New Life Plastics PET and HDPE Recycling Project Changing - - PowerPoint PPT Presentation

new life plastics pet and hdpe
SMART_READER_LITE
LIVE PREVIEW

New Life Plastics PET and HDPE Recycling Project Changing - - PowerPoint PPT Presentation

New Life Plastics PET and HDPE Recycling Project Changing Attitudes to Plastic Waste Increasing international concern over plastic waste including Hong Kong Increasing controls on the trans- shipment of plastic waste


slide-1
SLIDE 1

New Life Plastics – PET and HDPE Recycling Project

slide-2
SLIDE 2
  • Increasing international concern over

plastic waste – including Hong Kong

  • Increasing controls on the trans-

shipment of plastic waste

  • Brand owners desire to be considered

‘Green’ and to meet new standards for incorporating recycled products

  • Recycled plastics materials replacing

virgin materials in production but there is insufficient capacity

  • Closed-loop partnerships enabling high

quality input and output of recycled plastics materials (eg. rPET)

Changing Attitudes to Plastic Waste

Page 2

slide-3
SLIDE 3
  • Hong Kong’s first food grade

quality PET recycling plant

  • Joint Venture between ALBA

Group, Swire Coca-Cola and Baguio Green Group

  • Commence operations in Q3

2020

  • Annual throughput of >35,000

tons

Project Brief

Page 3

slide-4
SLIDE 4

Market Use:

  • eg. rPET-

Bottling High Quality Recyclate Sorting Collection Processing

  • Local Expertise
  • Staffing

Local Partner

  • Construction Experience
  • Operation Know-How
  • Project identification
  • Consumption of end-products

Partners for a Closed-Loop

Pilot project in Hong Kong – New Life Plastics

Page 4

slide-5
SLIDE 5

Ramp-up Phase Prior Operation Start

Exporting Hong Kong PET bales to Germany

Page 5

slide-6
SLIDE 6

EcoPark T6 - New Life Plastic

Page 6

slide-7
SLIDE 7

PET Recycling Process Flow

Page 7

slide-8
SLIDE 8

HDPE Recycling Process Flow

Page 8

slide-9
SLIDE 9

Implementation

  • Building design:

JUL 2019

  • Equipment selection:

SEP 2019

  • Construction start:

SEP 2019

  • Equipment installation

JUN 2020

  • Construction completion:

JUL 2020

  • Testing and commissioning:

AUG 2020

  • Start of operation:

SEP 2020

Page 9

slide-10
SLIDE 10

Planned Green Features

Page 10 Heat recovery from extrusion of HDPE Heat Recovery from Air Compressors PV Panels generate 170,000 kWh/a Energy Saving Lighting System Industrial Water Recycling

slide-11
SLIDE 11