marine refrigeration and air conditioning our history
play

marine refrigeration and air conditioning Our History Headquarters - PDF document

marine refrigeration and air conditioning Our History Headquarters Shipbuilding Industry Research & Development Certifjcates & quality advantages Production Department Refrigeration & A/C Units Chillers & MGO Unit Chillers


  1. marine refrigeration and air conditioning

  2. Our History Headquarters Shipbuilding Industry Research & Development Certifjcates & quality advantages Production Department Refrigeration & A/C Units Chillers & MGO Unit Chillers Coils Electric panel with PLC Service Trade Our network Our Products

  3. 1969 John Ligeros founded 1987 The partnership is sus- 1990 Initiating the commer- Psyctotherm as a ship repair pended and the company is ful- cial activity of the company, company for refrigeration and ly undertaken by John Ligeros . John Ligeros is appointed with air conditioning equipment. The main activity of the compa- the representation of compa- ny is concentrated to the main- nies GRASSO GEA , DORIN , and 1974 The company operates tenance and repairs of marine BUUS . cooperatively with mr E. Psath- refrigerating machines and air as and mr J. Iatros, adding new 1996 Relocates to own build- conditions. activity for manufacturing of ca- ing of 750 sqm in Piraeus 72, tering equipment for ships. Chr. Smirnis str. Member of TradeNet the world’s largest maritime e-commerce platform. Hellenic Marine Equipment Manufacturers and Exporters. Worldwide Industrial & Marine Association. OUR HISTORY OUR HISTORY

  4. 2002 George Ligeros , fully un- 2008 A new activity starts this R&D department is stafged by dertakes the company and de- year, the manufacturing of re- mechanical engineers. velops it further. frigeration and air conditioning Manufacturing, assembly, ser- units, and the old building is 2006 Psyctotherm owns 2 vice sections stafged by special- converted into a workshop. buildings where the offjces, the ized technicians and electri- workshop, the machinery and 2011 Acquires a coils manu- cians under the supervision of a the spare parts warehouse are facturing industry and start de- production engineer. accommodated. veloping the new activity. 2014 Coils manufacturing in- New departments are created dustry relocates to headquar- and stafged with specialized ters. personnel. Our philosophy We constantly look into new possibilities of development. We focus on continuous training education and evaluation of our permanent stafg. We renew the equipment with machines of new technology for our production line. We research for new materials, methods and solutions; this keeps us efgective and competitive. Our plan is directed to manufacture marine refrigeration and air-condition units according to our customer’s demands. We expand our activities worldwide with an agent network.

  5. Headquarters The company operates on its own facilities at Pi- raeus in total area of 1800sqm. We cover all our activities, commercial shop, stor- ages, offjces, and workshop for maintenance and manufacturing. Features modern machinery equipment and new technology for our production line. Machinery equipment • 3 set fjn press lines for 3/8” , 1/2” , 5/8” • 3 set tube cutting machines for 3/8” , 1/2” , 5/8” • 3 set tube bending machines for 3/8” , 1/2” , 5/8” • 3 set tube expansion equipment for 3/8” , 1/2” , 5/8” • CNC Punching machine 6mm • CNC Sheet Metal Cutting machine 3000 x 6 mm • CNC Sheet Metal Bending machine 3000 x 6 mm • Supplementary equipment

  6. Shipbuilding Industry On each new installation, our technician - consultant visits the installation site and records the desired op- erating conditions of the unit and the details of the installation. A preliminary study is prepared by our engineers which includes the sizing of the unit, the preliminary selection of the proper equipment, the design of the unit on 3D drawing and the presentation of the unit to the client. The design takes into account the special conditions of the sea, the demands of the client and the proper sizing of the unit in order to achieve maximum capac- ity with minimum power consumption and accom- plish the highest level of effjciency. As soon as the fjnal solution is concluded, the equip- ment and raw materials are gathered. We use latest technology equipment and high quality raw materials purchased from well known manufactures, in order to achieve long lifetime of the unit. The unit is assembled on our production line and runs a test operation. When the unit is ready, it is transported to the installa- tion site and placed on the ship. After the installation of the unit our company can ofger maintenance and repair services throughout the life- time of the unit.

  7. Calculation The heating/cooling capacity and effjciency Research & of each unit needed for a specifjc application is determined by a throught analysis carried Development out for the specifjc working conditions and demands. The use of specialized design and calculation software refmects the actual operating con- ditions as accurately as possible in order to dimension the units appropriately. Our com- pany has developed calculation methods that take into account the specifjc needs of marine environment. Design Coil Calculation All units are designed with 3D CAD/CAM soft- The fjnned heat exchangers are calculated with ware in order to determine the dimensions and the specialized UNILAB COILS software for one- perform a static and dynamic analysis of the phase (water coils) and two-phase (evapora- units. The balance point of the fans, the com- tors, condensers, steam coils) fmows. The analy- pressors, the pumps, the coils is evaluated in sis takes into account every detail in order to order to calculate the heating/cooling capac- evaluate the coil performance such as the geo- ity and the effjciency of the unit on the specifjc metric characteristics, the air fmow and static conditions. pressure, the environment temperature and humidity, the liquid characteristics, the pres- sure drop, the fouling factor and much more.

  8. Certifjcates & Quality Advantages With each new unit the customer is provided with: Certifjcates All units are manufactured in a production • An operation manual with installation and line certifjed with ISO 9001 for quality assur- operating instructions. ance. All the relevant standards and directives • A maintenance and service manual with a (EN standards, IEC standards, DIN standards, troubleshooting guide. ECC directives) are closely followed at all stag- • Schemes of the electric panel and connec- es of design and production. Class aproval tions. also available upon request. Our company is • Test report. qualifjed in sellihca with ID 114760. • CE declaration of conformity. Guarantee We provide products and services taking into account the customer’s needs. We can guarantee the high performance and long lifetime of our products. We provide 1 year guarantee for the HVAC and refrigeration units and coils. Test certifjcate from a third party inspection-certifjcation group is available upon request. Quality advantages • Top quality raw materials • Technical support • State of the art computer software for 3D • After sales support modeling, design and analysis. • Competitive cost and on-time delivery • Modern specialized machinery equipment. • Quality control for improving of our products. • Qualifjed and specialized stafg.

  9. • Condensers: An air cooled, sea water cooled or • Compressors: The units include a scroll, semi- • Fans: The air conditions can include a centrifugal • Evaporators: Are made of copper tubing with Production Department Available units: • Deck air condition units. • Packaged water cooled air condition unit. • Split air cooled air condition unit (special for wheelhouse). • Direct expansion air condition units. • Refrigeration units. Units technical characteristics: hermetic or open type compressors. fresh water cooled condenser can be installed. aluminum fjns, designed and specially dimen- sioned to obtain the maximum output. Optionally an anti-corrosive treatment on the evaporator fjns against sea breeze can be performed. or plug fan with high air fmow.

  10. • Electric panel: The electrical box includes all the components • Safety devices: If the units are out of order, their operation is Refrigeration & A/C Units and terminal blocks needed for the installation. It includes an automatic switch, relay, thermal protection, indicator lights, etc. automatically stopped by various safety and protective devices. Manufacturing Process - Study and design with specialized software. - Mounting of the unit frame. - Assembly of the unit parts (compressor, condenser, e.t.c.). - Installation of the electric panel. - Installation, connection and soldering of the refrigeration pipes and parts (valves, gauges, fjlters, e.t.c.). - Connection of the electric wires on the terminals. - Leak pressure test of the unit with nitrogen. - Creation of vacuum and refrigerant fjlling. - Test run of the unit.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend