Transport for London, London Rail London Overground East London Railway & Stations Improvements Public Meeting: Naborhood Centre, Sydenham Road 14th March 2007 Introducing London Overground Dalston Curve NLR and ELR Connection;


  1. Transport for London, London Rail London Overground East London Railway & Stations Improvements Public Meeting: Naborhood Centre, Sydenham Road 14th March 2007

  2. Introducing ‘London Overground’ Dalston Curve NLR and ELR Connection; the Orbirail Network

  3. Overground - the regeneration railway Dalston Curve Brockley Honor Oak Park Forest Hill ELL Phase 2 (Uncommitted) Sydenham

  4. Station challenges Example: Sydenham, 2006 Poor waiting facilities and accommodations Difficult station access and poor signage Poor interior station layout (difficult access to ticket office) 4

  5. Overground stations • November 2007: TfL takes over existing North London stations • Four stage approach: � Enabling works/Oyster/Gating � Blitz clean � Refurbishment: includes upgraded information, help points and CCTV � Rebuild some stations • Lewisham stations served by London Overground : � Sydenham; Honor Oak Park; Brockley; Forest Hill; New Cross Gate; New Cross � Network Rail via the DfT funding under Access for All will introduce step free access • Improvement package for refurbished stations : better waiting facilities, better lighting, CCTV, help points, provision of Oyster validators and ticket vending machines 5

  6. New trains on London Overground • Contract awarded to Bombardier • £223M contract to deliver: – 20 x 4 car units (ELR) December 09 – 24 x 3 car units (NLR) December 08 • Constructed in Derby & maintained at New Cross Gate • Key features include: wider seats, wheelchair provision, CCTV, audio and visual real time information, wider gangway, better hand rail, air conditioning, walk through carriages, regenerative braking 6

  7. Overground infrastructure; East London Line Project • £40m Enabling Works finished January 2007 included bridge works, arch repairs and preparation of track formation • Main Works Contract let in October 2006, includes remainder of works including a dedicated new depot at New Cross Gate Line closure 22 nd December 2007 • • Re-opening to West Croydon and Crystal Palace by June 2010 • Link to Highbury & Islington secured 7

  8. Improved services on the East London Railway • Regular ELL services: 8 trains per hour, all day, and 7 days a week • Overground train stopping at all stations • Operating hours to match LU • Faster journey time to Canary Wharf (between 7 - 11 minutes saving) • Provide improved links to the Docklands , where demand is forecast to increase by circa 80% to 2016 8

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.