the construction of letaba tarentaal
play

The construction of Letaba Tarentaal 8km 132kV Kingbird line within - PowerPoint PPT Presentation

Tender Briefing session : 08 July 2020 Tender number: 59CON1943 : The construction of Letaba Tarentaal 8km 132kV Kingbird line within the Limpopo Operating Unit over a period of 6 months Tender number: 59CON1944 : The construction of a new


  1. Tender Briefing session : 08 July 2020 Tender number: 59CON1943 : The construction of Letaba – Tarentaal 8km 132kV Kingbird line within the Limpopo Operating Unit over a period of 6 months Tender number: 59CON1944 : The construction of a new 19 km, 132 kV Bersfort line for Merensky – Uchoba phase 2 within the Limpopo Operating Unit over a period of 12 months

  2. Eskom Values (ZIISCE) / Izimiso Ka-Eskom VALUE MEANING ISIMISO SISHO UKUTHINI ZERO HARM​ Eskom will strive to ensure that zero harm ZERO HARM U-Eskom uzoqhubeka nokulwela befalls its employees, contractors, the ukuqinisekisa ukuthi ukuphepha public and the natural environment. okupheleleyo lapho kwenziwa umsebenzi (Zero Harm) kuba yisikompilo kubasebenzi benkampani, osonkontilaki, umphakathi kanye nokunakekelwa kwemvelo yonkana. INTEGRITY Honesty of purpose, conduct and UBUQOTHO Ukwenza izinto ngokungaguquki, discipline in actions, and respect for ngendlela ekhuthaza ukwethenjelwa people. nokuzibophezela. INNOVATION Value-adding creativity and results IKHONO Ukwakha isimiso esivumela ukukhula oriented. Lead through excellence in LOKUQAMBA kwabantu abanamakhono. innovation. SINOBUNTU Caring. SINOBUNTU Ukuqhakambisa umusa nozwelo komunye nomunye. CUSTOMER A commitment to meet and strive to UKWANELISEKA Ukuzibophezela ukwenzela amakha- SATISFACTION exceed the needs of the receivers of KWAMAKHASIM- simende umsebenzi omuhle products and services. ENDE ngokuvelele nangokudlulele. EXCELLENCE Acknowledged by all for exceptional UBUHLE Ukuqhubeka ukulwela ukuba standards, performance and OBUVELELE ngophuma phambili ngokusebenza professionalism. ngendlela evelele nefaneleyo. 2020/07/10 2

  3. AGENDA Evacuation Procedure Welcome Commercial SDL&I Technical SHEQ NEC 3 and BOQ 2020/07/10 3

  4. Purpose of the clarification meeting • To assist the Tenderers on the requirements for this tender by explaining important information which will enable them to compile the tender documents accurately • To explain the implications of the evaluation process and the evaluation phases which the tender will be subjected to. 2020/07/10 4

  5. Details of the Enquiry • Description : The construction of Letaba – Tarentaal 8km 132kV Kingbird line within the Limpopo Operating Unit over a period of 6 months • Enquiry Number: 59con1943 • Closing Date: 27 July 2020 at 10h00 AM SAST (GMT+2) • This is a non-compulsory briefing session 2020/07/10 5

  6. Details of the Enquiry • Description : The construction of a new 19 km, 132 kV Bersfort line for Merensky – Uchoba phase 2 within the Limpopo Operating Unit over a period of 12 months • Enquiry Number: 59con1944 • Closing Date: 28 July 2020 at 10h00 AM SAST (GMT+2) • This is a non-compulsory briefing session 2020/07/10 6

  7. Details of the Enquiry cont.…… • Joint ventures will be allowed to participate on this tender in order to enable empowerment of the emerging entities . Each JV Entity needs to submit its proof of CSD Registration summary with the tender • NO LATE TENDERS WILL BE ACCEPTED . Only tenders submitted at the correct location and correct closing date and time will be accepted. Refer to page 5 of the Invitation to Tender under item 2.2 - 2.5 Tender Closing Information” . • Please note that due to the large volumes of submissions that are expected, it is advisable that you do not leave the dropping off your tender at the last minute. This may result in your tender not being received or being placed in the Tender Box by 10h00 on the closing date, in which case your tender will be considered late and not accepted. • Tenderers must submit the tender as a complete original tender, plus one (1) hard copy of the original tender at tender submission deadline. . Refer to page 6 of Invitation to tender item 2.9 - Copy of original tender • Where a Tenderer does not submit 1 hard copy of the original tender at tender submission deadline, the tenderer will be disqualified 2020/07/10 7

  8. Eskom Tender Bulletin and National Treasury etenders Portal Tender documentation can be downloaded from the following: 1. http://tenderbulletin.eskom.co.za/ 2. www.etenders.gov.za The documents included in the Eskom Tender bulletin and the National Treasury etenders portal for these tenders are as follows: 2020/07/10 8

  9. Tender documents 59con1943 – National Treasury tender portal 2020/07/10 9

  10. Continuation … Tender 59con1943 National Treasury portal 2020/07/10 10

  11. Tender documents 59con1943 – Eskom Tender bulletin portal 2020/07/10 11

  12. Continuation … Tender 59con1943 Eskom Tender bulletin 2020/07/10 12

  13. Continuation … Tender 59con1943 Eskom Tender bulletin 2020/07/10 13

  14. Continuation … Tender 59con1943 Eskom Tender bulletin 2020/07/10 14

  15. Tender documents 59con1944 – National Treasury 2020/07/10 15

  16. Continuation … Tender 59con1944 National Treasury portal 2020/07/10 16

  17. Tender documents 59con1944 – Eskom Tender bulletin portal 2020/07/10 17

  18. Continuation … Tender 59con1944 Eskom Tender bulletin 2020/07/10 18

  19. Continuation … Tender 59con1944 Eskom Tender bulletin 2020/07/10 19

  20. Continuation … Tender 59con1944 Eskom Tender bulletin 2020/07/10 20

  21. Stage 1 : Basic compliance will be conducted of the the following items Tender 59con1943 • Meet the eligibility criteria for a tenderer- refer to item 2.1 on page 4-5 of the invitation to tender document • Submitted two (2) hard copies; One original and one exact copy of the original tender to Eskom ; • Submission of the list of mandatory tender returnable documents; • Completed and signed declaration of authority form as attached with this tender / submit the signed resolution by the board confirming the duly authorised personnel to sign all documents in connection with this tender ; • CIDB registered / Proof of CIDB registration Electrical Engineering Works- Infrastructure (EP) level 6 or higher; • PART 2: PRICING DATA C2.2 the provisional bill of quantities as included in the NEC3 Engineering and Construction Contract (ECC) is mandatory for evaluation and should be fully completed (quote on all items ) and be submitted with this tender • Failure to quote on all items/ provide pricing for all items will render a tender non- responsive will be disqualified from further evaluations. 2020/07/10 21

  22. Continuation of stage 1 • Submitted proof of the registration on National Treasury’s Central Supplier Database (CSD) except Foreign Suppliers / or number MAAA ( ………………… )./ Where proof of CSD / or number MAAA is not submitted verification shall be done on the National Treasury CSD and if the tenderer is found not to be registered their tender will be commercially non-responsive. Non – responsive /Unacceptable tenders will be disqualified and all the responsive tenders will be evaluated further. 2020/07/10 22

  23. Stage 1 : Basic compliance will be conducted of the the following Tender 59con1944 • Meet the eligibility criteria for a tenderer- refer to item 2.1 on page 4-5 of the invitation to tender document • Submitted two (2) hard copies; One original and one exact copy of the original tender to Eskom ; • Submission of the list of mandatory tender returnable documents; • Completed and signed declaration of authority form as attached with this tender / submit the signed resolution by the board confirming the duly authorised personnel to sign all documents in connection with this tender ; • CIDB registered / Proof of CIDB registration Electrical Engineering Works- Infrastructure (EP) level 7 or higher; • PART 2: PRICING DATA C2.2 the provisional bill of quantities as included in the NEC3 Engineering and Construction Contract (ECC) is mandatory for evaluation and should be fully completed (quote on all items ) and be submitted with this tender • Failure to quote on all items/ provide pricing for all items will render a tender non- responsive will be disqualified from further evaluations. 2020/07/10 23

  24. Continuation of stage 1 • Submitted proof of the registration on National Treasury’s Central Supplier Database (CSD) except Foreign Suppliers / or number MAAA ( ………………… )./ Where proof of CSD / or number MAAA is not submitted verification shall be done on the National Treasury CSD and if the tenderer is found not to be registered their tender will be commercially non-responsive. Non – responsive /Unacceptable tenders will be disqualified and all the responsive tenders will be evaluated further. 2020/07/10 24

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend