

slide-3
SLIDE 3

Designs provided by Allen Barnett from DiCara Rubino Architects

slide-4
SLIDE 4

Designs provided by Allen Barnett from DiCara Rubino Architects

slide-5
SLIDE 5

Designs provided by Allen Barnett from DiCara Rubino Architects

slide-6
SLIDE 6

Designs provided by Allen Barnett from DiCara Rubino Architects

slide-7
SLIDE 7

Designs provided by Allen Barnett from DiCara Rubino Architects

slide-8
SLIDE 8

Designs provided by Allen Barnett from DiCara Rubino Architects

slide-9
SLIDE 9

Sample Projects

Grade 6

  • Introduction to Robotics
  • Hot Air Balloon Design Competition

Grade 7

  • Hydroponics
  • Introduction to Robotic Programming
  • CAD designs

Grade 8

  • Rube Goldberg Machine Design Challenge
  • 3-D Creations
  • Rube Goldberg Machine Film Production
slide-10
SLIDE 10

Highlights

  • State of the Art Technology Capabilities
  • Collaborative Work Station- Mediascape
  • MAC Lab
  • Computer Aided Design (CAD)
  • Oversized Printer
  • 3-D Printer
  • Individual and group computer work areas
  • Kinetic Testing Area
  • Workstations for up to 42 students
  • SMARTboard
  • Oversized Storage Lockers for Student Projects
  • Drop-down electrical sockets
slide-11
SLIDE 11

Item Cost $

Replace Sink 2,800 Lab Stools 750 Mobile Work Tables 9000 Design Jet Printer 3500 12 MACS + 1 MACbook 26,000 Auto Cad Licenses 1,600 SMARTboard/Projector & Install 3800 State App for Change of Use 500 Curriculum & Materials 22,940 Supplies for 3-D printer 1000 Cabinets Replaced 9,500 3-D Printer 3000 Wood Floor sanded and repaired 5000 Collaborative Work Station (puck) 10,000 Architect to do app for change of use 2,500 Drop Ceiling 50,000 Laminate Chalkboard/White 450

TOTAL COST $152,340