Rockaway Boardwalk Reconstruction CB14 Parks Committee Meeting November 18, 2013 7:00 P.M. Knights of Columbus Agenda Recap Community Meetings To Date Surface Treatment Survey Results Initial Construction Area Scope of Work


slide-1
SLIDE 1

Rockaway Boardwalk Reconstruction

CB14 Parks Committee Meeting

November 18, 2013 7:00 P.M. Knights of Columbus

slide-2
SLIDE 2

2

Agenda

Rockaway Reconstruction

  • Recap
  • Community Meetings To Date
  • Surface Treatment Survey Results
  • Initial Construction Area
  • Scope of Work
  • Project Area Schematic and Renderings
  • Amenities
  • Surface Treatment Concepts
slide-3
SLIDE 3

3

Previous Community Meetings

Rockaway Reconstruction

Meeting Date September 17, 2013 CB14 Parks Committee Presentation – Background and Constraints September 23, 24, 25, 2013 Neighborhood Listening Sessions – Access, Surface, Recreation and Boardwalk Design October 8, 2013 Full CB 14 Meeting – Update and General Design Principles October 23, 2013 Community Listening Session – Access, Surface and Amenities

slide-4
SLIDE 4

4 Rockaway Reconstruction

Surface Survey Results

680 Respondents

50 100 150 200 250 300 Feel on your feet/roughness Ability to stay cool/temperature Unique Identity

Walking down the boardwalk, which of the following would you rate as most important? Please choose 1.

slide-5
SLIDE 5

50 100 150 200 250 300 350 400 450 Bright Color Sparkle Special Material (shells

  • r glass)

Sandy Memorial (examples on boards)

5 Rockaway Reconstruction

If you had to choose a way to highlight special areas of the boardwalk, what would be your top choice? Please choose 1 or 2.

Surface Survey Results

680 Respondents

slide-6
SLIDE 6

50 100 150 200 250 300 350 400 450 Lighter (cooler but with more glare) Darker (warmer but less glare)

6 Rockaway Reconstruction

Which color preference is more important? Please choose 1.

Surface Survey Results

680 Respondents

slide-7
SLIDE 7

7 Rockaway Reconstruction

For special areas, which do you prefer for decorative finish? Please choose 1.

50 100 150 200 250 300 350 400 Tumbled Recycled Glass Colored Stone

Surface Survey Results

680 Respondents

slide-8
SLIDE 8

8 Rockaway Reconstruction

50 100 150 200 250 300 350 Entrances Playgrounds Sitting areas 10 20 30 40 50 60

What types of areas should have special accents (e.g. playgrounds, sitting areas, entrances, etc.) Please choose 1 or 2.

Surface Survey Results

680 Respondents

slide-9
SLIDE 9

50 100 150 200 250 300 350 Designated bike lane Informal bike lane Yes, bike lane No bike lane

9 Rockaway Reconstruction

Would you like to have a designated bike lane (marked with striped or special paving) or an informal bike lane (with just signs)?

Surface Survey Results

680 Respondents

slide-10
SLIDE 10

10 Rockaway Reconstruction

50 100 150 200 250 300 350

Positive Negative Mixed

Overall Aesthetics Durability Texture Walking, Jogging, and Biking

Do you like the existing precast planks on the boardwalk between Beach 77 and Beach 81? Why or why not?

Surface Survey Results

680 Respondents

slide-11
SLIDE 11

11

Initial Construction Area Overall Site Plan

Rockaway Reconstruction

slide-12
SLIDE 12

12

Boardwalk Accent Preliminary Concepts Option A: Graphic Text Design

Rockaway Reconstruction

slide-13
SLIDE 13

13

Boardwalk Accent Preliminary Concepts Option B: Bubble Design

Rockaway Reconstruction

slide-14
SLIDE 14

14

Boardwalk Accent Preliminary Concepts Option C: Wave Design

Rockaway Reconstruction

slide-15
SLIDE 15

15

Boardwalk Accent Preliminary Concepts Option A: Graphic Text Design

Rockaway Reconstruction

slide-16
SLIDE 16

16

Boardwalk Accent Preliminary Concepts Option A: Graphic Text Design

Rockaway Reconstruction

slide-17
SLIDE 17

17

Boardwalk Accent Preliminary Concepts Option A: Graphic Text Design

Rockaway Reconstruction

slide-18
SLIDE 18

18

Boardwalk Accent Preliminary Concepts Option A: Graphic Text Design

Rockaway Reconstruction

slide-19
SLIDE 19

19

Boardwalk Accent Preliminary Concepts Option B: Bubble Design

Rockaway Reconstruction

slide-20
SLIDE 20

20

Boardwalk Accent Preliminary Concepts Option B: Bubble Design

Rockaway Reconstruction

slide-21
SLIDE 21

21

Boardwalk Accent Preliminary Concepts Option B: Bubble Design

Rockaway Reconstruction

slide-22
SLIDE 22

22

Boardwalk Accent Preliminary Concepts Option C: Wave Design

Rockaway Reconstruction

slide-23
SLIDE 23

23

Boardwalk Accent Preliminary Concepts Option C: Wave Design

Rockaway Reconstruction

slide-24
SLIDE 24

24

Boardwalk Accent Preliminary Concepts Option C: Wave Design

Rockaway Reconstruction

slide-25
SLIDE 25

Boardwalk Lighting Height Options

Rockaway Reconstruction

Lighting Option: 30’ Davit Pole

slide-26
SLIDE 26

Boardwalk Lighting Height Options

Lighting Option: 16’ Davit Pole

Rockaway Reconstruction

slide-27
SLIDE 27

27

Lighting Options

Rockaway Reconstruction

City Light LED Fixture Solar LED Lighting Davit Pole with LED Cobra Head TBTA Pole

slide-28
SLIDE 28

28

Lighting Option Davit Pole with Cobra Head

Rockaway Reconstruction

slide-29
SLIDE 29

29

Lighting Option TBTA Pole with Teardrop Head

Rockaway Reconstruction

slide-30
SLIDE 30

30

Lighting Option City Light

Rockaway Reconstruction

slide-31
SLIDE 31

31

Lighting Option Solar Swan – 25’

Rockaway Reconstruction

slide-32
SLIDE 32

32

Lighting Option Solar Swan – 15’

Rockaway Reconstruction

slide-33
SLIDE 33

33

Boardwalk Elevation Initial Construction Area

Rockaway Reconstruction

slide-34
SLIDE 34

34

Boardwalk Construction Engineering Elements

Rockaway Reconstruction

slide-35
SLIDE 35

35

Boardwalk Construction Pile Cap Removal and Pile Extensions

Rockaway Reconstruction

Demolition of Existing Pile Cap Pile Cap Extension Detail

slide-36
SLIDE 36

36

Boardwalk Construction Engineering Elements

Rockaway Reconstruction

slide-37
SLIDE 37

37

Benches

Rockaway Reconstruction

1964 World’s Fair Bench with RPL Slats and Galvanized Steel Legs 1964 World’s Fair Backless Bench with RPL Slats and Galvanized Steel Legs

slide-38
SLIDE 38

38

Drinking Fountains

Rockaway Reconstruction

Haws Fountain WXY Prototype as seen at Transmitter Park

slide-39
SLIDE 39

39

Foot Showers

Rockaway Reconstruction

slide-40
SLIDE 40

40

Railing Options

Rockaway Reconstruction

Pipe Railing – Potential for South Side DPR Standard Rail

slide-41
SLIDE 41

41

Bike Racks

Rockaway Reconstruction

DPR Standard Bike Rack

slide-42
SLIDE 42

42

Trash Receptacles

Rockaway Reconstruction

Trash and Recycle Receptacles

slide-43
SLIDE 43

43

Questions and Discussion