6 18 2015
play

6/18/2015 Biosciences eastern and central Africa International - PDF document

6/18/2015 Biosciences eastern and central Africa International Livestock Research Institute (BecA ILRI) Hub Mobilizing biosciences for Africas development LABORATORY MANA LABORA MANAGEM GEMENT NT AND AND EQ EQUIPMENT O OPERA


  1. 6/18/2015 Biosciences eastern and central Africa – International Livestock Research Institute (BecA ‐ ILRI) Hub Mobilizing biosciences for Africa’s development LABORATORY MANA LABORA MANAGEM GEMENT NT AND AND EQ EQUIPMENT O OPERA ERATIONS TRAINI TRAINING W NG WORKS RKSHOP Venue: Rwanda Agriculture Board (RAB) – Rubona Station 15th-19th June 2015 BecA ‐ ILRI Hub Nairobi, Kenya 15 ‐ 19 June, 2015 Equi Equipment nt - - Speci pecification Prese Presentation 1 17 • Each equipment has specs e.g. Laboratory Equipment • Work environment specs • Installation specs • Power specs Specification, Installation & Certification • Utilities specs • Installer/Tech personnel specs • User specs Presentation by: Wanjawa W. B. – ILRI Engineering Department, Nairobi, Kenya Equi Equipment nt – – Speci pecification cont cont. Equipment Equi nt – – Speci pecification cont cont. • Case: • Temperature (Ambient/Operation) 1. Safety Cabinet • Level ground/Bench top 2. Centrifuge • 220V/240V or 110V/115V • 1-phase or 3-phase • Socket type – 2pin, 3pin, Square/Round • Need for water, steam • Certified Technicians, General user • Trained user, General user 1

  2. 6/18/2015 Equi Equipment nt – – Inst nstallation cont cont. Equi Equipment nt - - Inst nstallation • On site • Work environment specs • Ensure environment is ready • Packing list • Unpack • Confirmation of items • Physical inspection and checks • Installation checklist • Go ahead with installation or • Connections • Send back • Inspection/Checks • Move to site • Switch on utilities • Test run Equipment Equi nt – – Inst nstallation cont cont. Equi Equipment nt – – Cer erti tification • Case: • Equipment state 1. Safety Cabinet • Should be working 2. Centrifuge • Ensure it is repaired/maintained • Establish regulatory requirements • Confirm what should be done • Internal/External input Equi Equipment nt – – Cer erti tification cont cont. Equi Equipment nt – – Cer erti tification cont cont. • Test gears • Case: • Certification report 1. Safety Cabinet • Pass or Fail 2. Centrifuge • Usually put sticker/tag on machine status • Corrective action for Fail • Schedule for next certification 2

  3. 6/18/2015 Pract Practical / / Demo Demo End of Presentation 1 End of Prese 17 • Developing a maintenance schedule for a laboratory complex….. • 30 minutes work • 30 minutes presentation • Ready… • Q&A first Thank you Barack Wamkaya Wanjawa Engineering Maintenance Coordinator ILRI Nairobi Kenya Engineering Department b.wanjawa@cgiar.org Mobilizing biosciences for Africa’s development http://hub.africabiosciences.org 3

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend