The Company ARDECO was established by Engineers with long standing - - PDF document

the company
SMART_READER_LITE
LIVE PREVIEW

The Company ARDECO was established by Engineers with long standing - - PDF document

rail a r . DE . CO . rail arsenis design & construction a r . DE . CO . consulting engineers | rail experts The Company ARDECO was established by Engineers with long standing activity and experience in engineering,


slide-1
SLIDE 1

consulting engineers | rail experts

ar.DE.CO.

arsenis design & construction

τεχνική

ar.DE.CO.

rail rail

slide-2
SLIDE 2

The Company

ARDECO was established by Engineers with long standing activity and experience in engineering, construction and project management. ARDECO’s fjeld of expertise has expanded throughout the years and now covers a broad spectrum of Public and Private Projects. Main fjelds of expertise are shortly summarized below.

  • Design and Coordination of Track Works (Metro Projects):
  • DFD-Walkways in tunnel design, Concreted Tracks, Tunnel invert fjlling concrete, Elevated

Boardwalks, Signs & Markers.

  • Track Alignment (horiz. & vertical) incl. Ofgset proof (tunnel/stations/depot sections)
  • Installation drawings (concrete-ballast)
  • Embedded Networks Design (installation-routing)
  • Tunnel drainage design
  • Stray Current Grid Design
  • Turnout installation Drawings
  • Coordination of TW drawings
  • Special Designs (Transition Slabs, Bufger stop supports, Stinger supports, level crossings)
  • Floating Structures: Conceptual & Structural Analysis
  • Depot Special tracks (ballasted, embedded, on beams etc)
  • Specifjcation for 3rd Rail
  • Detailed 3rd rail Installation Design
  • Work Instructions – Method Statements
  • Bill of Quantities
  • Trackwork monitoring
  • CIVIL WORKS for Power Plants
  • Coordination of Construction Works (CW)
  • CW Project Management
  • CW Construction Management
  • R&D of Engineering Sofuware
slide-3
SLIDE 3

METRO PROJECTS

Trackworks & Tunnel Facilities Engineering

  • 1. Athens M

etro, Base project (1995-2002, 18km, 19 Stations)

  • 2. Athens Metro, Extensions to Eth.Amyna-Stavros, Dafni – lioupoli, Sepolia-

Agios Antonios, Monastiraki-Egaleo (2002-2007, 13.9km, 10 Stations)

  • 3. Athens Metro, Extensions to Anthoupoli, Ag.Marina, Elliniko (2006-2012,

8.5km, 8 Stations)

  • 4. Athens metro, Extension to Pireas (2012-Today, 8.5km, 6 Stations)
  • 5. Athens Metro, Sepolia Depot (1995-2002)
  • 6. Athens Metro, Eleonas Depot (2008-2010)
  • 7. Monitoring of Tracks in Line 3 part of tunnel towards Doukissis Plakentias

station, in the area of future Agia Paraskevi Station. (2007-2008)

  • 8. Thessaloniki Metro , Extension to Kalamaria (2013-Today, 4.8km, 5 Stations)

ar.DE.CO.

slide-4
SLIDE 4

PROJECT PRESENTATION

GENERAL DESCRIPRION OF THE PROJECT

PROJECT TITLE

ATHENS ΜΕΤΡΟ

PROJECT AREA

ATHENS – GREECE

PROJECT OWNER

ATTIKO METRO SA

TOTAL LENGTH

The total length of the Athens Metro network is currently 31km Double Track Tunnels and 34 Stations. There are also four (4) Depots (Sepolia, Stavros, Elinikon and Eleonas).

PROJECT MAIN CONTRACTORS

SIEMENS A.G., FCC Construccion S.A., ALSTOM TRANSPORT S.A., VINCI Grand Projects, AKTOR S.A , J&P-AVAX S.A., TERNA S.A., C.I.Kalogritsas S.A., ALPINE Bau GmbH

OUR SCOPE OF WORKS

All Track Works Studies
  • DFD-Walkways in tunnel design
  • DFD-Concreted Tracks
  • DFD-Tunnel invert fjlling concrete
  • DFD-Elevated Boardwalks
  • DFD-Signs & Markers
  • Track Alignment (horiz. & vertical)
  • Ofgset proof (tunnel/stations/depot sections)
  • Trackwork installation drawings (concrete-ballast)
  • Embedded Networks Design (installation-routing)
  • Tunnel drainage design
  • Stray Current Grid Design
  • Turnout installation Drawings
  • Coordination drawings
  • Special Designs (Transition Slabs, Bufger stop
supports, Stinger supports, level crossings)
  • Floating Structures: Conceptual & Structural
Analysis
  • Depot Special tracks (ballasted, embedded, on
beams etc)
  • Specifjcation for 3rd Rail
  • Detailed 3rd rail Installation Design
  • Work Instructions – Method Statements
  • Bill of Quantities
  • Monitoring of Tracks’ behavior, in Line 3 between
Ethniki Amyna Station and Doukissis Plakentias Station, in the area of the future Agia Paraskevi Station, during excavation works on the ground surface for the construction of Agia Paraskevi
  • Station. When track movement exceeded certain
limits, circulation was stopped for a period of 9 months until completion of works in the Station.
slide-5
SLIDE 5

PROJECT TITLE

THESSALONIKI ΜΕΤΡΟ – KALAMARIA EXTENSION

PROJECT AREA

THESSALONIKI – GREECE

PROJECT OWNER

ATTIKO METRO SA

PROJECT LENGTH

The length of Kalamaria extension is 9,6km Single Track Tunnels and 5 Stations.

PROJECT MAIN CONTRACTORS

AKTOR S.A.
slide-6
SLIDE 6

Main Clients

Client References SIEMENS A.G. (Germany) FCC Construccion S.A. (Spain) ALSTOM TRANSPORT S.A. (France) VINCI Construction Grands Project (France) AKTOR S.A. (Greece) J&P-AVAX S.A. (Greece) TERNA S.A. (Greece) C.I.KALOGRITSAS S.A. (Greece) ALPINE Bau GmbH (Austria) ELEMKA S.A. (Greece) DB International GmbH (Germany) DE Consult GmbH (Germany) ZIERL CONSULT ZT GmbH (Austria) D2S International GmbH (Belgium)

slide-7
SLIDE 7

consulting engineers | rail experts

rail power build soft

ar.DE.CO.

arsenis design & construction

τεχνική

ar.DE.CO.

rail

144, Marathonodromou str. | 15125 Maroussi - Athens | Greece | www.ardeco.gr
  • t. +30 210 6123452, +30 210 6143444 | f. +30 210 6123559 | e. info@ardeco.gr