Los Angeles County Metropolitan Transportation Authority Metro Rail System Present and Future November 9, 2017 1 Metro Rail System 2016 New Line Extensions 2017 Metro Rail Facts-at-a-Glance 6 Lines 93 Stations 105 Route


slide-1
SLIDE 1

Los Angeles County Metropolitan Transportation Authority

Metro Rail System

Present and Future November 9, 2017

1

slide-2
SLIDE 2

Metro Rail System –

2016

New Line Extensions

slide-3
SLIDE 3

2017 Metro Rail Facts-at-a-Glance

  • 6 Lines
  • 93 Stations
  • 105 Route Miles (17.4 miles subway)
  • 364 Rail Cars (104 Subway, 260 Light Rail)
  • 348,505 Average Weekday Ridership
  • 111,458,473 Annual Ridership
  • Service Hours
  • 4:30am – 1:00am Sunday- Thursday
  • 4:30am – 2:00am Friday- Saturday
  • $1.75 general fare (2 hours)
slide-4
SLIDE 4

Under Construction

  • Crenshaw/LAX LRT Transit Project – Crenshaw/

Exposition to the Green Line (October 31,2019)

– 8.5 miles, 8 stations – LAX APM Station at 96th St.

  • Regional Connector LRT Project – 7th St./ Metro

Center to 1st/Alameda (2021)

– 1.8 miles, 3 stations

  • Purple Line Subway Segments 1 and 2 –

Wilshire/Western to Century City

– 6.5 miles, 5 stations (2024)

slide-5
SLIDE 5

Preparing to Submit Full Funding Grant Agreement (FFGA)

  • Purple Line Subway Segment 3 – Century City

to UCLA/Westwood/Veterans Admin. Hospital

– 2.6 miles, 2 stations (2026)

slide-6
SLIDE 6

Metro Rail System -

2021

Regional Connector Crenshaw Line

slide-7
SLIDE 7

Metro Rail System -

2026

Purple Line

slide-8
SLIDE 8

Metro Rail Regional Destinations

2026

  • Downtown Los Angeles
  • Exposition Park/USC/Culver City
  • Santa Monica
  • Long Beach
  • Wilshire (Beverly Hills/Century City/Westwood)
  • Hollywood/San Fernando Valley
  • Norwalk/Redondo Beach
  • Crenshaw District/LAX
  • San Gabriel Valley
  • East Los Angeles
slide-9
SLIDE 9

MEASURE M PROJECTS METRO RAIL: CIRCA FY2025-FY2047

FY25 Gold Line Foothill Extension Phase 2B: Azusa to Claremont (Montclair) (Foothill Construction Authority) FY27 East San Fernando Valley Light Rail Project: Orange Line to Sylmar via Van Nuys Bl. FY28 West Santa Ana Branch Light Rail Project Phase 1: Artesia to Green Line FY30 Green Line South Bay Light Rail Extension: Redondo Beach to Torrance FY33 Sepulveda Pass Transit Corridor Project Rail Phase 1: San Fernando Valley/Orange Line to Westwood FY35 Gold Line Eastside Extension Project Phase 2: East Los Angeles to either El Monte or Whittier FY41 West Santa Ana Branch Project Phase 2: Green Line to Union Station / Downtown Los Angeles FY47 Crenshaw Line Northern Extension Project: Exposition Line to Red Line via Purple Line

slide-10
SLIDE 10

MEASURE M PROJECTS METRO RAIL: CIRCA FY2048-FY2067

FY52 Green Line Extension Project: Norwalk to Santa Fe Springs Metrolink Station FY57 Gold Line Eastside Extension Project Phase 3: East Los Angeles to either El Monte or Whittier FY57 Orange Line Bus Rapid Transit to Light Rail Transit Conversion Project: Warner Center to North Hollywood FY57 Sepulveda Pass Transit Corridor Project Rail Phase 2: Westwood to 96th St. /LAX Station via Exposition Line FY67 Lincoln Line BRT to LRT Conversion: 96th St. /LAX Station to Santa Monica FY67 Orange Line Light Rail Extension Project: North Hollywood to Pasadena FY67 Vermont Transit Corridor Project: Wilshire to Green Line

slide-11
SLIDE 11

Metro Rail 2067