Wo rking Gro up Car eer Center Final Report October 4, 2018 Career Center Working Group Charge June 2017, School Board adopted plan for 700-800 HS seats on the Career Center site. The CCWG was asked to: Plan to define how APS opens


slide-1
SLIDE 1

October 4, 2018 Car eer Center Wo rking Gro up

Final Report

slide-2
SLIDE 2

Career Center Working Group Charge

June 2017, School Board adopted plan for 700-800 HS seats on the Career Center site. The CCWG was asked to:

  • Plan to define how APS opens seats at CC by 2022
  • Analyze, evaluate, and plan how to optimize Career Center site and how

to accommodate a fourth HS

  • Determine long-term plan for Columbia Pike Library
  • Identify needed facilities, transportation and parking goals
  • Develop phased plan for development

Joint project of Arlington County and APS

2

slide-3
SLIDE 3

Process and Timeline

  • 34 stakeholders
  • 8 months (Jan-Aug 2018)
  • 18 meetings

3

slide-4
SLIDE 4

Study Area

4

slide-5
SLIDE 5

Meeting the Charge

  • Items impacting CCWG conversations and recommendations:
  • Revised High School Projections
  • Available Funding and Timing for the Phased Development Plan
  • Maximum (Long-Term) Capacity for High School Seats at the Career

Center Site

  • Distinction between APS Neighborhood High Schools VS Secondary

Option Programs

  • Access to Sports Facilities

5

slide-6
SLIDE 6

Overall Vision for the Career Center Site

  • Create the “Jewel of the Pike”
  • Improve upon available amenities
  • Contribute to place-making on Columbia Pike
  • Create a building exterior to equal the excellent education offered within
  • Near-Term (CIP FY2019-2028)
  • Add 800 students while retaining existing CC programs, including Arlington Tech

expansion, Arlington Community High School, Montessori program and Columbia Pike Library

  • Long-Term (beyond 2028)
  • Site should become a high school campus
  • Until most facilities delivered, high school seats should remain Option seats
  • Additional site density possible subject to on-site facilities & parking

6

slide-7
SLIDE 7

Areas of Consensus

  • Site Facilities
  • Open Space
  • Building Design
  • Sustainability
  • Massing and Density
  • Site Phasing
  • Parking, Transportation and Transportation Demand

Management (TDM)

  • Public Library and South Block

7

slide-8
SLIDE 8

Recommendations

  • Site Facilities
  • Build for maximum future adaptability and growth, including common spaces
  • All Arlington students deserve quality indoor and outdoor spaces
  • With additional facilities built, most after-school sports and club activities may be

accommodated

  • APS facilities designed to allow maximum use by the community
  • Underground structures designed to allow for re-orientation of future fields
  • Open Space
  • Existing uses of sports facilities throughout the County must be revisited to ensure

students have opportunities to play sports

  • Informal and passive open space should be included, in addition to sports fields
  • Exterior lighting designed to minimize light pollution/spillover into neighborhood

8

slide-9
SLIDE 9

Recommendations

  • Building Design
  • Emphasize glass and natural light
  • Build with Universal Design in mind
  • Consider need for future expansion and flexibility
  • Locate high-bay CTE spaces partially below grade
  • Ensure any onsite parking is underground and adaptable to future educational uses
  • Maximize use of the roofs for school and/or environmental uses (gardens, useable green roofs, solar

panels)

  • Sustainability
  • Emphasis on energy conservation and sustainability through architecture design, materials and

construction methods

  • Renewable energy strategically considered by BLPC/PFRC for both near-term and long-term

phases as vision is incrementally achieved

9

slide-10
SLIDE 10

Recommendations

10

  • Massing and Density
  • S. Highland Street

setback to reflect residential setbacks to create cohesive character

  • Buildings should transition

up from proximity to homes

slide-11
SLIDE 11

Recommendations

  • Site Phasing (Near-Term)
  • Majority of facilities identified in FY2019-28 CIP
  • Build any underground parking with multi-use

field at grade

  • Relocate CTE spaces to new S. Highland

building

  • Build 3rd story on top of existing Career Center

building

  • Create multi-level education space along 9th

and S. Walter Reed, including common spaces

  • Build as large as possible now, even if some

floors are roughed out for future use

11

slide-12
SLIDE 12

Recommendations

12

  • Site Phasing (Long-

Term)

  • Complete roughed-out

areas for educational spaces

  • Relocate Montessori

program to another site

  • Raze Patrick Henry

building to expand sports facilities and green space

  • Build a pool for education

and community uses

slide-13
SLIDE 13

Recommendations

  • Parking, Transportation and TDM
  • Provide assessment of parking needs for a neighborhood and option

school at this site

  • Study whether a robust TDM program could reduce overall parking

needs

  • Inform a parking program to include a balance of on-site and off-site

parking

  • Consider costs, site constraints and neighborhood concerns
  • Any further lease or an acquisition of ECDC parking garage should be

informed by structural assessment

13

slide-14
SLIDE 14

Recommendations

  • Public Library and South Block
  • County should acquire the South Block properties willing to sell
  • Relocate Columbia Pike Library to anchor new development fronting

Columbia Pike

  • Plan for cultural uses, such as museums, gallery spaces and

performing arts space

  • Street frontage for student services to be offered to community

(hairstyling, barber, auto services, pop-up restaurant, computer repair)

  • Space for higher education classrooms, and partnerships with local

colleges and universities to build out site

  • Relocate Arlington Community High School, if space would be superior

to the current space

14

slide-15
SLIDE 15

Follow-On Work

  • The CCWG recommends the following:
  • Visioning process to identify APS school sites and define buildings of

the future

  • Comprehensive assessment of field spaces and athletic uses
  • South Block acquisition and development
  • Parking, Transportation and TDM study
  • Integration of site history into the development of the Career Center

site, including an archeological assessment prior to construction and monitoring during construction

  • That each of these be acted upon and overseen jointly by the County

and School Boards

15

slide-16
SLIDE 16

Next Steps

  • Before Fall 2019
  • All recommendations for follow-on work area acted upon
  • Parking and transportation study is completed
  • Fall 2019
  • Building Level Planning Committee (BLPC)
  • Public Facilities Review Committee (PFRC)

16

slide-17
SLIDE 17

“Cooperative, coordinated, long-range planning processes are Arlington’s best opportunity to continue delivering the excellent education provided by APS while finding comprehensive solutions that make efficient use

  • f our limited land and dollars.”
  • p. 53, Career Center Working Group Final Report, 2018

17