Property Restoration, Brick & Stone Cleaning, Structural Alterations and New Build Stonework o Restoration o New Build o Random Rubble Walling o Reconstruction using new natural or reconstituted stone, cut and formed to the original


  1. Property Restoration, Brick & Stone Cleaning, Structural Alterations and New Build  Stonework o Restoration o New Build o Random Rubble Walling o Reconstruction using new natural or reconstituted stone, cut and formed to the original profiles o Reinstatement of intricate stone porticals, bandings and capitals  Restoration Cleaning o Brick and Stone cleaning using Jos/VorTech, ThermaTech and Doff systems o Paint & Varnish removal from Timber o Paint removal from masonry o Abrasive blasting and Keying  Brick & Blockwork o New Build o Metric, Imperial, Glazed and Profiled Brickwork o Repairs, Forming and Infilling openings within masonry walls o Cementous, Lime mortar pointing including Penny and Tuck pointing o Rebuilding gauged brick arches, facade features and chimney stacks  Render & Plastering o Traditional lime Render; External & Internal o Stucco; Ashlar etc o Decorative Render o Sand/Cement Render o Internal/External Insulated Render o Waterproofing Render o Internal Skimming  Concrete o Concrete Repairs- Ronacrete Approved Contractor  Masonry Decorating o Keim Paints o Lime based paints and Lime Wash

  2. Trinity College – Contract Value; £1,100.000.00 Cementious Render Removal & Re Render in Natural Lime with Ashlar markings. Restoration of the castellations involving remoulding & profiling in roman stucco cement. Internal repairs to traditional lath and plaster and repairs to the stone staircases. Repairs to the internal stone stair case.

  3. Traditional Lime render repairs to the window hoods. Repairs to the Rose & Crown features.

  4. Bodleian Library Oxford – Contract Value; £130,000.00 - Façade Cleaning / Restoration. Tower of London- Contract Value; £30,000.00 - Restoration of The Middle Drawbridge.

  5. Church of St Mary the Virgin – Contract Value - £36,000.00 – Removal of non-breathable paint and façade repairs. Broughton Road, London (Original Victorian Laundry House) – Contract Value £600,000.00 Phase One – Restoration.

  6. Broughton Road; Phase Two - New Build Brick and Blockwork using reclaimed bricks, installation of cast stone and glass blocks.

  7. Gunnersbury Park, London – Contract Value; Circa £1,000,000.00 – Restoration of early 19 th century mansion house with approx. 3000 m2 of traditional renders and masonry repairs. Rebuilding of the parapets.

  8. Reforming profiles and cornices.

  9. Quoins repaired and re rendered. Chimneys re built, re rendered and decorated in traditional mineral paints.

  10. Ashlar Marking. Finished profiled render.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.