this presentation is for the project on us 10 and wis 65
play

This presentation is for the project on US 10 and WIS 65 in the - PowerPoint PPT Presentation

This presentation is for the project on US 10 and WIS 65 in the village of Ellsworth, Pierce County. Rather than holding an in-person meeting, public involvement efforts have moved online as a precaution against COVID-19 based on the most current


  1. This presentation is for the project on US 10 and WIS 65 in the village of Ellsworth, Pierce County. Rather than holding an in-person meeting, public involvement efforts have moved online as a precaution against COVID-19 based on the most current health information from state, federal and local health departments. All meeting materials, including the handout with a comment form, are posted on the design website for this project. https://wisconsindot.gov/Pages/projects/by-region/nw/us10wis65ellsworth/default.aspx If you have any questions, please contact WisDOT Project Supervisor James Koenig at (715) 838-8391.

  2. Public Involvement Meeting WIS 65 US 10 Village of Ellsworth Village of Ellsworth Main Street Maple Street WIS 65 to N. Beulah St. US 10 to Midway Ave.

  3. Project Team • James Koenig • WisDOT Project Supervisor • Brett Hollister • WisDOT Consultant Project Manager • Julie Martin • WisDOT Real Estate Specialist • Brad Halvensleben • Consultant Project Manager (KL Engineering, Inc.)

  4. Presentation Agenda • Project Location • Project Purpose and Need • Proposed Improvements • Construction Staging • Real Estate • Project Schedule • Contact Information

  5. Project Location

  6. Purpose and Need • Purpose  Improve US 10 and WIS 65 pavement condition  Improve truck turning at the US 10 and WIS 65 intersection  Upgrade curb ramps to meet current standards • Need  Deteriorating pavement condition  Conflicting truck turning movements at the US 10 and WIS 65 intersection  Non-compliant curb ramps

  7. Proposed Improvements • Resurface US 10 with asphalt pavement • Mill and resurface WIS 65 with asphalt pavment • Realign left-turn lanes at US 10 and WIS 65 intersection • Upgrade curb ramps • Replace pavement marking

  8. Proposed Construction Staging • 2021 construction season (June-October) • Open to traffic • Single-lane closures through flagging operations • Pedestrian detours during curb ramp replacement

  9. Real Estate • Real Estate acquisition for US 10 and WIS 65 intersection improvements • Temporary easements for curb ramp upgrades • Real Estate Acquisition Process • Contact: Julie Martin, (715) 836-2875 or julie.martin@dot.wi.gov

  10. Project Schedule • Environmental Document January 2020 • Preliminary Plans January 2020 • Real Estate Plat May 2020 • Public Involvement Virtual Presentation July 2020 • Final Plans November 2020 • Construction Summer 2021

  11. What we need from you Share Your Concerns or Comments https://wisconsindot.gov/Pages/projects/by-region/nw/us10wis65ellsworth/default.aspx Responses returned by Aug. 14, 2020 • By email: HollisterB@AyresAssocites.com • By mail: o James Koenig Wisconsin Department of Transportation 718 W. Clairemont Ave. Eau Claire, WI 54701 Thank you for your time

  12. Project Team • James Koenig, WisDOT Project Supervisor • (715) 838-8391 • james.koenig@dot.wi.gov • Brett Hollister, WisDOT Consultant Project Manager • (715) 834-3161 • HollisterB@AyresAssociates.com • Julie Martin, WisDOT Real Estate Specialist • (715) 836-2875 • julie.martin@dot.wi.gov • Brad Halvensleben, Consultant Project Manager • (608) 663-1218, Ext. 826 • bhalvensleben@klengineering.com

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend