stadium boulevard road reconstruction
play

Stadium Boulevard Road Reconstruction Public meeting December 2, - PowerPoint PPT Presentation

Stadium Boulevard Road Reconstruction Public meeting December 2, 2014 Agenda ! Welcome and introductions (15 min.) ! Presentation (15 min.) ! Project goals ! Rationale and activities related to each goal ! Public engagement overview ! Discussion


  1. Stadium Boulevard Road Reconstruction Public meeting December 2, 2014

  2. Agenda ! Welcome and introductions (15 min.) ! Presentation (15 min.) ! Project goals ! Rationale and activities related to each goal ! Public engagement overview ! Discussion (50 min.) ! Gather thoughts and ask questions at tables ! Reconvene as large group to report-out and discuss ! Timeline and next steps (10 min.) Stadium Boulevard Reconstruction Project 2

  3. Project Goals 1. Road reconstruction – Stadium Boulevard from Hutchins to Kipke – Potter and Prescott, as a result of utility work 2. Underground utility improvements – Water mains (clean drinking water) – Stormwater management 3. Non-motorized amenities under consideration – Bike lanes in the roadway – Mid-block crossings – Sidewalk installation on south side of E. Stadium Stadium Boulevard Reconstruction Project 3

  4. Stadium Boulevard: Hutchins to Kipke STADIUM BOULEVARD RECONSTRUCTION PROJECT VICINITY DRAWING (File No. 2014-035) 30" Watermain work - may include roadway reconstuction Stadium Blvd Reconstruction feet 4000 km 1 Stadium Boulevard Reconstruction Project 4

  5. Goal 1: Road Reconstruction ! Rationale: - Improve the quality of the road surface from Hutchins to Kipke - Bring this remaining stretch of Stadium Boulevard up to current standards ! Activities: - Total road reconstruction, including sub-base - Adjust lane alignment and fine tune curb lines ! Guiding Standards: - American Association of State Highway Transportation Officials policies - City of Ann Arbor Complete Streets policy - Americans with Disabilities Act Stadium Boulevard Reconstruction Project 5

  6. Stadium Boulevard Road Surface Stadium Boulevard Reconstruction Project 6

  7. Goal 2: Underground Utility Work ! Rationale: – Improve quality, reduce the rate of release of stormwater in the area – Address capacity needs and poor condition of water mains (raw water, drinking water) ! Activities: – Provide underground storage for stormwater – Replace, up-size, and re-route water mains* ! Guiding Standards: – Ann Arbor Code of Ordinances Chapter 63: Storm Water Management and Soil Erosion and Sedimentation Control – National Pollutant Discharge Elimination System *Note: neighborhood streets Potter and Prescott are likely to require reconstruction as a result of water main re-routing Stadium Boulevard Reconstruction Project 7

  8. Water Main Upgrade Needed Stadium Boulevard Reconstruction Project 8

  9. Goal 3: Non-Motorized Amenities ! Rationale: – Improve safety and access for pedestrians, cyclists ! Activities: – Provide for visible, accessible mid-block crossings at logical intervals – Accommodate bike lanes within roadway – Studying the elimination of existing sidewalk gap on south side of Stadium Boulevard, near the UM football stadium ! Guiding Standards: - American Association of State Highway Transportation Officials policies - City of Ann Arbor Complete Streets policy – City of Ann Arbor Non-Motorized Plan – Americans with Disabilities Act Stadium Boulevard Reconstruction Project 9

  10. South Side of Stadium Boulevard Stadium Boulevard Reconstruction Project 10

  11. Public Engagement Overview ! Stakeholder engagement – University of Michigan – Ann Arbor Public Schools – Ann Arbor Golf & Outing Club – AAATA – Local public safety/law enforcement organizations – Pedestrian Safety and Access Task Force – Washtenaw Biking and Walking Coalition – Adjacent residential and business communities ! Public meetings (three planned) ! Outreach to adjacent residential and business communities is ongoing Stadium Boulevard Reconstruction Project 11

  12. Discussion 1. Construction impacts 2. Underground utilities 3. Non-motorized amenities 4. Other questions, concerns, suggestions? Process: ! Table discussions on the above topics (25 min.) ! Report-out and discuss as one group (25 min.) Stadium Boulevard Reconstruction Project 12

  13. Proposed Timeline ! Stakeholder engagement: ongoing throughout ! First public meeting: December 2, 2014 ! Preliminary design drawings ! Second public meeting: February 2015 - Share preliminary design; gather feedback ! Complete final design ! Final public meeting: TBD - Share final design, construction plans, contact information ! Construction bidding process ! Construction: 2016-2017 Stadium Boulevard Reconstruction Project 13

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.