P ORTABLE S ANITIZATION C HAMBER M IDPOINT P RESENTATION Robertson Beauchamp, Jacob Blackburn, Lauren Kieffer, Elliot Nation, Angel Soto, Dangxian Zha March 7, 2014 Overview Introduction Project Status Chamber Assembly


slide-1
SLIDE 1

PORTABLE SANITIZATION CHAMBER

MIDPOINT PRESENTATION Robertson Beauchamp, Jacob Blackburn, Lauren Kieffer, Elliot Nation, Angel Soto, Dangxian Zha March 7, 2014

slide-2
SLIDE 2

Overview

  • Introduction
  • Project Status

○ Chamber Assembly ○ Procedural Testing ○ Safety Assessment ○ Control System

  • Progression Plan

Jacob Blackburn 1

slide-3
SLIDE 3

CLICK TO EDIT MASTER TITLE STYLE

INTRODUCTION

  • W.L. Gore & Associates
  • Portable Sanitization Chamber
  • Decrease bioburden levels of Bacillus

atrophaeus

  • $3,000 budget

Elliot Nation 2

slide-4
SLIDE 4

CHAMBER ASSEMBLY -FRAME

Elliot Nation 3

slide-5
SLIDE 5

CHAMBER ASSEMBLY

Robertson Beauchamp 4

slide-6
SLIDE 6

CHAMBER ASSEMBLY- FOGGER & LIGHTS

Robertson Beauchamp 5

slide-7
SLIDE 7

PROCEDURAL TESTING

  • Three test strips with

Bacillus atrophaeus

  • Procedures chosen to

validate sanitizing effectiveness

  • Strips exposed in

chamber on stand to test maximum distance

Lauren Kieffer 6

slide-8
SLIDE 8

PROCEDURAL TESTING

  • First Test

○ Exposure to UV without H2O2 vapor ○ Five minute process

  • Second Test

○ Chamber filled with H2O2 vapor for one second ○ Exposed to UV for five minutes ○ Compare results to first test

  • Third Test

○ Chamber filled with H2O2 vapor for five seconds ○ Exposed to UV for five minutes ○ Compare to first and second test

Lauren Kieffer 7

slide-9
SLIDE 9

SAFETY ASSESSMENT

  • Fog machine gets hot during the operating

○ Add proper labels ○ Add heat shield to fog machine for safety

  • Tube starts ‘melting’ as the temperature gets too hot

○ Find tube material with higher melting temperature ○ Or move fogger inside chamber

  • There is a gap in the door seal

○ Softer sealing material ○ Tighten/eliminate spring on door latch

Angel Soto 8

slide-10
SLIDE 10

CONTROL SYSTEM

  • Arduino Uno

microcontroller

  • Will run code and logic

for automated process and user interface

  • Expect to have:

○ Indicator lights ○ Time display ○ Door lock

Angel Soto 9

slide-11
SLIDE 11

CONTROL SYSTEM

  • Current relays incompatible

Switch voltage greater than 5V

  • EE Consultant redirects to new relay

2 Channel 5V High Level Trigger Relay Module for Arduino

www.allelectronics.com www.miniinthebox.com Dangxian Zha 10

slide-12
SLIDE 12

PROGRESSION PLAN

Dangxian Zha 11

slide-13
SLIDE 13

CLICK TO EDIT MASTER TITLE STYLE

Conclusion

  • With the chamber complete,

extensive testing on procedure validity can commence

  • Focus can now be geared towards

addressing and complying with design requirements

Jacob Blackburn 12

slide-14
SLIDE 14

References

  • Relay. Digital image. Www.allelectronics.com. Electronics Corp, n.d. Web.

2 Channel 5V High Level Trigger Relay Module for Arduino. Digital image. Http://www. miniinthebox.com. Miniinthebox, n.d. Web.