an and ad adva vanced ed
play

AN AND AD ADVA VANCED ED TECHNO HNOLOGI LOGIES ES CONTENTS - PowerPoint PPT Presentation

DRIL ILLING LING IN INNOVA VATION IONS S AN AND AD ADVA VANCED ED TECHNO HNOLOGI LOGIES ES CONTENTS INVESTGE STGEOSER OSERVIS HSE ENGINEE EERING NG AND TECHNO NOLOG OGY Y CENTER ER RIG OUR PROJEC OJECTS TS CUSTOM


  1. DRIL ILLING LING IN INNOVA VATION IONS S AN AND AD ADVA VANCED ED TECHNO HNOLOGI LOGIES ES

  2. CONTENTS INVESTGE STGEOSER OSERVIS HSE ENGINEE EERING NG AND TECHNO NOLOG OGY Y CENTER ER RIG OUR PROJEC OJECTS TS CUSTOM OMER ERS FLEE EET DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

  3. INVESTGEOSERVIS ABOUT UT THE COMPANY NY Project management – services concerning management of onshore well. A range of services The group of companies INVESTGEOSERVIS regarding project management is selected based realizes a complete cycle of oil and gas wells on the customer’s current requirements. The PM construction of any complexity, design and services include, without limitation, the following purpose, including extended reach (ERD) wells principal areas: participation in the project and multilateral wells, on the terms a customer documentation development, management and requires, namely: control of all processes and work types at the well, cost control and optimization, engineering, Master contract (Lump Sum) – includes works technology, supervising, logistics, supplies, and concerning project documentation consulting in HSE (occupational health, industrial development, construction of access routes safety and environmental protection) area. and drill/cluster pads, Rigging up, drilling, rendering drilling services, wells suspension/ Drilling technological services rendering : abandonment, land rehabilitation and delivery • cementing to the monitoring authorities. • MWD • drilling fluids Daily rate drilling – rendering services of well drilling providing rig crews and/or drilling units of various capacity. DRILLING INNOVATIONS AND ADVANCED 1 TECHNOLOGIES

  4. STRUCTURE OF GC INVESTGEOSERVIS JSC C INVES ESTGEOSE TGEOSERVIS ENGINEE NEERI RING NG CENT NTER ER Master contractor for well construction Drilling process support 205 employ oyee ees 25 5 employ oyee ees IGS-TECHN HNOLO LOGIA IA IGS-NEU TYUMENG MENGEOLO LOGIA IA IGS-AV AVTO Rig contractor Technological services Well completion and stimulation Logistics and transportation 103 employ oyee ees 1189 employ oyee ees 452 employ oyee ees 77 77 employ oyee ees MANAG AGEM EMEN ENT BOAR ARD OF IGS S GROU OUP Damir r Tukta taro rov Andre rey Zhuto tov Alexandr xandr Svetl tlana na Kosov CEO Commercial Director Kochuhova Executive CFO Director DRILLING INNOVATIONS AND ADVANCED 2 TECHNOLOGIES

  5. PROJECT MANAGEMENT STRUCTURE CUSTOMER ER PROJECT CT HEAD ENGINEERING AND MANAGER ER TECHNOLOGY CENTER LOGISTICS GEOLOGIST HSE TECHNO-LOGIST CHIEF ENGINEER ECONOMIST LAWYER SPECIALIST SITE MANAGER SUPERVISOR UNSOL NSOLVABL ABLE E CHALL ALLENG ENGES ES DO NOT EXIST ST DRILLING INNOVATIONS AND ADVANCED 3 TECHNOLOGIES

  6. ENGINEERING AND TECHNOLOGY CENTER OBJECTIVE JECTIVES OF THE CENTE NTER ENGIN INEERING RING DESIG IGN On November 17, 2011, the Engineering and ETC takes part in the preparation of a Technology Center (ETC) of GC technical assignment for well design. INVESTGEOSERVIS was opened in Tyumen and Technological department of the ETC in 2013 it was transferred over to Moscow. ETC works through the modern technical and that is a unique project for Russian in many engineering solutions planned to be respects is equipped in a state-of-the-art manner implemented in the well construction and designed to draw competitive advantage at process. At this stage, the ETC issues a the stage of the wells design and construction. documentation that is approved by the The ETC task is to minimize operational risks customer, is compliant with the through the project quality enhancement and by formation’s geological structure and means of the online professional technological includes technical and engineering support of the wells construction process solutions requisite for the high-quality well rendered by the center’s competent personnel construction. and the works performance control. DRILLING INNOVATIONS AND ADVANCED 4 TECHNOLOGIES

  7. HSE INVESTGEOSERVIS is implementing Corporate Social Responsibility policy whereby a business monitors and ensures its active compliance with the spirit of the law, environmental, ethical standards and international norms. This commitment adds value to employees, customers, shareholders and communities. In 2014, the rig crew personnel has undergone training on the well management in failures and emissions according to the international standard International World Control Forum . Personal protective equipment by the leading global manufacturers of PPE is used in the project works. INVESTGEOSERVIS has certificates required for operations performance: • ISO 9001:2008 • ISO 14001:2004 • OHSAS 18001:2007 • IADC certificate • Certificate of the Rig Contractors Association • Euro Standart compliance certificate. INVESTGEOSERVIS IS AN ENVIRONMENT- FRIENDLY ENTERPRISE WHOSE IMAGE IS BASED ON THE TRUST OF CUSTOMERS, PARTNERS, CLIENTS AND POPULATION IN THE REGIONS THE COMPANY OPERATES. NO HARM TO THE ENVIRONMENT DRILLING INNOVATIONS AND ADVANCED 5 TECHNOLOGIES

  8. STATIC DRAWWORKS TOP DRIVE, HOOK LOAD Q-TY RIG CAPACITY, MUD PUMPS LOAD RATING, CAPACITY, H.P. TONS TONS BU 6500/450 3 х 3 NB-1600F 2 562 2500 500 SCR BU Arctica 3 х 3 NB-1600F 4 500 2000 500 / 750 6000/400 SCR 2 х 3 NB-1600F 7 ZJ-50DBS 400 1500 350 / 500 2 х 3 NB-1600F 1 BU 4500/270 AC 350 1500 500 / 750 2 х 3 NB-1000F 7 ZJ-40 225 1000 250 2 х F-500 2 ZJ-30 180 750 250 2 х UNB-600 6 3D-76 / 86 400 1000 - DRILLING INNOVATIONS AND ADVANCED 6 TECHNOLOGIES

  9. OUR YAMAL LNG PROJECTS 7-year Lump Sum contract for 134 horizontal wells (horizon up to 1500 m) Within the period 2013-2020, JSC INVESTGEOSERVIS shall drill 134 wells . Three rigs BU 6000/400 SCR “ARCTICA” (2000 HP). Failure-free operation in arctic conditions of complete self-sufficiency at the temperature down to -60 °С and wind velocity 20 m/s . A complex logistic scheme is implemented that allowed delivering 20,000 tons of cargo per year in the shortest time possible. DRILLING INNOVATIONS AND ADVANCED 7 TECHNOLOGIES

  10. NOVATEK- OUR PROJECTS YURKHAROVNEFTEGAS 8500 m MD In last three years seven super-deep wells have The following technologies have been employed been successfully drilled in the Yamal 6,500 to in constructions: 8,500 meters MD. • Latest-generation rotary-steerable systems The longest ERD well in the mainland part of • Online Logging-while-drilling (LWD) gauges Russia – 8,497 meters long with step out of • Real-time geomechanical support 7,059 meters. • Lowering the casing columns with constant rotation and circulation Engineering and technological center of • Hydraulic reaming pad device for the casing INVESTGEOSERVIS has participated directly in column the ERD wells engineering design and executed • Equipment for transportation column rotation engineering calculations and selection of independently from the tail pipe. requisite technologies and materials. DRILLING INNOVATIONS AND ADVANCED 8 TECHNOLOGIES

  11. NOVATEK- OUR PROJECTS YURKHAROVNEFTEGAS Reduction of the construction time by half Reduction of the construction time by half within 3 years . Working on the project since 2009. Three Rigs with Hook load capacity 400 tons (1500 HP) “en echelon”. 15 wells a year with a horizontal section up to 1500 m with hi-end LWD technology. Complex profiles of wells with a high azimuth slew. DRILLING INNOVATIONS AND ADVANCED 9 TECHNOLOGIES

  12. SLAVNEFT- OUR PROJECTS KRASNOYARSK NG Drilling in no-returns conditions Working on a project at the Kuyumbinskoe field in Krasnoyarsk Krai since 2014. 1 drilling rig 6000/400 SCR (2000 HP) “ARCTICA” and 3 drilling rigs ZJ-50 DBS (1500 HP) are engaged. Drilling facilities have been mobilized in the shortest possible time for a distance of 4,500 KM KM 4,500 km in the no-road and complex 10 10,000 TONS logistic scheme conditions. A well with a target depth of 3,723 meters TVD and a horizontal sidetrack has been drilled by 12% faster than the competitors’ ones. DRILLING INNOVATIONS AND ADVANCED 10 TECHNOLOGIES

  13. OUR ROSNEFT PROJECTS Conquering Eastern Siberia INVESTGEOSERVIS is a highly qualified master contractor for well construction at the sites of ROSNEFT. Working for ROSNEFT project since 2014. Five mobile drilling units 1000 HP Drilling of sidetracks up to 1,650 meters long. 2015 – we have drilled the vertical exploration wells up to 4,400 meters deep. 3 years contract for VOSTSIBNEFTEGAZ project within the period 2017-2019. Drilling rig ZJ-50 DBS (1500 HP) is engaged. The prospect of mobilizing additional rigs to the project. DRILLING INNOVATIONS AND ADVANCED 11 TECHNOLOGIES

  14. OUR ARKTIKGAZ PROJECTS Horizon section up to 1500 m Works on the project started in 2012. 2-7 drilling units ZJ-50 DBS (1500 HP) are engaged. Drilling of wells with the anomaly ratio of 2.1 . Using hi-end LWD DRILLING INNOVATIONS AND ADVANCED 12 TECHNOLOGIES

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend