Anthony Echelle, P.E. ODOT Division II Engineer Cassidy Doescher, P.E. EST, Inc. Project Engineer COMPREHENSIVE ENGINEERING SERVICES Public Meeting The purpose of this meeting is to present an eastern realignment of US-70 to the public and


slide-1
SLIDE 1

Anthony Echelle, P.E. ODOT Division II Engineer Cassidy Doescher, P.E. EST, Inc. Project Engineer

COMPREHENSIVE ENGINEERING SERVICES

slide-2
SLIDE 2

Public Meeting

The purpose of this meeting is to present an eastern realignment of US-70 to the public and receive input to aid the Department in moving forward with design and construction.

  • Project History
  • Alignment Study Process
  • Lane Configurations
  • Proposed Realignment
  • New Highway Designations

COMPREHENSIVE ENGINEERING SERVICES

slide-3
SLIDE 3

Project History

  • 1996 Public Meeting
  • 1997 US-70 Feasibility Study
  • 2001 Public Meeting
  • 2014 Alignment Study

COMPREHENSIVE ENGINEERING SERVICES

slide-4
SLIDE 4

Alignment Study Process

  • Topographic Survey
  • Traffic Data Projections
  • Environmental Constraints
  • Design Guidelines
  • Operational Analysis

COMPREHENSIVE ENGINEERING SERVICES

slide-5
SLIDE 5

Environmental Constraints

  • Human Impacts
  • Churches and Cemeteries
  • Hazardous Waste Sites (AST/UST sites)
  • HUD Housing
  • Sewage Lagoons
  • Resource Issues
  • Wetlands
  • Prime Farmland
  • Relocation Concerns
  • Residences, Businesses
  • Well heads and pump jacks

COMPREHENSIVE ENGINEERING SERVICES

slide-6
SLIDE 6

Design Guidelines

  • At-grade intersection at US-177/SH-199’s northern

junction

  • Avoid environmental constraints and minimize impacts to

adjacent landowners

  • Eastern route from US-177/SH-199 northern junction
  • Bridge over the BNSF Railroad
  • Bridge over 3rd Street
  • Connections east of town with US-377/SH-99, US-177/SH-

199 and south of town with existing US-70

COMPREHENSIVE ENGINEERING SERVICES

slide-7
SLIDE 7

Lane Configurations

45 mph Five-Lane Highway with Curb

COMPREHENSIVE ENGINEERING SERVICES

slide-8
SLIDE 8

Lane Configurations

45 mph Five-Lane Highway with Shoulders

COMPREHENSIVE ENGINEERING SERVICES

slide-9
SLIDE 9

Lane Configurations

65 mph Highway with Shoulders

Ultimate Construction Initial Construction

COMPREHENSIVE ENGINEERING SERVICES

slide-10
SLIDE 10

Proposed Realignment

HUD Housing City of Madill

N

Oakland Cemetery Oakview Church

US-177 SH-199 Existing US-70 At-Grade Intersection US-70 Bridge Bridge over US-70

COMPREHENSIVE ENGINEERING SERVICES

Proposed US-70

slide-11
SLIDE 11

Proposed Realignment

N

Smiley Road Archard Road Whiskey Creek Road Whiskey Creek Road At-Grade Intersection US-70 Bridge Bridge over US-70

COMPREHENSIVE ENGINEERING SERVICES

Proposed US-70

slide-12
SLIDE 12

New Highway Designations

US-70 US-177 SH-199 US-70 US-177 SH-199 US-70 US-377 SH-99 US-177 SH-199 EXISTING US-177/SH-199 EXISTING US-377/SH-99 EXISTING US-70

COMPREHENSIVE ENGINEERING SERVICES

EXISTING US-70

slide-13
SLIDE 13
  • Next Steps in Process
  • Update Environmental Studies and Public Hearing
  • Construction Plan Production
  • Right-of -Way Acquisition and Utility Relocation – 2016
  • Begin Phased Construction Operations – 2018

COMPREHENSIVE ENGINEERING SERVICES

slide-14
SLIDE 14

Questions/Comments

More Information is available online at www.odot.org/publicmeetings Comments may be provided as follows:

  • Leave your comment form here tonight
  • Download and fill out a form online
  • Mail or fax forms to ODOT at:

Oklahoma Department of Transportation Environmental Programs Division 200 NE 21st Street Oklahoma City, OK 73015 Fax No. (405) 522-5193

Email comments to: environment@odot.org

Comments are due by September 17, 2015