DCPT The Danish Centre of Particle Therapy
Information meeting – November 26, 2014
DCPT The Danish Centre of Particle Therapy Information meeting - - PowerPoint PPT Presentation
DCPT The Danish Centre of Particle Therapy Information meeting November 26, 2014 The Danish Centre of Particle Therapy Information meeting Agenda Welcome and introduction The project from a clinical view Information
Information meeting – November 26, 2014
The Danish Centre of Particle Therapy – Information meeting
Agenda
–
Welcome and introduction
–
The project from a clinical view
–
Information about the equipment tender
–
Information about the building tender
–
The prequalification round
–
Any other business
26-11-2014 DCPT - Information meeting - November 26, 2014 2
The Danish Centre of Particle Therapy – Information meeting
The project from a clinical view - by professor, chief physician Cai Grau, Aarhus University/ Aarhus University Hospital
26-11-2014 DCPT - Information meeting - November 26, 2014 3
The Danish Centre of Particle Therapy – Information meeting
Information about the equipment tender
–
General time schedule
–
Status as per today
–
Anticipated plan of activities
26-11-2014 DCPT - Information meeting - November 26, 2014 4
Building: Time from contract to start of installation of equipment: 15 months Equipment: Time from contract to delivery
installation: 20 months
26-11-2014 DCPT - Information meeting - November 26, 2014 5
The Danish Centre of Particle Therapy – Information meeting
Information about the building tender
–
Time schedule for prequalification, dialogue and the tendering process
–
Expectations of:
– The dialogue process – The contractor – The advisors – The design phase – User involvement – Cooperation
26-11-2014 DCPT - Information meeting - November 26, 2014 6
The Danish Centre of Particle Therapy – Information meeting
26-11-2014 DCPT - Information meeting - November 26, 2014 7
–
Time schedule for prequalification, dialogue and the tendering process
The Danish Centre of Particle Therapy – Information meeting
What are we building?
– Site area approx. 5000 m2 (64m x 78m) – Floor area approx. 8000 m2 – Located in the south-west corner of The New University
Hospital (DNU)
– As an extension of the oncological research centre – Next to the existing oncological functions
– Overall economy approx. DKK 800 mill.
– construction economics approx. DKK 330 mill.
– First patient expected at the beginning of 2018
26-11-2014 DCPT - Information meeting - November 26, 2014 8
The Danish Centre of Particle Therapy – Information meeting
Where are we building?
26-11-2014 DCPT - Information meeting - November 26, 2014 9
The Danish Centre of Particle Therapy – Information meeting
26-11-2014 DCPT - Information meeting - November 26, 2014 10
The Danish Centre of Particle Therapy – Information meeting
26-11-2014 DCPT - Information meeting - November 26, 2014 11
The Danish Centre of Particle Therapy – Information meeting
26-11-2014 DCPT - Information meeting - November 26, 2014 12
The Danish Centre of Particle Therapy – Information meeting
26-11-2014 DCPT - Information meeting - November 26, 2014 13
The Danish Centre of Particle Therapy – Information meeting
Expectations for the dialogue process
–
The dialogue material will include (incomplete):
– BID (Building Information Document) from the equipment supplier – Functional requirements on the building – Room data programme with requirements on each room with
reference to size, function, content etc.
– Interfaces and requirements on proximity to other rooms in DCPT – Interfaces and requirements on proximity to other functions at DNU – Descriptions of patient cases and logistics flow – Technical requirements – General conditions – And other matters
26-11-2014 DCPT - Information meeting - November 26, 2014 14
The Danish Centre of Particle Therapy – Information meeting
Expectations for the dialogue process
–
The turnkey contractor must challenge the technical requirements of BID so that it is optimised as much as possible with regard to:
– Radiation protection / optimisation / execution – Technical supplies – Construction schedule – Incentive schemes –
Suggestions of the turnkey contractor of how to solve critical issues from the room data programme to general discussions with users
–
Interfaces and risk areas
–
Constructability
–
The cooperation with the equipment supplier and the builder in general
–
Quality assurance
26-11-2014 DCPT - Information meeting - November 26, 2014 15
The Danish Centre of Particle Therapy – Information meeting
Expectations for the turnkey contractor
–
Qualifications
– Competencies of management of complex building projects,
technically as well as timewise
– Competencies of cooperation with major external suppliers – Competencies of communication in other languages – primarily
English – and with people with different cultural backgrounds
– Extensive professional knowledge of execution of complex concrete
constructions
– Competencies of radiation protection – Experience of user involvement – The wish and the will to cooperation
26-11-2014 DCPT - Information meeting - November 26, 2014 16
The Danish Centre of Particle Therapy – Information meeting
Expectations for the advisors
–
Qualifications
– Extensive professional knowledge and competencies of – Radiation protection – Complex concrete constructions – Complex technical installations – Building of hospitals – User involvement – Communication in other languages – primarily English – and with
people with different cultural backgrounds
– Necessary focus and capacity – Compliance with the stages and benchmarks of the project – The wish and the will to cooperation
26-11-2014 DCPT - Information meeting - November 26, 2014 17
The Danish Centre of Particle Therapy – Information meeting
The prequalification round
– Formal requirements – Number of prequalified turnkey contractor teams – Submission of prequalification material – Announcement of selected prequalified turnkey contractor teams – Fee
26-11-2014 DCPT - Information meeting - November 26, 2014 18
The Danish Centre of Particle Therapy – Information meeting
The prequalification round
–
Formal requirements
– Prequalification document on the internet as a help – The contract notice, item III.2.1)
– The contract notice, item III.2.2)
solvency ratio in schematized form for the most recent 3 years, supplemented with the corresponding annual accounts
changes since the latest published accounts
26-11-2014 DCPT - Information meeting - November 26, 2014 19
The Danish Centre of Particle Therapy – Information meeting
The prequalification round
–
Formal requirements
– The contract notice, III.2.3)
comparable projects with emphasis on radiation protection, concrete technology, building of hospitals, technically complex buildings etc. A maximum of 15 references in total and a minimum of 3 references from each member of the team
26-11-2014 DCPT - Information meeting - November 26, 2014 20
The Danish Centre of Particle Therapy – Information meeting
The prequalification round
–
Number of prequalified turnkey contractor teams
contractor teams are anticipated to be selected on the basis of the
–
Submission of prequalification material
B stick as well as 1 original and 5 copies in ” hard copy” .
–
Fee
conditional tender will receive a fee corresponding to EUR 40.000,-
26-11-2014 DCPT - Information meeting - November 26, 2014 21
The Danish Centre of Particle Therapy – Information meeting
–
Any other business
26-11-2014 DCPT - Information meeting - November 26, 2014 22