P EDESTRIAN AND B ICYCLE I MPROVEMENTS N F ROM M AC A RTHUR B - - PowerPoint PPT Presentation

p edestrian and b icycle i mprovements
SMART_READER_LITE
LIVE PREVIEW

P EDESTRIAN AND B ICYCLE I MPROVEMENTS N F ROM M AC A RTHUR B - - PowerPoint PPT Presentation

Al Roshdieh, Director 614 190 MARYLAND 190 MARYLAND 396 MARYLAND 188 MARYLAND 187 MARYLAND 191 MARYLAND MARYLAND Isiah Leggett, County Executive 188 MARYLAND Meeting Location Walt Whitman High School Project Limit Project


slide-1
SLIDE 1

Al Roshdieh, Director Isiah Leggett, County Executive

Montgomery County Department of Transportation (MCDOT) Division of Transportation Engineering

Project Manager: John B. “JT” Thomas, PTP Phone: (240) 777-7240 Email: John.Thomas@montgomerycounty.gov Mail: Montgomery County Division of Transportation Division of Transportation Engineering 100 Edison Park Drive, 4th Floor Gaithersburg, MD 20878

PUBLIC MEETING

March 8, 2018 Walt Whitman High School Cafeteria 7100 Whittier Blvd., Bethesda, MD 20817

Project Website: http://www.montgomerycountymd.gov/dot-dte/projects/goldsboro/index.html

Virginia

P

  • t
  • m

a c River

Wilson Wilson Wilson Blvd. Blvd. Blvd. R i v e r R i v e r R i v e r L i t t l e L i t t l e L i t t l e F a l l s F a l l s F a l l s P k w y . P k w y . P k w y . R i v e r R

  • a

d R i v e r R

  • a

d R i v e r R

  • a

d R

  • a

d R

  • a

d R

  • a

d Wilson Wilson Wilson G e

  • r

g e t

  • w

n G e

  • r

g e t

  • w

n G e

  • r

g e t

  • w

n Bradley Bradley Bradley Blvd. Blvd. Blvd. Lane Lane Lane Lane Lane Lane MacArthur Blvd. MacArthur Blvd. MacArthur Blvd.

Road Road Road Goldsboro Goldsboro Goldsboro

N

190

MARYLAND

190

MARYLAND

396

MARYLAND

188

MARYLAND

187

MARYLAND

191

MARYLAND

614

MARYLAND

188

MARYLAND

Meeting Location

Walt Whitman High School

Road Road Road Whittier Whittier Whittier Dr.

B a n n bu rn c

  • k

Project Limit Project Limit

Provide Comments by Tonight’s Feedback, Mail, or Email thru April 9, 2018

GOLDSBORO ROAD PEDESTRIAN AND BICYCLE IMPROVEMENTS

FROM MACARTHUR BOULEVARD TO RIVER ROAD

slide-2
SLIDE 2

Al Roshdieh, Director Isiah Leggett, County Executive

Montgomery County Department of Transportation (MCDOT) Division of Transportation Engineering

Project Website: http://www.montgomerycountymd.gov/dot-dte/projects/goldsboro/index.html

GOLDSBORO ROAD PEDESTRIAN AND BICYCLE IMPROVEMENTS

FROM MACARTHUR BOULEVARD TO RIVER ROAD

FINAL DESIGN AND CONSTRUCTION

If approved for full funding and is included in the Capital Improvement Program (CIP), complete final design and construction.

FACILITY PLANNING - PHASE I (2014)

PROJECT PURPOSE

Collect Data, Obtain Public Input, Develop Concept Plans Evaluate and Select Preferred Alignment/Cross Section Obtain Director’s and Montgomery County Council’s Transportation Infrastructure, Energy and Environment Committee (T&E) Approval.

FACILITY PLANNING - PHASE II

Develop 35% Design Plans Detail Project Schedule Detail Project Cost Preliminary Plan Submit to County Council for Approval to Include in Capital Improvement Program (CIP)

THE LIFE OF A TRANSPORTATION PROJECT

WE ARE HERE

Legend Currently Funded Not Funded

Promote pedestrian and bicycling use along the Goldsboro Road corridor Provide connections to existing and proposed pedestrian and bicycle facilities Improve access for pedestrians and bicyclists to transit stops, parks and recreation areas, places of worship, schools and homes Enhance safety for pedestrians and bicyclists along the corridor

slide-3
SLIDE 3

UTILITY POLE UTILITY POLE UTILITY POLE TO BE RELOCATED

OVER MINNEHAHA BRANCH

AT WEDGEWOOD ROAD, STA. 142+25

PEDESTRIAN BRIDGE SIDEWALK WITH GREEN BUFFER + SEPARATED BIKE LANES

SECTION A-A SECTION B-B

SIDEWALK + SEPARATED BIKE LANES

12’-0” CLEAR PATHWAY MINNEHAHA BRANCH

GOLDSBORO ROAD PEDESTRIAN AND BICYCLE IMPROVEMENTS

FROM MACARTHUR BOULEVARD TO RIVER ROAD

slide-4
SLIDE 4

Al Roshdieh, Director Isiah Leggett, County Executive

Montgomery County Department of Transportation (MCDOT) Division of Transportation Engineering

Project Manager: John B. “JT” Thomas, PTP Phone: (240) 777-7240 Email: John.Thomas@montgomerycounty.gov Mail: Montgomery County Division of Transportation Division of Transportation Engineering 100 Edison Park Drive, 4th Floor Gaithersburg, MD 20878

PUBLIC MEETING

March 8, 2018 Walt Whitman High School Cafeteria 7100 Whittier Blvd., Bethesda, MD 20817

Project Website: http://www.montgomerycountymd.gov/dot-dte/projects/goldsboro/index.html

Provide Comments by Tonight’s Feedback, Mail, or Email thru April 9, 2018

GOLDSBORO ROAD PEDESTRIAN AND BICYCLE IMPROVEMENTS

FROM MACARTHUR BOULEVARD TO RIVER ROAD PROJECT PURPOSE

Estimated Right-of-Way Impacts

5 Properties, 10-15’ width

along roadway

Estimated Project Construction Costs

Phase 1: $12M

MacArthur Boulevard to Massachusetts Avenue Phase 2: $10M Massachusetts Avenue to River Road

Estimated Project Schedule

35% Design Completion - Spring 2018

Final Design - To Be Determined Construction - To Be Determined

Proposed Roadway