Verify that the dump was correctly
L h t ti ll ft h d
Launch automatically after each dump Acquisition of equipment/ measurement devices Analysis of dump action and check against refs Analysis of dump action and check against refs Interface with LHC sequencer Interface with Beam Interlock System Interface with Beam Interlock System
Storage and retrieval on an “event” basis
Generate alarms
LBDS Audit, 28/ 01/ 2008 Gallet Eric, AB/ BT 2
LBDS Audit, 28/ 01/ 2008 Gallet Eric, AB/ BT 3
LINE BPM ACQUISITION LINE BPMs
LBDS Audit, 28/ 01/ 2008 Gallet Eric, AB/ BT 4
summary, status
/ Q/ Q p/ / p
LBDS Audit, 28/ 01/ 2008 Gallet Eric, AB/ BT 5
Split into distinct functionalities:
acquisition and storage
automatic process running in a server connected to
the timing system
analysis analysis
automatic process running in a server connected to
the timing system g y
retrieval/ viewing
GUIs to view results and to browse through archived
dumps
LBDS Audit, 28/ 01/ 2008 Gallet Eric, AB/ BT 6
Acquisition and storage
Acquiring real data from MKDs, MKBs and writing to
SDDS storage SDDS storage
Working on acquisition chains for other devices Updating logging data base requirements
Analysis
Prototypes for BTVDD tested on dummy data Prototype for MKD used on real data About to start working on MKB module
“E t b ” GUI
“Event browser” GUI
Some components exist (BTVDD display, MKD history…
)
LBDS Audit, 28/ 01/ 2008 Gallet Eric, AB/ BT 7
BTVDD analyses
Width [ mm] Height [ mm] Length [ mm] Center [ mm] Start of trace [ mm] trace [ mm] Initial 352 318 899
17 Measures 352 319 1001
16 Error [ % ] 0 3 11 0 2
LBDS Audit, 28/ 01/ 2008 Gallet Eric, AB/ BT 8
Error [ % ] 0.3 11 0.2
MKD
LBDS Audit, 28/ 01/ 2008 Gallet Eric, AB/ BT 9
MKD Comparison
LBDS Audit, 28/ 01/ 2008 Gallet Eric, AB/ BT 10