Red Wing Bridge Project Red Wing City Council November 12, 2013 Overview of Past Progress Decided to proceed with new two-lane river crossing in current location Completed Bridge 9103 Rehabilitation Study Identified and refined


slide-1
SLIDE 1

Red Wing Bridge Project

Red Wing City Council November 12, 2013

slide-2
SLIDE 2

Overview of Past Progress

  • Decided to proceed with new two-lane river crossing in

current location

  • Completed Bridge 9103 Rehabilitation Study
  • Identified and refined recommended set of concepts for the

MN and WI approach roadways

  • Identified three recommended river bridge types
slide-3
SLIDE 3

Rehab Bridge 9103

slide-4
SLIDE 4

Replace In-place

slide-5
SLIDE 5

Buttonhook

slide-6
SLIDE 6

Minnesota Approach Alternatives

  • Br 9103 Feasibility

& Prudency

  • Evaluation centers on:

– Purpose and Need – Cost Factors – SEE Factors

  • Contamination Issues
slide-7
SLIDE 7

Wisconsin Approach – Recommended Option

slide-8
SLIDE 8

New River Crossing Bridge Concepts

TIED ARCH CONCRETE SEGMENTAL BOX GIRDER STEEL BOX GIRDER

slide-9
SLIDE 9

Tied Arch

  • Least approach roadway

impacts

  • Requires periodic painting
  • Moderately complex

construction & inspection

  • Highest construction cost
slide-10
SLIDE 10

Segmental Concrete Box Girder

  • Greatest approach roadway

impacts

  • Does not require painting
  • Simpler construction &

inspection

  • Most cost effective structure

type

slide-11
SLIDE 11

Steel Box Girder

  • Moderate approach

roadway impacts

  • Requires periodic painting
  • Simple construction &

inspection

  • Cost effective structure

type

slide-12
SLIDE 12

Classic Arch Bridge

slide-13
SLIDE 13

Contemporary Arch Bridge

slide-14
SLIDE 14

Classic Girder Bridge

slide-15
SLIDE 15

Contemporary Girder Bridge

slide-16
SLIDE 16

Next Steps

  • Continue drilling and environmental investigations;
  • Complete evaluation of the Minnesota approach alternatives

and the three bridge types;

  • Obtain public input;
  • Identify the recommended Minnesota approach option and

river bridge type;

  • Proceed with the Environmental Assessment (EA)
slide-17
SLIDE 17

Public Outreach Update

  • Listening Session #4 held earlier today
  • Open House #3 – early 2014
  • Newsletter #3 – to be issued prior to Open House #3
  • Project Presentation Opportunities
  • Website: http://www.dot.state.mn.us/d6/projects/redwing-

bridge/index.html

slide-18
SLIDE 18

Questions / Comments

Chad Hanson, P.E. Senior Design Engineer MnDOT – Rochester 507-286-7637 chad.hanson@state.mn.us