NARUC E le c tric Ve hic le s Sta te Wo rking Gro up
MARCH ME E T I NG MARCH 31, 2020
NARUC E le c tric Ve hic le s Sta te Wo rking Gro up MARCH ME - - PowerPoint PPT Presentation
NARUC E le c tric Ve hic le s Sta te Wo rking Gro up MARCH ME E T I NG MARCH 31, 2020 AGE NDA 3:00 PM Welcome and Introductions (5 minutes) Agenda review Roll call, by state 3:05 PM Panelist Opening Remarks: 5 minutes:
MARCH ME E T I NG MARCH 31, 2020
3:00 PM Welcome and Introductions (5 minutes)
3:05 PM Panelist Opening Remarks:
3:20 PM Panel Discussion (30 minutes)
investments, including whether they think utilities should own and operate charging stations or invest in make-ready infrastructure, as well as the role of the third-party charging industry (see discussion questions below). 3:50 PM Final Panelist Q&A (10 minutes)
4:00 PM Closed Door Discussion
states have taken to date. 4:25 PM Next Steps and Announcements (5 minutes) 4:30 PM Adjourn
Wo rking Gro up Me mb e rs
Sta te s:
Arizo na
Ca lifo rnia
Co lo ra do
Co nne c tic ut
D.C.
F lo rida
Ge o rg ia
Ha wa ii
I llino is
Ma ryla nd
Ma ssa c huse tts
Mic hig a n
Minne so ta
Misso uri
Ne va da
Ne w Je rse y
Ne w Yo rk
No rth Ca ro lina
Ohio
Ore g o n
Pue rto Ric o
So uth Da ko ta
T e xa s
Ve rmo nt
Wa shing to n
Wisc o nsin Na tio na l/ F e de ra l Pa rtne rs:
NARUC
U.S. DOE
U.S. E PA
Pa ne list Ope ning Re ma rks
Phil Jo ne s, Allia nc e fo r T ra nspo rta tio n E le c trific a tio n
Ste fa nie Bra nd, Ne w Je rse y Divisio n o f Ra te Co unse l
Jo sh Co he n, Gre e nlo ts
Phil Jo ne s
E xe c utive Dire c to r, Allia nc e fo r T ra nspo rta tio n E le c trific a tio n
Pa st Pre side nt o f NARUC a nd F
C Co mmissio ne r
phil@ philjo ne sc o nsulting .c o m
Ste fa nie Bra nd
Dire c to r, Ne w Je rse y Divisio n o f Ra te Co unse l
sb ra nd@ rpa .nj.g o v
Headquartered in
Los Angeles,
California
Global footprint with
and in Canada, India, and Southeast Asia Over 150
Employees
and contractors worldwide
Working with
utilities, cities, automakers, fleets & site hosts across the US and the world
Our turnkey approach to charging infrastructure EV Charging Network Software Smart Charging Optimization
Operate & monitor networks of charging stations
Digital Mobility Solutions
Site-focused energy management Digital platforms for fleets and auto OEMs to expand their emobility offerings
Grid Balancing Services
Aggregate and leverage EV load to maintain grid reliability and efficiency
Program Management Engineering & Commissioning Software & Mobile App Customer Support and O&M
Acquired by
Shell in January
2019 Founded in 2008 with over a decade
Choice of hardware
Josh Cohen, Director of Policy (410) 989-8121 jcohen@greenlots.com
F a c ilita to rs
Wo rking Gro up Cha ir Ma ria Bo c a ne g ra a nd I
llino is Co mme rc e Co mmissio n Sta ff
Wo rking Gro up Vic e -c ha ir Ja so n Sta ne k a nd Ma ryla nd Pub lic
Se rvic e Co mmissio n Sta ff
T
Ha s yo ur sta te re c e ive d a ny utility pro po sa ls to inve st in E
V c ha rg ing infra struc ture (E VSE )? Wha t fina l de c isio n wa s re a c he d?
Who o wns a nd o pe ra te s the E
VSE , if a llo we d?
Do a ny utilitie s in yo ur sta te ha ve ma ke -re a dy o r re b a te pro g ra ms? Why did yo u a rrive to the se c o nc lusio n?
Se e a lso pa g e s 16-24 o f the NARUC re po rt, E le c tric Ve hic le s: Ke y T re nds, I ssue s, and Co nside ratio ns fo r S tate Re g ulato rs (http:/ / bit.ly/ E Vke ytre nds)
Ho w do yo u think a b o ut the q ue stio ns a ske d o f the pa ne lists?
1.
Wha t wo uld yo u e nvisio n a s the ide a l utility ro le in E V c ha rg ing ?
Ho w do yo u think a b o ut the q ue stio ns a ske d o f the pa ne lists?
1.
Wha t wo uld yo u e nvisio n a s the ide a l utility ro le in E V c ha rg ing ?
2.
Wha t a re the pro s a nd c o ns o f utilitie s o wning a nd o pe ra ting c ha rg ing infra struc ture ?
Ho w do yo u think a b o ut the q ue stio ns a ske d o f the pa ne lists?
1.
Wha t wo uld yo u e nvisio n a s the ide a l utility ro le in E V c ha rg ing ?
2.
Wha t a re the pro s a nd c o ns o f utilitie s o wning a nd o pe ra ting c ha rg ing infra struc ture ?
3.
Wha t a re the pro s a nd c o ns o f utilitie s ra te b a sing o the r inve stme nts (inc luding ma ke -re a dy infra struc ture o r c ha rg e r re b a te pro g ra ms)?
Ho w do yo u think a b o ut the q ue stio ns a ske d o f the pa ne lists?
1.
Wha t wo uld yo u e nvisio n a s the ide a l utility ro le in E V c ha rg ing ?
2.
Wha t a re the pro s a nd c o ns o f utilitie s o wning a nd o pe ra ting c ha rg ing infra struc ture ?
3.
Wha t a re the pro s a nd c o ns o f utilitie s ra te b a sing o the r inve stme nts (inc luding ma ke -re a dy infra struc ture o r c ha rg e r re b a te pro g ra ms)?
4.
I s the utility b e tte r suite d to c e rta in c ha rg ing a pplic a tio ns tha n
C, unde rse rve d a re a s, e tc .)
NARUC Re po rt o n E Vs
“E
le c tric Ve hic le s: K e y T re nds, I ssue s, a nd Co nside ra tio ns fo r Sta te Re g ula to rs” wa s re le a se d in De c e mb e r
F
e e l fre e to sha re with c o lle a g ue s: http:/ / b it.ly/ E Vke ytre nds
April Me e ting :
T
F
ina l da te , spe a ke rs, a nd a g e nda to c o me Ne w E VSWG L istse rv: NARUC-E VSWG@ lists.na ruc .o rg Re c o rding s o f pa st E VSWG me e ting s: www.na ruc .o rg / c pi/ c pi-pa st-e ve nts/