Site Plan Review Committee #1 May 16, 2019 Verizon Site Project - PowerPoint PPT Presentation

Site Plan Review Committee #1 May 16, 2019 Verizon Site Project Site Plan #244 Rezoning 400 11th Street South Presentation Outline Land Use and Zoning Site Background Proposal Summary Crystal City Sector Plan Guidance


  1. Site Plan Review Committee #1 May 16, 2019 Verizon Site Project Site Plan #244 Rezoning 400 11th Street South

  2. Presentation Outline ▪ Land Use and Zoning ▪ Site Background ▪ Proposal Summary ▪ Crystal City Sector Plan Guidance ▪ Preliminary Issues ▪ Next Steps 2

  3. Site Lenox Club The Point at SP #268 The Altaire Pentagon City SP #110 SP #2 The Bartlett SP #105 PenPlace SP #105 3

  4. General Land Use Plan GLUP Designation: “High” Office Apartment Hotel 4

  5. Zoning Existing Zoning: “ R-H- 3.2” Multiple -Family Dwelling and Hotel District Proposed Zoning: “ C- O Crystal City” Mixed Use Crystal City District 5

  6. Background ▪ Existing Development – Verizon telecommunications facility building – Surface parking lot ▪ Subject to Site Plan #244 – Approved by the County Board on September 6, 1986 – Permitted construction of the Verizon telecommunications building and included conceptual approval for a future-phase residential development 6

  7. Proposal ▪ Rezoning from “R -H- 3.2” to ▪ Project Information: “C - O Crystal City” – 40,101 sf site area – Vacation of portion of old ▪ New 19-story multifamily South Eads Street residential building – 276,276 sf of total GFA – 306 units (260,282 sf) – Total 6.57 FAR – 10,653 sf of ground floor retail – 200-foot building height – 149 parking spaces (10 visitor spaces) 7

  8. Modifications ▪ Residential parking ratio – 0.44 spaces per unit (separate 0.05 ratio for visitor spaces) ▪ Required loading – from two to one residential loading spaces (two total loading spaces provided) ▪ Additional density as provided under C-O Crystal City and Section 15.5 of the Zoning Ordinance – Green building bonus density for LEED Silver certification + 2 Priority Credits: 0.30 FAR – Bonus density for affordable housing (density above GLUP) – Off-site open space and infrastructure improvements 8

  9. Project Layout Vacation Area Areas of note: County ▪ County owned land Owned Land (“Teardrop Parcel” and Eads Verizon Street ROW) Building ▪ Vacation area (469 sf) ▪ Existing Verizon Building to remain 9

  10. Crystal City Sector Plan 10

  11. The Altaire (SP #2) – January 2015 11

  12. Crystal City Sector Plan 12

  13. Crystal City Sector Plan Building Design Guidelines Required Building Frontage ▪ Encroachments ▪ Podium Height ▪ Architectural Features Encroachment ▪ Podium Separation Requirement ▪ Base Frontage ▪ Top of the Podium ▪ Location of Parking in Podiums ▪ Tower Separation ▪ Tower Coverage ▪ Forming Towers ▪ Building Tops ▪ Mechanical Penthouse ▪ Building Setback Profiles ▪ 13

  14. Crystal City Sector Plan 14

  15. Crystal City Sector Plan 15

  16. Preliminary Issues ▪ Proposed drop-off lane on the south side of 11th Street is not supported by staff ▪ A residential loading bay modification is needed (from two to one residential bays; two bays are proposed for residential and retail uses) ▪ Ground floor density exclusions are shown on plans and not supported by staff ▪ Future use of adjacent County owned parcel and Eads Street ROW, and larger “Teardrop Parcel” area to the north, to be determined ▪ Improvements to 11th Street S. streetscape need further discussion to meet streetscape standards and as a potential link between north and south “open space” areas 16

  17. “Teardrop Parcel” ▪ Future use determination of County owned property and right-of-way necessary ▪ SPRC identified as appropriate process concurrent with Verizon Site project ▪ Additional background, guidance, and recommendation to be provided at the next SPRC meeting 17

  18. Process Schedule Items for Discussion at Future Meetings: ▪ SPRC #2 – June 13 – Use Determination of County Owned Land – Open Space and Landscaping – Community Benefits ▪ SPRC #3 – July 18 – Transportation and Site Circulation – Parking – Construction Issues – Design Changes and Wrap-Up 18

  19. Thank You 19

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.