Site Plan Review Committee #1 May 16, 2019 Verizon Site Project - - PowerPoint PPT Presentation

site plan review committee 1
SMART_READER_LITE
LIVE PREVIEW

Site Plan Review Committee #1 May 16, 2019 Verizon Site Project - - PowerPoint PPT Presentation

Site Plan Review Committee #1 May 16, 2019 Verizon Site Project Site Plan #244 Rezoning 400 11th Street South Presentation Outline Land Use and Zoning Site Background Proposal Summary Crystal City Sector Plan Guidance


slide-1
SLIDE 1

May 16, 2019

Site Plan Review Committee #1

400 11th Street South

Site Plan #244 Rezoning

Verizon Site Project

slide-2
SLIDE 2

2

Presentation Outline

▪ Land Use and Zoning ▪ Site Background ▪ Proposal Summary ▪ Crystal City Sector Plan Guidance ▪ Preliminary Issues ▪ Next Steps

slide-3
SLIDE 3

3

Site

PenPlace SP #105 The Altaire SP #2 The Bartlett SP #105 Lenox Club SP #268 The Point at Pentagon City SP #110

slide-4
SLIDE 4

4

General Land Use Plan

GLUP Designation: “High” Office Apartment Hotel

slide-5
SLIDE 5

5

Zoning

Existing Zoning: “R-H-3.2” Multiple-Family Dwelling and Hotel District Proposed Zoning: “C-O Crystal City” Mixed Use Crystal City District

slide-6
SLIDE 6

6

Background

▪ Existing Development

– Verizon telecommunications facility building – Surface parking lot

▪ Subject to Site Plan #244

– Approved by the County Board on September 6, 1986 – Permitted construction of the Verizon telecommunications building and included conceptual approval for a future-phase residential development

slide-7
SLIDE 7

7

Proposal

▪ Rezoning from “R-H-3.2” to “C-O Crystal City” ▪ New 19-story multifamily residential building

– 306 units (260,282 sf) – 10,653 sf of ground floor retail – 149 parking spaces (10 visitor spaces)

▪ Project Information:

– 40,101 sf site area – Vacation of portion of old South Eads Street – 276,276 sf of total GFA – Total 6.57 FAR – 200-foot building height

slide-8
SLIDE 8

8

Modifications

▪ Residential parking ratio

– 0.44 spaces per unit (separate 0.05 ratio for visitor spaces)

▪ Required loading

– from two to one residential loading spaces (two total loading spaces provided)

▪ Additional density as provided under C-O Crystal City and Section 15.5 of the Zoning Ordinance

– Green building bonus density for LEED Silver certification + 2 Priority Credits: 0.30 FAR – Bonus density for affordable housing (density above GLUP) – Off-site open space and infrastructure improvements

slide-9
SLIDE 9

9

Project Layout

Areas of note: ▪ County owned land (“Teardrop Parcel” and Eads Street ROW) ▪ Vacation area (469 sf) ▪ Existing Verizon Building to remain

County Owned Land Verizon Building Vacation Area

slide-10
SLIDE 10

10

Crystal City Sector Plan

slide-11
SLIDE 11

11

The Altaire (SP #2) – January 2015

slide-12
SLIDE 12

12

Crystal City Sector Plan

slide-13
SLIDE 13

13

Crystal City Sector Plan

Building Design Guidelines ▪ Required Building Frontage ▪ Encroachments ▪ Podium Height ▪ Architectural Features Encroachment ▪ Podium Separation Requirement ▪ Base Frontage ▪ Top of the Podium ▪ Location of Parking in Podiums ▪ Tower Separation ▪ Tower Coverage ▪ Forming Towers ▪ Building Tops ▪ Mechanical Penthouse ▪ Building Setback Profiles

slide-14
SLIDE 14

14

Crystal City Sector Plan

slide-15
SLIDE 15

15

Crystal City Sector Plan

slide-16
SLIDE 16

16

Preliminary Issues

▪ Proposed drop-off lane on the south side of 11th Street is not supported by staff ▪ A residential loading bay modification is needed (from two to one residential bays; two bays are proposed for residential and retail uses) ▪ Ground floor density exclusions are shown on plans and not supported by staff ▪ Future use of adjacent County owned parcel and Eads Street ROW, and larger “Teardrop Parcel” area to the north, to be determined ▪ Improvements to 11th Street S. streetscape need further discussion to meet streetscape standards and as a potential link between north and south “open space” areas

slide-17
SLIDE 17

17

“Teardrop Parcel”

▪ Future use determination of County owned property and right-of-way necessary ▪ SPRC identified as appropriate process concurrent with Verizon Site project ▪ Additional background, guidance, and recommendation to be provided at the next SPRC meeting

slide-18
SLIDE 18

18

Process Schedule

Items for Discussion at Future Meetings: ▪ SPRC #2 – June 13

– Use Determination of County Owned Land – Open Space and Landscaping – Community Benefits

▪ SPRC #3 – July 18

– Transportation and Site Circulation – Parking – Construction Issues – Design Changes and Wrap-Up

slide-19
SLIDE 19

19

Thank You