space florida board of directors meeting
play

SPACE FLORIDA BOARD OF DIRECTORS MEETING April 23, 2020 By - PowerPoint PPT Presentation

SPACE FLORIDA BOARD OF DIRECTORS MEETING April 23, 2020 By Phone-Conference Slide 1 CALL TO ORDER Slide 2 PLEDGE OF ALLEGIANCE Slide 3 ROLL CALL Slide 4 WELCOME & INTRODUCTIONS Slide 5 PUBLIC COMMENTS Slide 6 BUSINESS BEFORE


  1. SPACE FLORIDA BOARD OF DIRECTORS MEETING April 23, 2020 By Phone-Conference Slide 1

  2. CALL TO ORDER Slide 2

  3. PLEDGE OF ALLEGIANCE Slide 3

  4. ROLL CALL Slide 4

  5. WELCOME & INTRODUCTIONS Slide 5

  6. PUBLIC COMMENTS Slide 6

  7. BUSINESS BEFORE THE BOARD Slide 7

  8. APPROVAL OF MINUTES • January 16, 2020 Slide 8

  9. INVESTMENT COMMITTEE REPORT Jay Beyrouti (Chair), Belinda Keiser and Mori Hosseini • Meeting (By Phone Conference) April 7, 2020 Slide 9

  10. CONTRACTS, BUSINESS DEVELOPMENT AND PROJECT ACTIVITIES Slide 10

  11. DEAL RELATED PROJECTS: ITEMS 1 & 2 Project Beach House • $80M Conduit Debt Transaction in vicinity of Exploration Park • Jobs Impacted: 200 • $200,000 by Space Florida for Environmental Assessment Project Bed and Breakfast • Up to $4M Bridge Loan – Developmental Aerospace Company • Credit-enhanced • 12 Month Term Slide 11

  12. DEAL RELATED PROJECTS: ITEMS 3 & 4 Project – Made in Space, Inc. • Modification of three (3) Secured Loan Agreements; each for $1M • Transfer of Loan Security from Tangible Capital to Intangible • On completion of Due Diligence, Authority to enable Space Florida Conversion of Debt Agreements to Equity Project Beverly • Aviation Maintenance and Pilot Training Company Company • Conduit-Finance (up to $72M) and Synthetic Lease Structure for five (5) Flight Simulators • Strengthening of Company’s Florida Facilities and Job retention Slide 12

  13. PNC BANK LOAC: ITEM 5 PNC Bank Loan • Authorization for short term extension Slide 13

  14. BUSINESS DEVELOPMENT SUPPORT: ITEM 6 Venture X Group, Inc. • Business Development and Finance Support • Initial Contract - Board approved in July 2019 • Extension of contract – six months ($97,500) Slide 14

  15. SLLF BLOCK 1 & UTILITY CORRIDOR: ITEM 7 NORTHFIELD (RUSH) SOUTHFIELD (MIDDLESEX) Wetland Mitigation Areas Northfield Utility Corridor Southfield Utility Corridor Site 2 (45 leasable acres) Site 1 (28 leasable acres) Wetland enhancement C15/T-17 Sites A & O (40 leasable acres) Wetland creation area Sites A&O 40 AC Slide 15

  16. PROJECT EDTPF: ITEM 8 Project Panther route improvements for transport of large Blue Origin flight hardware elements. Modifies roadway areas at 27 locations across the Cape: Signalization: Chinchor Electric Roadways/Shoulders: Bid on APRIL 16 7 Signalized intersections • Widens roadways (shoulders • and intersection turns) Blue Origin Manufacturing • to SLC-36 (+/- 23 miles) Port Canaveral to SLC-36 • (+/- 7 miles) Slide 16

  17. PRESIDENT’S REPORT Key Events Since Last Board Meeting: - COVID 19 Response - Latest News and Events - Business Development - Spaceport Operations - Indian River Bridge Update - Space Force Update Looking Ahead: Strategies 2020 and Beyond 2020 Launch Activity to date and Upcoming Launch Events Slide 17

  18. FOCUS SINCE LAST BOARD MEETING COVID 19 Response: Initial Focus: Continuity of Operations • Safety of Staff and Tenants • Mission Requirements for Project Activities and Operations • Risk Management and Protection of Financials Current Focus: Economic Recovery • Survey critical Aerospace Skills needs • Identify critical Supply Chain disruptions New Initiatives to Accelerate Economic Recovery Slide 18

  19. KEY EVENTS SINCE LAST BOARD MEETING Latest Space Florida News & Events: Space Day: February 12, 2020 27 th Annual Space Day – Tallahassee • • 60+ Visits with key legislators and agency heads • Over 80+ industry representatives supporting Annual Update for Brevard County Commission: • Presentation and Q&A – February 25, 2020 • Regional updates planned for the future! Brazil: Letter of Intent with EMBRAPII entered on March 9, 2020 • EMBRAPII – Principal Agency for Brazil’s Innovation, Research and Technology Funding • Letter of Intent to explore joint collaboration opportunities Slide 19

  20. FOCUS SINCE LAST BOARD MEETING Business Development: Deal Activity: • Pipeline Management: 50 active – 5 tiers • 10 – 12 (Term Sheets, Docs, or Finance) Statewide Focus: Ground Infrastructure • Aviation Manufacturing & MRO, Simulation & Training • Strengthening Depth of Supply Chain • Space Systems manufacturing and support Future Areas: Space Segment/Public Infrastructure Slide 20

  21. FOCUS SINCE LAST BOARD MEETING Spaceport Operations/Development: Spaceport Operations Activity: • Ground Vehicle Testing -- Tesla, Honda-Andretti, Daimler • Spacecraft / Hardware Transit -- Antonov, Guppy, C-130 • Starfighters and other Aviation flight-vehicles Spaceport Development – Construction: • Power and Utilities • Launch Operations Support • Facilities and Tenant Support Future: Increase in Capability and Capacity Services Slide 21

  22. UPDATE ON INDIAN RIVER BRIDGE Indian River Bridge Component: • Project Development and Environment (PD&E) Study (PD&E) Completed 10 April 2020  2.5 year effort funded by NASA • Indian River Bridge MOA Executed between Federal Highways – FDOT – NASA KSC • Bridge Design – 30% Complete (May 2021 – Design & Permitting estimated complete) • Construction planned complete in 2024 Space Commerce Way Component: • Environmental Characterization in Progress • Design & Permitting Solicitation in work • Working construction statement of work with District 5 Technical Support Infrastructure for Rebuilding America (INFRA) Grant: • SF – FDOT Secretary monthly tag-ups in place • Project flow plans in development (District 5 & Space Florida / KSC included when rough draft completed • Routine engagement with Stakeholder in place • Moving forward with INFRA Grant project plan execution Slide 22

  23. UPDATE ON US SPACE COMMAND I AM CONVINCED THAT IN THE FUTURE, IF WE ARE GOING TO GET INTO A CONFLCIT … WE ARE GOING TO FIGHT AND WIN FOR SPACE SUPERIORITY - GEN John Raymond, Commander US Space Command FLORIDA’S SUPPORT TO THE SPACE WARRIORS FOCUS: SIGNIFICANT USSPACECOM MILESTONES: Stakeholder Engagement Program (SEP) • Shifted to VTCs from community visits • POTUS Directs Establishment of USSF - 19 FEB • Virtual Tampa SEP held on April 8 2019 • Establishing Task Force to develop FL offering in cyber security realm to DoD, Space Force • US Space Force Established - 20 DEC 2019 • Cyber Security meeting in planning for late April/May • Upcoming SEP Engagements • US Space Force Organizational Plan - 2 FEB 2020  Florida University & South Florida events in planning • USSPACECOM HQ Basing Re-assessment - 4 Mission Capability Focus Area  MAR 2020  Training & Readiness Division • New USSPACECOM Basing Criteria - Late Spring  Heavy Lift / Launch / Logistics’ 2020  Cyber Security  Hypersonics (Platforms & Weapons) • Draft USSF Doctrine Release - Late Spring 2020 Artificial Intelligence   Quality of Life / Florida as Most Military State (FDSTF) Slide 23

  24. LOOKING AHEAD: 2020 AND DECADE BEYOND • Opportunities in New Space / Cis-Lunar Economy: • Transportation and Space Access • Satellite and Space Platforms • Ground Systems and Support • Telecommunications / Data / Global Connectivity • Earth Observation and Data-derived Awareness • On-Orbit and Lunar Operations and Support Services • An Estimated 12,000 New Satellites/Space Operations Platforms Deployed: “The Space Segment” • New Decade of On-Orbit and Lunar Research, Manufacturing and Value-Added Products & Services Slide 24

  25. 2030 VISION AND HOW WE WILL GET THERE “Florida as Global Leader in Enabling Commercial Space” 1. Execute on Strategies in Three Key Goal areas: • Industry Growth • Industry Leadership / Positioning • Spaceport Leadership Standing 2. Achieve a “Five Times Growth” of Portfolio Value by 2030 3. Work to Integrate and Position Florida’s Spaceport, Regional Logistics and Trade System as “An Inter-Stellar Trade-Port” and Principal Enabler of the Cis-Lunar Economy Slide 25

  26. 2020 LAUNCH ACTIVITY TO DATE Eight launches (January – April) Six - Falcon 9 Launches: • Four SpaceX Starlink flights (60 satellites each) • Crew Dragon In-Flight Abort test 20 th Space Station cargo resupply flight • • Booster landings 3 of 5 successful - including 50 th successful booster landing Two - Atlas V Launches: • Solar Orbiter NASA science probe AEHF-6 (1 st Space Force launch) • Slide 26

  27. REMAINING 2020 LAUNCH ACTIVITY Launch Activity: “Mission - Essential Operations” 35 Launches currently manifested for the remainder of 2020, including: • Atlas V 501: USSF X-37B Orbital Spaceplane May 16 • Delta IV Heavy: NROL - 44 Classified Satellite June 3 Falcon 9: GPS III-3 USSF 3 rd Generation Navigation Satellite (mid-June) • • Falcon 9: Six different Starlink batches of 60 Satellites each for SpaceX Significant Events: • First Crew Dragon with astronauts aboard, to ISS (May 2020) • Falcon 9 Polar Orbit Mission (June 2020) Slide 27

  28. OPEN DISCUSSION Slide 28

  29. CLOSING REMARKS Slide 29

  30. ADJOURN Slide 30

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend