WIS 96 Project Update
Tim Rank, Project Manager Jeremy Bartz, Project Leader
WisDOT
July 2020
WIS 96 Project Update Tim Rank, Project Manager Jeremy Bartz, - - PowerPoint PPT Presentation
WIS 96 Project Update Tim Rank, Project Manager Jeremy Bartz, Project Leader WisDOT July 2020 WIS 96 Overview Proposed Project Scope/Need Proposed Improvements Right-of-way Needs Traffic Control Schedule Resources
July 2020
footprint
found at the design website listed on the Resources slide.
footprint
found at the design website listed on the Resources slide.
temporary disturbance and sufficient work space to repair pipes
Wrightstown to allow grading and blending in of adjacent properties
right of way to place the sidewalk into WisDOT right of way for future maintenance needs
replacements
region/ne/96kauwrit/default.aspx
Region Construction Website
needs
an idea source as they plan for road construction in their area
together/default.aspx
Tim Rank, P.E. Project Manager WisDOT NE Region 944 Vanderperren Way Green Bay, WI 54304 Phone: (920) 360-2579 Email: tim.rank@dot.wi.gov Jeremy Bartz, P.E. Project Leader WisDOT NE Region 944 Vanderperren Way Green Bay, WI 54304 Phone: (920) 363-6356 Email: jeremy.bartz@dot.wi.gov