Regulatory Framework for Decommissioning of RRs in Indonesia

The IAEA 1st Meeting on the Research Reactor Decommissioning Demonstration Project

( R2D2P )

Manila, 26 - 30 June 2006

  • K. HUDA and N. NABABAN

Introduction

There are three research reactors:

  • Bandung Triga 2000 Reactor (2000 kW);
  • Kartini Reactor (100 kW);
  • Siwabessy Multipurpose Reactor (30,000 kW).

Operator: National Nuclear Energy Agency (BATAN) Regulator: Nuclear Energy Regulatory Agency (BAPETEN)

slide-2
SLIDE 2

2

Data of Research Reactors

Reactor Bandung Triga 2000 Kartini Reactor Siwabessy Reactor Power [kW] 2000 100 30,000 Type Triga II Triga II MTR Fuel UO2 UO2 U3Si2-Al (plate) First Critical Year 1964 Year 1979 Year 1987 Operator BATAN BATAN BATAN Application Res., Train., and Isot. Prod. Research and training Res., Train., and Isot. Prod. Location Bandung Yogyakarta Serpong

HIERARCHY OF LAW

Fundamental Law Constitution 1945 Act Act No. 10/1997 Governmental Regulation GR No 63, 26, 27 Presidential Decree

  • BAPETEN Chairman Decree

BCD No. 05, 07, 10 Guidelines Guideline on Decomm.

Regulatory Framework

slide-3
SLIDE 3

3

Regulatory Body (structure)

President of the Republic of Indonesia

Executive Secretary

Center for Regulatory Assessment

  • f Nuclear Installation and Materials

Directorate for Regulatory Development of Nuclear Installation and Materials

Deputy for Nuclear Safety Assessment

Directorate for Inspection of Nuclear Installation and Materials Directorate for Licensing of Nuclear Installation and Materials

Deputy for Licensing and Inspection Internal Oversight

Chairman of BAPETEN

STEPS OF LICENSING

  • Site Evaluation (Site Approval)
  • Construction (Construction Permit)
  • Commissioning (Comm. Permit)
  • Operation (Operation License)
  • Decommissioning (Decommissioning

Permit)

slide-4
SLIDE 4

4

OPERATOR BAPETEN

DECOMMISIONING

Decommissioning Permit 4 1 2 3 2 1 3 2 4 Preparation Of Decommissioning Program REVIEW DECOMMISSIONING Revision Of Decommissioning Program Time Frame

List of Relevant Regulations

Guide on emergency response planning

  • G. No. 05-P/2003

Guide on decomm. of research reactor (plan.)

  • G. No. --------------

Safety provision on decommissioning of RR (plan.) BCD No. ----------- Safety provision on operation of research reactor BCD No. 10/1999 Quality Assurance on nuclear installation BCD No. 07/1999 Safety provision on working against radiation BCD No. 01/1999 Licensing on nuclear reactor (final draft)

  • GR. No. ------------

Radioactive waste management

  • GR. No. 27/2002

Safety and health against the utilization of rad.

  • GR. No. 63/2000

Nuclear Energy

  • Act. No. 10/1997

TOPICS NUMBER/YEAR

slide-5
SLIDE 5

5

Conclusions

  • There are three research reactors operating in
  • Indonesia. All the reactors are operated by

BATAN;

  • Any activity relating to construction and
  • peration, including decommissioning, of the

reactor is controlled by BAPETEN;

  • To perform the regulatory control, BAPETEN

has provided several regulations. However, the regulation specifically concerning the decommissioning is not available yet.